COMMISSION DECISION of 23 December 2005 concerning the technical specification for interoperability relating to the subsystem ‘rolling stock — noise’ of the trans-European conventional rail system (notified under document number C(2005) 5666) (Text with EEA relevance) (2006/66/EC) (repealed) 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Article 1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Article 2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Article 3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Article 4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Article 5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Article 6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ANNEX
Technical specification for interoperability relating to the subsystem ‘rolling stock — noise’ of the trans-European conventional railTRANS-EUROPEAN CONVENTIONAL RAIL SYSTEM 
 Technical specification for interoperability Subsystem: Conventional rolling stock 
Scope: Noise 
Aspect: Noise emitted by freight wagons, locomotives, multiple units and coaches 
 1. INTRODUCTION 
 1.1. Technical scope 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 1.2. Geographical scope 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 1.3. Content of this TSI 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 2. DEFINITION OF SUBSYSTEM/SCOPE 
 2.1. Definition of subsystem 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 2.2. Interfaces of subsystem 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 3. ESSENTIAL REQUIREMENTS 
 3.1. General 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 3.2. Essential requirements 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 3.3. General essential requirements 
 3.3.1. Environmental protection 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 3.4. Aspects relating to essential requirements specific for the rolling stock subsystem 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4. CHARACTERISATION OF THE SUBSYSTEM 
 4.1. Introduction 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.2. Functional and technical specifications of the subsystem 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.2.1. Noise emitted by freight wagons 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.2.1.1. Limits for pass-by noise 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.2.1.2. Limits for stationary noise 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.2.2. Noise emitted by locomotives, multiple units and coaches 
 4.2.2.1. Introduction 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.2.2.2. Limits for stationary noise 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.2.2.3. Limits for starting noise 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.2.2.4. Limits for pass-by noise 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.2.3. Interior noise of locomotives, multiple units and driving trailers 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.3. Functional and technical specifications of the interfaces 
 4.3.1. Conventional rail rolling stock subsystem 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.3.2. The locomotives, multiple units and coaches subsystems 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.4. Operating rules 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.5. Maintenance rules 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.6. Professional qualifications 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.7. Health and safety conditions 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.8. Infrastructure and rolling stock registers 
 4.8.1. Infrastructure register 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.8.2. European register of authorised types of vehicles 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5. INTEROPERABILITY CONSTITUENTS 
 5.1. Definition 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6. ASSESSMENT OF CONFORMITY AND/OR SUITABILITY FOR USE OF THE CONSTITUENTS AND VERIFICATIONS OF THE SUBSYSTEM 
 6.1. Interoperability constituents 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.2. Subsystem rolling stock regarding noise emitted by rolling stock 
 6.2.1. Assessment procedures 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.2.2. Modules 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.2.3. Subsystem rolling stock aspect noise 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7. IMPLEMENTATION 
 7.1. General 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.2. TSI Revision 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.3. A two step approach 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.4. Retrofitting programme for noise reduction 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.5. Application of this TSI to new rolling stock 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.5.1. Transitional period for external noise 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.5.2. Starting noise 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.5.3. Noise within the driver's cab 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.5.4. Exceptions for national, bilateral, multilateral or multinational agreements 
 7.5.4.1. Existing agreements 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.5.4.2. Future agreements or modification of existing agreements 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.6. Application of this TSI to existing rolling stock 
 7.6.1. Renewal or upgrading of existing freight wagons 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.6.2. Renewal or upgrading of locomotives, multiple units and coaches 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.7. Specific cases 
 7.7.1. Introduction 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.7.2. List of specific cases 
 7.7.2.1. Limit for stationary noise, ‘strictly for use on the UK and Ireland networks only’ 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.7.2.2. Finland 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.7.2.3. Limits for starting noise, ‘strictly for use on the UK and Ireland networks only’ 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.7.2.4. Limits for pass-by noise for freight wagons, in Finland, Norway, Estonia, Latvia and Lithuania 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.7.2.5. Specific case for Greece 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.7.2.6. Specific case for Estonia, Latvia and Lithuania 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

ANNEX A
MEASURING CONDITIONS
A.1. DEVIATIONS FROM PREN ISO 3095:2001 
 A.1.1. Stationary noise 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 A.1.2. Starting noise 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 A.1.3. Pass-by noise 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 A.1.4. Reference track for pass-by noise 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 Figure F1: Rail roughness limit spectrum of the reference track 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 Figure F2: Vertical and lateral decay rate lower limit spectrum of the reference track 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

A.2. CHARACTERISATION OF THE DYNAMIC PERFORMANCES OF THE REFERENCE TRACKS 
 A.2.1. Measurement procedure 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 Figure F3: Captor location on the rail cross section 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 Figure F4: Track decay rates — location of the excitation points 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 A.2.2. Measurement system 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 A.2.3. Data processing 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 A.2.4. Test report 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

ANNEX B
MODULES FOR THE EC VERIFICATION OF SUBSYSTEMS –ASPECT NOISE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

B.1. Module SB: Type examination 
 1. This module describes the EC verification procedure whereby a notified body checks and certifies at the request of an contracting entity or its authorised representative established within the Community, that a type of a rolling stock subsystem aspect noise, representative of the production envisaged, 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 2. The contracting entity must lodge an application for EC verification (through type examination) of the subsystem with a notified body of his choice. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 3. The applicant must place at the disposal of the notified body a specimen of the subsystem, representative of the production envisaged and hereinafter called ‘type’. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5. Where the type meets the provisions of the TSI, the notified body shall issue a type-examination certificate to the applicant. The certificate shall contain the name and address of the contracting entity and the manufacturer(s) indicated in the technical documentation, conclusions of the examination, conditions for its validity and the necessary data for identification of the approved type. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

B.2. Module SD: Production quality management system 
 1. This module describes the EC verification procedure whereby a notified body checks and certifies, at the request of an contracting entity or its authorised representative established within the Community, that a rolling stock subsystem aspect noise, for which already a type-examination certificate has been issued by a notified body: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 2. The notified body carries out the procedure, under the condition, that: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 3. For the subsystem that is subject of the EC verification procedure, the contracting entity, or the main contractors when employed, shall operate an approved quality management system for manufacture and final product inspection and testing as specified in point 5 and which shall be subject to surveillance as specified in point 6. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.2. The application must enable the design, manufacture, assembly, installation, maintenance and operation of the subsystem to be understood, and shall enable conformity with the type as described in the type-examination certificate and the requirements of the TSI to be assessed. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.3. The notified body shall first examine the application concerning the validity of the type examination and the type examination certificate. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5.1. The contracting entity, if involved, and the main contractors, when employed, must lodge an application for assessment of their quality management systems with a notified body of their choice. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5.2. For the contracting entity or the main contractor responsible for the whole subsystem project, the quality management systems shall ensure overall compliance of the subsystem with the type as described in the type-examination certificate and overall compliance of the subsystem with the requirements of the TSI. For other main contractor, their quality management system(s) has (have) to ensure compliance of their relevant contribution to the subsystem with the type as described in the type-examination certificate and with the requirements of the TSI. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5.3. The notified body chosen by the contracting entity must examine, if all stages of the subsystem as mentioned under point 5.2 are sufficiently and properly covered by the approval and surveillance of the quality management system(s) of the applicant(s). 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5.4. The notified body referenced to in point 5.1 must assess the quality management system to determine whether it satisfies the requirements referenced in point 5.2. It presumes compliance with these requirements if the applicant implements a quality system for production, final product inspection and testing in respect of the Standard EN ISO 9001 — 2000, which takes into consideration the specificity of the subsystem for which it is implemented. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5.5. The contracting entity, if involved, and the main contractors shall undertake to fulfil the obligations arising out of the quality management system as approved and to uphold it so that it remains adequate and efficient. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.2. The contracting entity, if involved, and the main contractors must send to the notified body referenced in point 5.1 (or have sent) all the documents needed for that purpose including the implementation plans and technical records concerning the subsystem (as far as relevant for the specific contribution of the applicants to the subsystem), in particular: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.3. The notified body must periodically carry out audits to make sure that the contracting entity, if involved, and the main contractors, maintain and apply the quality management system and must provide an audit report to them. When those operate a certified quality management system, the notified body shall take this into account in the surveillance. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.5. The notified body chosen by the contracting entity and responsible for the EC verification, if not carrying out the surveillance of all the quality management system(s) concerned, must co ordinate the surveillance activities of any other notified body responsible for that task, in order: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 8. The contracting entity, if involved, and the main contractors must, for a period of 10 years after the last subsystem has been manufactured, keep at the disposal of the national authorities: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 9. Where the subsystem meets the requirements of the TSI, the notified body must then, based on the type examination and the approval and surveillance of the quality management system(s), draw up the certificate of conformity intended for the contracting entity, who shall in turn draw up the EC declaration of verification intended for the supervisory authority in the Member State within which the subsystem is located and/or operates. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 10. The notified body chosen by the contracting entity shall be responsible for compiling the technical file that has to accompany the EC declaration of verification. The technical file shall include at least the information indicated in the Article 18(3) of the Directive, and in particular as follows: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 11. Each notified body must communicate to the other notified bodies the relevant information concerning the quality management system approvals issued, withdrawn or refused. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 12. The records accompanying the certificate of conformity must be lodged with the contracting entity. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

B.3 Module SF: Product verification 
 1. This module describes the EC verification procedure whereby a notified body checks and certifies at the request of an contracting entity or its authorised representative established within the Community, that a rolling stock subsystem aspect noise, for which a type-examination certificate has already been issued by a notified body: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 2. The contracting entity must lodge an application for EC verification (through product verification) of the subsystem with a notified body of his choice. The application shall include: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 3. Within that part of the procedure the contracting entity checks and attests that the subsystem concerned is in conformity with the type as described in the type examination certificate and satisfies the requirements of the TSI that apply to it. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5. The application must enable the design, manufacture, installation, maintenance and operation of the subsystem to be understood, and shall enable conformity with the type as described in the type-examination certificate and the requirements of the TSI to be assessed. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6. The notified body shall first examine the application concerning the validity of the type examination and the type examination certificate. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7.2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 8. The notified body may agree with the contracting entity (and the main contractors) the locations where the tests will be carried out and may agree that final testing of the subsystem and, whenever required in the TSI, tests or validation under full operating conditions, are carried out by the contracting entity under direct supervision and attendance of the notified body. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 9. Where the subsystem meets the requirements of the TSI, the notified body must, draw up the certificate of conformity intended for the contracting entity, which in turn draws up the EC declaration of verification intended for the supervisory authority in the Member State where the subsystem is located and/or operates. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 10. The notified body shall be responsible for compiling the technical file that has to accompany the EC declaration of verification. The technical file shall include at least the information indicated in Article 18(3) of the Directive, and in particular as follows: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 11. The records accompanying the certificate of conformity must be lodged with the contracting entity. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

B.4 Module SH2: Full quality management system with design examination 
 1. This module describes the EC verification procedure whereby a notified body checks and certifies, at the request of an contracting entity or its authorised representative established within the Community, that a rolling stock subsystem Aspect Noise: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 2. The notified body shall carry out the procedure, including a design examination of the subsystem, under the condition, that the contracting entity and the main contractors involved are satisfying the obligations of point 3. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 3. For the subsystem that is subject of the EC verification procedure, the contracting entity or the main contractors, when employed, shall operate an approved quality management system for design, manufacture and final product inspection and testing as specified in point 5 and which shall be subject to surveillance as specified in point 6. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.2. The application must enable the design, manufacture, assembly, installation, maintenance and operation of the subsystem to be understood, and shall enable conformity with the requirements of the TSI to be assessed. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 4.4. The notified body must examine the application concerning the design examination and assess the results of the tests. Where the design meets the provisions of the Directive and of the TSI that apply to it must issue a design examination report to the applicant. The report shall contain the conclusions of the design examination, conditions for its validity, the necessary data for identification of the design examined and, if relevant, a description of the subsystem's functioning. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5.1. The contracting entity, if involved, and the main contractors, when employed, must lodge an application for assessment of their quality management systems with a notified body of their choice. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5.2. For the contracting entity or the main contractor responsible for the whole subsystem project, the quality management system shall ensure overall compliance of the subsystem with the requirements of the TSI. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5.3. The notified body chosen by the contracting entity must examine, if all stages of the subsystem as mentioned in point 5.2 are sufficiently and properly covered by the approval and surveillance of the quality management system(s) of the applicant(s). 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5.4. The notified body referenced in point 5.1 must assess the quality management system to determine whether it satisfies the requirements of point 5.2. It presumes compliance with these requirements if the applicant implements a quality system for design, production, final product inspection and testing in respect of the Standard EN/ISO 9001 — 2000, which takes into consideration the specificity of the subsystem for which it is implemented. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 5.5. The contracting entity, if involved, and the main contractors shall undertake to fulfil the obligations arising out of the quality management system as approved and to uphold it so that it remains adequate and efficient. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.2. The contracting entity, if involved, and the main contractors must send the notified body referenced in point 5.1 (or have sent) all the documents needed for that purpose and in particular the implementation plans and technical records concerning the subsystem (as far as relevant for the specific contribution of the applicant to the subsystem), including: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.3. The notified body must periodically carry out audits to make sure that the contracting entity, if involved, and the main contractors maintain and apply the quality management system and shall provide an audit report to them. When they operate a certified quality management system, the notified body shall take this into account in the surveillance. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 6.5. The notified body chosen by the contracting entity and responsible for the EC verification, if not carrying out the surveillance of all the quality management system(s) concerned as in point 5, must co ordinate the surveillance activities of any other notified bodies responsible for that task, in order: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 8. The contracting entity, if involved, and the main contractors must, for a period of 10 years after the last subsystem has been manufactured, keep at the disposal of the national authorities: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 9. Where the subsystem meets the requirements of the TSI, the notified body must then, based on the design examination and the approval and surveillance of the quality management system(s), draw up the certificate of conformity intended for the contracting entity, who shall in turn draw up the EC declaration of verification intended for the supervisory authority in the Member State within which the subsystem is located and/or operates. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 10. The notified body chosen by the contracting entity shall be responsible for compiling the technical file that has to accompany the EC declaration of verification. The technical file shall include at least the information indicated in Art 18(3) of the Directive, and in particular as follows: 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 11. Each notified body must communicate to the other notified bodies the relevant information concerning the quality management system approvals and the EC design examination reports, which it has issued, withdrawn or refused. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
 12. The records accompanying the certificate of conformity must be lodged with the contracting entity. 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .