
COMMISSION IMPLEMENTING DECISION (EU) 2016/1926 of 3 November 2016 on the approval of the battery-charging photovoltaic roof as an innovative technology for reducing CO2 emissions from passenger cars pursuant to Regulation (EC) No 443/2009 of the European Parliament and of the Council (Text with EEA relevance) 

THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EC) No 443/2009 of the European Parliament and of the Council of 23 April 2009 setting emissions performance standards for new passenger cars as part of the Community's integrated approach to reduce CO2 emissions from light-duty vehicles, and in particular Article 12(4) thereof,
Having regard to Commission Implementing Regulation (EU) No 725/2011 of 25 July 2011 establishing a procedure for the approval and certification of innovative technologies for reducing CO2 emissions from passenger cars pursuant to Regulation (EC) No 443/2009 of the European Parliament and of the Council, and in particular Article 10(2) thereof,
Whereas:

(1) The application submitted by the supplier a2solar Advanced and Automotive Solar Systems GmbH (‘the applicant’) on 4 February 2016 for the approval of the battery charging photovoltaic roof as an eco-innovation has been assessed in accordance with Article 12 of Regulation (EC) No 443/2009, Implementing Regulation (EU) No 725/2011 and the Technical Guidelines for the preparation of applications for the approval of innovative technologies pursuant to Regulation (EC) No 443/2009.

(2) The information provided in the application demonstrates that the conditions and the criteria referred to in Article 12 of Regulation (EC) No 443/2009 and in Articles 2 and 4 of Implementing Regulation (EU) No 725/2011 have been met. As a consequence, the battery charging photovoltaic roof proposed by the applicant should be approved as an innovative technology.

(3) By Implementing Decisions 2014/806/EU and (EU) 2015/279 the Commission has approved two applications concerning battery charging photovoltaic roofs. Based on the experience gained from the assessment of those applications as well as the current application, it has been satisfactorily and conclusively demonstrated that a battery charging photovoltaic roof meets the eligibility criteria referred to in Article 12 of Regulation (EC) No 443/2009 and Implementing Regulation (EU) No 725/2011 and provides a reduction in CO2 emissions of at least 1 g CO2/km compared to a baseline vehicle. It is therefore appropriate to generally acknowledge and, in accordance with Article 12(4) of Regulation (EC) No 443/2009, attest the capacity of this innovative technology to reduce CO2 emissions and provide a generic testing methodology for the certification of the CO2 savings.

(4) It is therefore appropriate to provide manufacturers with the possibility to certify the CO2 savings from battery charging photovoltaic roofs that meet those conditions. In order to ensure that only photovoltaic roofs that are compliant with those conditions are proposed for certification, the manufacturer should provide a verification report from an independent and certified body confirming the compliance of the component with the conditions specified in this Decision together with the application for certification submitted to the type approval authority.

(5) If the type approval authority finds that the battery charging photovoltaic roof does not satisfy the conditions for certification, the application for certification of the savings should be rejected.

(6) It is appropriate to approve the testing methodology for determining the CO2 savings from battery charging photovoltaic roofs.

(7) In order to determine the CO2 savings from a battery charging photovoltaic roof it is necessary to define the baseline vehicle against which the efficiency of the vehicle equipped with the innovative technology should be compared as provided for in Articles 5 and 8 of Implementing Regulation (EU) No 725/2011. The Commission finds that the baseline vehicle should be a variant that in all aspects is identical to the eco-innovation vehicle with the exception of the photovoltaic roof and, where applicable, without the additional battery and other appliances needed specifically for the conversion of the solar energy into electricity and its storage.

(8) In accordance with Article 2(2)(b) of Implementing Regulation (EU) No 725/2011 it is to be demonstrated that the battery-charging photovoltaic roof is intrinsic to the efficient operation of the vehicle. This means that the energy generated by the photovoltaic roof should not for example be solely devoted to a comfort-enhancing appliance.

(9) In order to facilitate a wider deployment of battery-charging photovoltaic roofs in new vehicles, a manufacturer should also have the possibility to apply for the certification of the CO2 savings from several photovoltaic roof systems by a single certification application. It is however appropriate to ensure that where this possibility is used a mechanism is applied that incentivises the deployment of only those photovoltaic roofs systems that offer the highest efficiency.

(10) For the purposes of determining the general eco-innovation code to be used in the relevant type approval documents in accordance with Annexes I, VIII and IX to Directive 2007/46/EC of the European Parliament and of the Council, the individual code to be used for the innovative technology should be specified,
HAS ADOPTED THIS DECISION:

Approval
Article 1 
The battery-charging photovoltaic roof as described in the application by a2solar Advanced and Automotive Solar Systems GmbH is approved as an innovative technology within the meaning of Article 12 of Regulation (EC) No 443/2009.
Application for certification of CO2 savings
Article 2 

1. The manufacturer may apply for certification of the CO2 savings from a battery charging photovoltaic roof system intended for use in conventional combustion-engine-powered M1 vehicles which comprises all of the following elements:
(a) a photovoltaic roof;
(b) an appliance needed for the conversion of the solar energy into electricity and its storage;
(c) a dedicated storage capacity.
2. The total mass of those components shall be verified and confirmed in a report from an independent and certified body.
Certification of CO2 savings
Article 3 

1. The reduction in CO2 emissions from the use of battery charging photovoltaic roof systems referred to in Article 2(1) shall be determined using the methodology set out in the Annex.
2. Where a manufacturer applies for the certification of the CO2 savings from more than one battery charging photovoltaic roof system in relation to one vehicle version, the type approval authority shall determine which of the roofs tested delivers the lowest CO2 savings, and record the lowest value in the relevant type approval documentation. That value shall be indicated in the certificate of conformity in accordance with Article 11(2) of Implementing Regulation (EU) No 725/2011.
Eco-innovation code
Article 4 
The eco-innovation code No 21 shall be entered into the type approval documentation where reference is made to this Decision in accordance with Article 11(1) of Implementing Regulation (EU) No 725/2011.
Entry into force
Article 5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Done at Brussels, 3 November 2016.
For the Commission
The President
Jean-Claude JUNCKER
ANNEX
METHODOLOGY TO DETERMINE THE CO2 SAVINGS OF BATTERY CHARGING PHOTOVOLTAIC ROOFS
1. INTRODUCTION 

In order to determine the CO2 emission reductions that can be attributed to a battery charging photovoltaic (PV) roof for use in an M1 vehicle, it is necessary to establish the following:


((1)) the testing conditions
((2)) the test equipment;
((3)) the determination of the peak power output;
((4)) the calculation of the CO2 savings;
((5)) the calculation of the statistical margin of the CO2 savings.

2. SYMBOLS, PARAMETERS AND UNITS 
Latin symbols 

CCO2CO2 savings [g CO2/km]CO2Carbon dioxideCFConversion factor (l/100 km) — (g CO2/km) [gCO2/l] as defined in Table 3MMean annual mileage [km/year] as defined in Table 4mPP–Measured average solar PV roof peak power output [W]nNumber of measurements of the solar PV roof peak power output, which is at least 5SCCSolar correction coefficient [-] as defined in Table 1sCCO2Statistical margin of the total CO2 savings [g CO2/km]SIRYearly European mean solar irradiation [W/m2], which is 120 W/m2SIR_STCGlobal irradiation at Standard Test Conditions (STC) [W/m2], which is 1 000 W/m2smPP–Standard deviation of the arithmetic mean of the solar PV roof peak power output [W]UFIRUsage factor (shading effect), which is 0,51VPeConsumption of effective power [l/kWh] as defined in Table 2Sensitivity of calculated CO2 savings related to the average solar PV roof peak power output
Greek symbols 

ΔCO2mCO2 correction coefficient due to the extra mass of the solar system [g CO2/km] as defined in Table 5ΔmExtra mass due to the installation of the solar system [kg]ηAAlternator efficiency [%], which is 67 %ηSSSolar system efficiency [%], which is 76 %ΦLengthwise inclination of the solar panel [°]
Subscripts 

Index (i) refers to measurement of the PV roof peak power output

3. MEASUREMENTS AND DETERMINATION OF THE PEAK POWER OUTPUT 

The measured average peak power output mPP– of the PV roof is to be determined experimentally for each vehicle variant. Initial stabilisation of the tested device is to be done in accordance with the methodology specified in the international standard IEC 61215-2:2016. The measurements of the peak power output shall be performed at standard test conditions as defined in the international standard IEC/TS 61836:2007.

A dismantled complete PV roof is to be used. The four corner points of the panel are to touch the measurement plane.

The measurements of the peak power output shall be performed at least five times and the arithmetic mean (mPP–) has to be calculated.

4. CALCULATION OF THE CO2 SAVINGS 

The CO2 savings of the PV roof are to be calculated by Formula 1 
Formula 1 
CCO2=SIR×UFIR×ηSS×mPP–SIR_STC×SCC×VPeηA×CFM×cosΦ−ΔCO2m
Where:

CCO2CO2 savings [g CO2/km]SIRYearly European mean solar irradiation [W/m2], which is 120 W/m2UFIRUsage factor (shading effect) [-], which is 0,51ηSSEfficiency of the photovoltaic system [%], which is 76 %mPP–Measured average PV roof peak power output [W]SIR_STCGlobal irradiation at Standard Test Conditions (STC) [W/m2], which is 1 000 W/m2SCCSolar correction coefficient [-] as defined in Table 1. Total available storage capacity of the battery system or the SCC value is to be supplied by the vehicle manufacturer.

Table 1Solar correction coefficientTotal available storage capacity of (12 V) battery system/average PV roof peak power output [Ah/W] 0,10 0,20 0,30 0,40 0,50 0,60 > 0,666
Solar correction coefficient (SCC) 0,481 0,656 0,784 0,873 0,934 0,977 1
VPeConsumption of effective power [l/kWh] as defined in Table 2

Table 2Consumption of effective powerType of engine Consumption of effective power (VPe)[l/kWh]
Petrol 0,264
Petrol Turbo 0,280
Diesel 0,220ηAEfficiency of the alternator [%], which is 67 %;CFConversion factor (l/100km) — (g CO2/km) [gCO2/l] as defined in Table 3

Table 3Fuel conversion factorType of fuel Conversion factor (l/100 km) — (g CO2/km) (CF)[gCO2/l]
Petrol 2 330
Diesel 2 640MMean annual mileage [km/year] as defined in Table 4

Table 4Mean annual mileage for M1 vehiclesType of fuel Mean annual mileage (M) [km/year]
Petrol 12 700
Diesel 17 000ΦLengthwise inclination of the solar panel [°]. This value is to be supplied by the vehicle manufacturerΔCO2mCO2 correction coefficient due to the extra mass of the solar roof and, where applicable, the additional battery and other appliances needed specifically for the conversion of the solar energy into electricity and its storage [g CO2/km] as defined in Table 5.

Table 5CO2 correction coefficient due to the extra massType pf fuel CO2 correction coefficient due to the extra mass (ΔCO2m)[g CO2/km]
Petrol 0,0277 · Δm
Diesel 0,0383 · Δm

In Table 5 Δm is the extra mass due to the installation of the photovoltaic system, composed by the PV roof and, where applicable, the additional battery and other appliances needed specifically for the conversion of the solar energy into electricity and its storage.

In particular, Δm is the positive difference between the mass of the photovoltaic system mass and the mass of a standard steel roof. The mass of a standard steel roof is assumed equal to 12 kg. In case the weight of the solar system is lower than 12 kg, no correction for the change in mass has to be made.

5. CALCULATION OF THE STATISTICAL MARGIN 

The standard deviation of the arithmetic mean of the peak power output is to be calculated by Formula 2.
Formula 2 
smPp–=∑i=1nmPPi−mPP–2nn−1
Where:

smPp–Standard deviation of the arithmetic mean of the peak power output [W]mPPiMeasurement value of the peak power output [W]mPP–Arithmetic mean of the peak power output [W]nNumber of measurements of the peak power output, which is at least 5

The standard deviation of arithmetic mean of the PV roof peak power output leads to a statistical margin in the CO2 savings sCCO2. This value is to be calculated in accordance with Formula 3.
Formula 3 

6. STATISTICAL SIGNIFICANCE 

It has to be demonstrated for each type, variant and version of a vehicle fitted with the battery charging PV roof that the minimum threshold of 1 gCO2/km is exceeded in a statistically significant way, as specified in Article 9(1) of Implementing Regulation (EU) No 725/2011. As a consequence, Formula 4 is to be used.
Formula 4 
MT≤CCO2−sCCO2
Where:

MTMinimum threshold [g CO2/km], which is 1 g CO2/kmsCCO2Statistical margin of the total CO2 savings [g CO2/km]

Where the CO2 emission savings, as a result of the calculation using Formula 4, are below the threshold specified in Article 9(1) of Implementing Regulation (EU) No 725/2011, the second subparagraph of Article 11(2) of that Regulation shall apply.
