2020 No. 862
Infrastructure Planning
The Thames Water Utilities Limited (Thames Tideway Tunnel) (Amendment) (No. 2) Order 2020
Made 13th August 2020
Coming into force 14th August 2020

The Secretary of State for Housing, Communities and Local Government in whom the power conferred by paragraph 2(1) of Schedule 6 to the Planning Act 2008 (“the 2008 Act”) is now vested together with the Secretary of State for Environment, Food and Rural Affairs (together referred to as the “Secretary of State”) make this Order in exercise of that power.
An application has made been under paragraph 2 of Schedule 6 to the 2008 Act, and in accordance with Part 1 of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material change to the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (“the 2014 Order”).

In accordance with paragraph 2 of Schedule 6 to the 2008 Act, the Secretary of State has had regard to the effect of the change, together with the previous changes made under that paragraph, on the 2014 Order as originally made, and is satisfied that the change to the 2014 Order is not material.
Citation and Commencement
1 

(1) This Order may be cited as the Thames Water Utilities Limited (Thames Tideway Tunnel) (Amendment) (No. 2) Order 2020 and comes into force on the day after the day on which it is made.
(2) In this Order, “the 2014 Order” means the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014.
Amendment of the 2014 Order
2 

(1) The 2014 Order is amended as follows.
(2) Schedules 2 and 3 (Plans and Requirements) are amended as set out in the tables in Schedules 1 and 2 to this Order, where—
(a) column 1 sets out the provision to be amended;
(b) column 2 sets out the current text; and
(c) column 3 sets out the text to be substituted for the current text.
Certification of substituted plans, etc.
3 

(1) The undertaker must, as soon as practicable after the making of this Order, submit copies of the substituted plans referred to in—
(a) the third column of the table in Schedule 1, and
(b) the third column of the table in Schedule 2to the Secretary of State for certification in accordance with paragraph (2).
(2) The Secretary of State may certify copies submitted under paragraph (1) as true copies of the plan or document.
(3) A plan or document so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
(4) In paragraph (1), the “undertaker” has the same meaning as in article 2(1) of the 2014 Order.
For and on behalf of the Secretary of State
Kirstin Green
Deputy Director, Water Quality
Department for Environment, Food and Rural Affairs
12th August 2020For and on behalf of the Secretary of State
Pedro Wrobel
Director, Planning
Ministry of Housing, Communities and Local Government
13th August 2020
SCHEDULE 1
Amendments to Schedule 2 to the 2014 Order
Article 2(2)


Provision to be amended Current text Text to be substituted for the current text
Part 4 (“Approved Plans”) Table 1, column 3 “DCO-PP-16X-VCTEF-180008 – rev 3” “DCO-PP-16X-VCTEF-180008 – rev 4”
Part 4 (“Approved Plans”) Table 1, column 3 “DCO-PP-17X-BLABF-190006 – rev 1” “DCO-PP-17X-BLABF-190006 – rev 2”
Part 4 (“Approved Plans”) Table 1, column 3 “DCO-PP-17X-BLABF-190007 – rev 2” “DCO-PP-17X-BLABF-190007 – rev 3”
Part 4 (“Approved Plans”) Table 1, column 3 “DCO-PP-17X-BLABF-190010 – rev 2” “DCO-PP-17X-BLABF-190010 – rev 3”
Part 4 (“Approved Plans”) Table 1, column 3 “DCO-PP-17X-BLABF-190022 – rev 1” “DCO-PP-17X-BLABF-190022 – rev 2”
Part 4 (“Approved Plans”) Table 1, column 3 “DCO-PP-17X-BLABF-190023” “DCO-PP-17X-BLABF-190023 – rev 1”
SCHEDULE 2
Amendments to Schedule 3 to the 2014 Order
Article 2(2)


Provision to be amended Current text Text to be substituted for the current text
Table in paragraph 17 (Blackfriars Bridge Foreshore), Details of works to listed buildings, Ref BLABF11 – third column, sub-paragraph (1) “(1) Works to the listed embankment wall and Blackfriars Bridge shall not commence until details of those works, which shall accord with the design principles for this site, the maximum temporary and permanent extent of loss of listed buildings/structures (Drawing No. DCO-PP-17X-BLABF-190022 – rev 1, DCO-PP-17X-BLABF-190023), As existing listed structure interface – Bridge stairs (west) (Drawing Nos. DCO-PP-17X-BLABF-190041 and DCO-PP-17X-BLABF-190042) and As existing listed structure interface – bridge stairs (east) (Drawing Nos. DCO-PP-17X-BLABF-190043 and DCO-PP-17X-BLABF-190044), are submitted to and approved by the relevant planning authority in consultation with the HBMCE.” “(1) Works to the listed embankment wall and Blackfriars Bridge shall not commence until details of those works, which shall accord with the design principles for this site, the maximum temporary and permanent extent of loss of listed buildings/structures (Drawing No. DCO-PP-17X-BLABF-190022 – rev 2, DCO-PP-17X-BLABF-190023 – rev 1), As existing listed structure interface – Bridge stairs (west) (Drawing Nos. DCO-PP-17X-BLABF-190041 and DCO-PP-17X-BLABF-190042) and As existing listed structure interface – bridge stairs (east) (Drawing Nos. DCO-PP-17X-BLABF-190043 and DCO-PP-17X-BLABF-190044), are submitted to and approved by the relevant planning authority in consultation with the HBMCE.”