
COMMISSION DECISION of 13 June 2008 on the harmonisation of the 2 500-2 690 MHz frequency band for terrestrial systems capable of providing electronic communications services in the Community (notified under document number C(2008) 2625) (Text with EEA relevance) (2008/477/EC) 

THE COMMISSION OF THE EUROPEAN COMMUNITIES,
Having regard to the Treaty establishing the European Community,
Having regard to Decision No 676/2002/EC of the European Parliament and of the Council of 7 March 2002 on a regulatory framework for radio spectrum policy in the European Community (Radio Spectrum Decision), and in particular Article 4(3) thereof,
Whereas:

(1) The Commission has supported a more flexible use of spectrum in its Communication on ‘Rapid access to spectrum for wireless electronic communications services through more flexibility’, which, inter alia, addresses the 2 500-2 690 MHz band. Technological neutrality and service neutrality have been underlined by Member States in the Radio Spectrum Policy Group (RSPG) opinion on Wireless Access Policy for Electronic Communications Services (WAPECS) of 23 November 2005 as important policy goals to achieve a more flexible use of spectrum. Moreover, according to this opinion, these policy goals should not be introduced abruptly, but in a gradual manner to avoid disruption of the market.

(2) The designation of the 2 500-2 690 MHz band for systems capable of providing electronic communications services is an important element addressing the convergence of the mobile, fixed and broadcasting sectors and reflecting technical innovation. The services provided in this frequency band should mainly target end-user access to broadband communications.

(3) It is expected that the wireless broadband electronic communications services for which the 2 500-2 690 MHz band is to be designated will to a large extent be pan-European in the sense that users of such electronic communications services in one Member State could also gain access to equivalent services in any other Member State.

(4) Pursuant to Article 4(2) of Decision No 676/2002/EC, on 5 July 2006 the Commission gave a mandate to the European Conference of Postal and Telecommunications Administrations (hereinafter the CEPT) to develop least restrictive technical conditions for frequency bands addressed in the context of WAPECS.

(5) In response to that mandate, the CEPT has issued a report (CEPT Report 19) on least restrictive technical conditions for frequency bands addressed in the context of WAPECS. This report contains technical conditions and guidance for the application of least restrictive conditions to base stations and terminal stations operating in the 2 500-2 690 MHz band, which are appropriate to manage the risk of harmful interference within as well as outside of national territories, without requiring that any type of particular technology is used, based on optimised parameters for the most likely use of the band.

(6) In accordance with CEPT Report 19 this Decision introduces the concept of Block Edge Masks (BEM), which are technical parameters that apply to the entire block of spectrum of a specific user, irrespective of the number of channels occupied by the user's chosen technology. These masks are intended to form part of the authorisation conditions for spectrum usage. They cover both emissions within the block of spectrum (i.e. in-block power) as well as emissions outside the block (i.e. out-of-block emission). They are regulatory requirements aimed at managing the risk of harmful interference between neighbouring networks and are without prejudice to limits set in equipment standards under Directive 1999/5/EC of the European Parliament and of the Council of 9 March 1999 on radio equipment and telecommunications terminal equipment and the mutual recognition of their conformity (the R&TTE Directive).

(7) The designation and making available of the 2 500-2 690 MHz band in accordance with the results of the mandate to CEPT recognises the fact that there are other existing applications. Appropriate sharing criteria for coexistence between some systems have been developed in the Electronic Communications Committee's ECC Report 45. For other systems and services appropriate sharing criteria for coexistence may be based on national considerations.

(8) To achieve compatibility a separation of 5 MHz is needed between the edges of spectrum blocks used for unrestricted TDD (time division duplex) and FDD operation (frequency division duplex) or in the case of two unsynchronised networks operating in TDD mode. Such separation should be achieved by either leaving these 5 MHz blocks unused as guard blocks; or through usage that complies with parameters of the restricted BEM when adjacent to an FDD (uplink) or between two TDD blocks; or through usage that complies with parameters of either restricted or unrestricted BEMs when adjacent to an FDD (downlink) block. Any usage of a 5 MHz guard block is subject to an increased risk of interference.

(9) The results of the mandate to the CEPT should be made applicable in the Community and implemented by the Member States without delay given the increasing requirements identified in studies at European and global levels for terrestrial electronic communications services providing broadband communications.

(10) Harmonisation under this Decision should not exclude the possibility for a Member State to apply, where justified, transitional periods that could include radio spectrum sharing arrangements, pursuant to Article 4(5) of the Radio Spectrum Decision.

(11) In order to ensure effective use of the 2 500-2 690 MHz band also in the longer term, administrations should continue with studies that may increase efficiency and innovative use. Such studies should be taken into account when considering a review of this Decision.

(12) The measures provided for in this Decision are in accordance with the opinion of the Radio Spectrum Committee,
HAS ADOPTED THIS DECISION:

Article 1 
This Decision aims at harmonising the conditions for the availability and efficient use of the 2 500-2 690 MHz band for terrestrial systems capable of providing electronic communications services in the Community.
Article 2 

1. Member States shall designate and make available, on a non-exclusive basis, the 2 500-2 690 MHz frequency band for terrestrial systems capable of providing electronic communications services, in compliance with the parameters set out in the Annex to this Decision.
2. Member States implementing time division duplex or ‘downlink-only’ use outside the 2 570–2 620 MHz sub-band on the date when this Decision takes effect may request a transitional period for the implementation of this Decision, pursuant to Article 4(5) of Decision No 676/2002/EC.
3. Member States shall ensure that systems referred to in paragraph 1 give appropriate protection to systems in adjacent bands.
Article 3 
Member States shall report to the Commission on the implementation of this Decision by 30 April 2021.
Article 4 
This Decision is addressed to the Member States.
ANNEX
PARAMETERS REFERRED TO IN ARTICLE 2
A. DEFINITIONS 

Active antenna systems (AAS) means a base station and an antenna system where the amplitude and/or phase between antenna elements is continually adjusted resulting in an antenna pattern that varies in response to short term changes in the radio environment. This excludes long-term beam shaping such as fixed electrical down tilt. In AAS base stations the antenna system is integrated as part of the base station system or product.

Non-active antenna systems (non-AAS) means a base station and an antenna system that provides one or more antenna connectors, which are connected to one or more separately designed passive antenna elements to radiate radio waves. The amplitude and phase of the signals to the antenna elements is not continually adjusted in response to short term changes in the radio environment.

Synchronised operation means operation of two or more different time division duplex (TDD) networks, where simultaneous uplink (UL) and downlink (DL) transmissions do not occur, that is at any given moment in time either all networks transmit in downlink or all networks transmit in uplink. This requires the alignment of all DL and UL transmissions for all TDD networks involved as well as synchronising the beginning of the frame across all networks.

Unsynchronised operation means operation of two or more different TDD networks, where at any given moment in time at least one network transmits in DL while at least one network transmits in UL. This might happen if the TDD networks either do not align all DL and UL transmissions or do not synchronise at the beginning of the frame.

Semi-synchronised operation means operation of two or more different TDD networks, where part of the frame is consistent with synchronised operation, while the remaining portion of the frame is consistent with unsynchronised operation. This requires the adoption of a frame structure for all TDD networks involved, including slots where the UL/DL direction is not specified, as well as synchronising the beginning of the frame across all networks.

Equivalent isotropically radiated power (EIRP) means the product of the power supplied to the antenna and the antenna gain in a given direction relative to an isotropic antenna (absolute or isotropic gain).

Total radiated power (TRP) means a measure of how much power a composite antenna radiates. It equals the total conducted power input into the antenna array system less any losses in the antenna array system. TRP means the integral of the power transmitted in different directions over the entire radiation sphere as shown in the formula:



where P(θ,φ) is the power radiated by an antenna array system in direction (θ,φ) given by the formula:



where PTx denotes the conducted power (measured in Watts), which is input to the array system, and g(θ,φ) denotes the array system’s directional gain along the (θ, φ) direction.

B. GENERAL PARAMETERS 
 (1) The assigned block size shall be in multiples of 5,0 MHz;
 (2) Within the 2 500–2 690 MHz frequency band, the duplex spacing for Frequency Division Duplex operation shall be 120 MHz with terminal station transmission (uplink) located in the lower part of the band starting at 2 500 MHz and ending at 2 570 MHz, and base station transmission (downlink) located in the upper part of the band starting at 2 620 MHz and ending at 2 690 MHz;
 (3) The 2 570–2 620 MHz frequency sub-band shall be used for Time Division Duplex or for base station transmission (‘downlink-only’). Any guard band required to ensure compatibility of frequency use at either the 2 570 MHz or the 2 620 MHz boundary shall be decided on a national basis and taken within the 2 570–2 620 MHz frequency sub-band.

C. TECHNICAL CONDITIONS FOR BASE STATIONS – BLOCK EDGE MASK 

The following technical parameters for base stations, called Block Edge Mask (BEM), are an essential component of conditions necessary to ensure co-existence between neighbouring networks, in the absence of bilateral or multilateral agreements between operators of such neighbouring networks. Less stringent technical parameters, if agreed among all affected operators of such networks, may also be used provided that these operators continue to comply with the technical conditions applicable for the protection of other services, applications or networks and with obligations resulting from cross-border coordination.

The BEM consists of several elements given in Table 1. The in-block power limit is applied to a block assigned to an operator. The baseline power limit, designed to protect the spectrum of other operators within the 2,6 GHz frequency band, and the transitional region power limit, enabling filter roll-off from the in-block to the baseline power limit, represent out-of-block power elements.

Power limits are provided separately for non-AAS and AAS. For non-AAS, the power limits apply to the mean EIRP. For AAS, the power limits apply to the mean TRP. The mean EIRP or mean TRP are measured by averaging over a time interval and over a measurement frequency bandwidth. In the time domain, the mean EIRP or mean TRP is averaged over the active portions of signal bursts and corresponds to a single power control setting. In the frequency domain, the mean EIRP or mean TRP is determined over the measurement frequency bandwidth as given in Tables 2–8 below. In general, and unless stated otherwise, the BEM power limits correspond to the aggregate power radiated by the relevant device including all transmit antennas, except in the case of baseline and transition requirements for non-AAS base stations, which are specified per antenna.

The additional baseline limit for FDD AAS base stations is an out-of-block power limit which may be applied in order to reduce the necessary coordination zone with radio astronomy service (RAS) stations and protect the RAS in the adjacent frequency band 2 690–2 700 MHz in specific geographical areas.

Measures applicable at national level, such as pfd limits, in order to protect the various types of radars operating above 2 700 MHz would remain applicable, noting that it may be more complex for operators to comply with the pfd limit since AAS systems cannot be fitted with additional external filters.

Equipment operating in this band may also make use of EIRP or TRP limits other than those set out below, provided that appropriate mitigation techniques are applied which comply with Directive 2014/53/EU of the European Parliament and of the Council and which offer at least an equivalent level of protection to that provided by the essential requirements of that Directive.


Explanatory note to the Figure 

The applicable BEM limit is always the one immediately above the respective number (i.e. 1 to 5).



Table 1Definition of BEM elementsBEM Element Definition
In-block Refers to a block for which the BEM is derived.
Baseline Spectrum within 2 500–2 690 MHz used for WBB ECS, with the exception of the block assigned to the operator and the corresponding transitional regions.
Transitional region Spectrum within 0 to 5,0 MHz below and 0 to 5,0 MHz above the block assigned to the operator. Transitional regions do not apply to TDD blocks assigned to other operators, unless networks are synchronised. The transitional regions do not apply below 2 500 MHz or above 2 690 MHz.
Additional baseline Spectrum between 2 690–2 700 MHz.

Coexistence of geographically adjacent networks using also adjacent frequency blocks within the 2,6 GHz frequency band may need specific measures to mitigate radio interference. Typically, a frequency separation of at least 5 MHz should be applied in the case of two adjacent unsynchronised TDD networks or a TDD network adjacent to an FDD network. Such a separation should be implemented by either leaving a 5 MHz block unused as a guard block, or through usage of such a 5 MHz block under more restrictive BEM parameters (restricted spectrum block). Any usage of a 5 MHz guard block would be subject to an increased risk of interference.

To achieve coexistence of adjacent FDD and TDD networks, the restricted spectrum block 2 570–2 575 MHz (except in TDD uplink-only operation in this block) should be introduced for all adjacent configurations of (i) FDD-AAS to TDD-non-AAS; and (ii) FDD-non-AAS to TDD-AAS. Furthermore, the frequency block 2 615–2 620 MHz, which is immediately adjacent to the FDD downlink, may suffer an increased risk of interference due to the emissions from the FDD downlink.

The BEM for a spectrum block, other than a restricted spectrum block, is built up by combining Tables 2, 3 and 4 in such a way that the limit for each frequency is given by the higher value out of the baseline and the in-block power limits.

The BEM for a restricted spectrum block is built up by combining Tables 3 and 5 in such a way that the limit for each frequency is given by the higher value out of the baseline and the in-block power limits.

Furthermore, for base stations with restrictions on antenna placement, i.e. where base station antennas are placed indoors or where the antenna height is below a certain height, a Member State may use alternative BEM power limits on a national basis. In these cases the BEM for a restricted spectrum block for non-AAS may be in line with Table 6, provided that at geographical borders to other Member States, Table 3 applies and that Table 5 remains valid nationwide. For AAS with restrictions on antenna placement, alternative national measures compared to Table 3 or Table 5 may be required on a case-by-case basis.



Table 2In-block power limit for non-AAS and AAS base stationsBEM element Non-AAS EIRP limit AAS TRP limit
In-block Not obligatory.In case an upper limit is set by a Member State, a value between 61dBm/5MHz and 68 dBm/5 MHz per antenna may be applied. Not obligatory.In case an upper limit is set by a Member State, a value between 53dBm/5MHz and 60 dBm/5 MHz per cell may be applied.




Table 3Baseline power limit for non-AAS and AAS base stationsBEM element Frequency range Non-AAS maximum mean EIRP limit per antenna AAS maximum mean TRP limit per cell
Baseline FDD downlink;TDD blocks synchronised with the TDD block under consideration;TDD blocks used for downlink-only;The range 2 615–2 620 MHz. + 4 dBm/MHz + 5 dBm/MHz
Frequencies in the 2 500–2 690 MHz frequency band not covered by the definition in the row above. – 45 dBm/MHz – 52 dBm/MHz



Explanatory note to Table 3 

Both the EIRP and TRP limits are integrated over a bandwidth of 1 MHz.



Table 4Transitional region power limit for non-AAS and AAS base stationsBEM element Frequency range Non-AAS maximum mean EIRP limit per antenna AAS maximum mean TRP limit per cell
Transitional region -5,0 to 0 MHz offset from lower block edge, or 0 to 5,0 MHz offset from upper block edge + 16 dBm/5 MHz + 16 dBm/5 MHz





Table 5In-block power limit for non-AAS and AAS base stations for restricted blockBEM element Frequency range Non-AAS EIRP limit per antenna AAS TRP limit per cell
In-block Restricted Block spectrum + 25 dBm/5 MHz + 22 dBm/5 MHz





Table 6Power limits for restricted block for non-AAS base stations with additional restrictions on antenna placementBEM element Frequency range Maximum mean EIRP limit
Baseline Lower band edge of 2 500 MHz to -5,0 MHz offset from lower block edge, or 5,0 MHz offset from upper block edge to upper band edge of 2 690 MHz – 22 dBm/MHz
Transitional region -5,0 to 0 MHz offset from lower block edge, or 0 to 5,0 MHz offset from upper block edge – 6 dBm/5 MHz



Table 7Additional baseline power limit for FDD AAS base stations with regard to Radio Astronomy ServiceBEM element Frequency range Case TRP power limit per cell
Additional baseline 2 690–2 700 MHz A + 3 dBm/10 MHz
B Not applicable
Case A:This limit yields a reduced coordination zone with respect to RAS stations.
Case B:For situations where additional baseline is not considered necessary by the concerned Member State (e.g. where there is no nearby RAS station or situation where no coordination zone is required).
Explanatory note to Table 7 

These power limits may be applied to reduce the size of the coordination zone with RAS in specific geographical areas. Depending on the size of the necessary coordination zone to protect RAS station(s), cross border coordination may also be necessary. Additional measures may be needed on a national basis in order to protect RAS stations.

D. TECHNICAL CONDITIONS FOR TERMINAL STATIONS 



Table 8In-block power limits for terminal stationsBEM element Maximum mean EIRP limit (including Automatic Transmitter Power Control range) Maximum mean TRP limit (including Automatic Transmitter Power Control range)
In-block + 35 dBm/5 MHz + 31 dBm/5 MHz
Note:EIRP should be used for fixed or installed terminal stations and the TRP should be used for the mobile or nomadic terminal stations.
