1999 No. 2001
HEALTH AND SAFETY
The Pressure Equipment Regulations 1999 (revoked)
Made 15th July 1999
Laid before Parliament 19th July 1999
Coming into force
regulations 1, 2, 20 and 22 31st August 1999
remaining regulations 29th November 1999
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART I PRELIMINARY
Citation and commencement
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Interpretation
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART II APPLICATION
Pressure equipment and assemblies
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Excluded pressure equipment and assemblies
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Pressure equipment and assemblies placed on the market before 29th November 1999
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Exclusion until 30th May 2002 of pressure equipment and assemblies complying with provisions in force on 28th November 1999
6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART III GENERAL REQUIREMENTS
General duty relating to the placing on the market or putting into service of pressure equipment
7 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General duty relating to the placing on the market or putting into service of assemblies
8 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Requirement for pressure equipment or assemblies to comply with sound engineering practice
9 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General duty relating to the supply of pressure equipment and assemblies
10 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Exceptions to placing on the market or supply in respect of certain pressure equipment and assemblies
11 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Classification of pressure equipment
12 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Conformity assessment procedures for pressure equipment
13 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Conformity assessment procedure for assemblies
14 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Exclusion for pressure equipment and assemblies for use for experimentation
15 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CE marking
16 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
European approval for materials
17 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Notified bodies
18 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Recognised third-party organisations
19 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Notified bodies and recognised third-party organisations appointed by the Secretary of State
20 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fees
21 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
User inspectorates
22 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Conditions for pressure equipment and assemblies being taken to conform with the provisions of these Regulations
23 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART IV ENFORCEMENT
Application of Schedule 8
24 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Offences
25 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Penalties
26 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Defence of due diligence
27 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Liability of persons other than the principal offender
28 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Consequential amendments
29 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 1
EXCLUDED PRESSURE EQUIPMENT AND ASSEMBLIES
Regulation 4(1)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
11 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
14 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
21 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 2
(Annex I to the Pressure Equipment Directive)ESSENTIAL SAFETY REQUIREMENTS
Regulations 2(2), 7(5), 8(5), 14, 16(1), 19, 20(7)(a) PRELIMINARY OBSERVATIONS
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
GENERAL
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
DESIGN
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.7 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.8 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.9 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.10 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.11 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.12 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
MANUFACTURING
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
MATERIALS
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SPECIFIC PRESSURE EQUIPMENT REQUIREMENTS
In addition to the applicable requirements of sections 1 to 4, the following requirements apply to the pressure equipment covered by sections 5 and 6.

FIRED OR OTHERWISE HEATED PRESSURE EQUIPMENT WITH A RISK OF OVERHEATING AS REFERRED TO IN ARTICLE 3(1)
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PIPING AS REFERRED TO IN ARTICLE 3, SECTION 1.3
6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SPECIFIC QUANTITATIVE REQUIREMENTS FOR CERTAIN PRESSURE EQUIPMENT
7 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 3
(Annex II to the Pressure Equipment Directive)CONFORMITY ASSESSMENT TABLES
Regulation 12
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table 1
Vessels referred to in Article 3, Section 1.1(a), first indentExceptionally, vessels intended to contain an unstable gas and falling within categories I or II on the basis of Table 1 must be classified in category III.
Table 2
Vessels referred to in Article 3, Section 1.1(a), second indentExceptionally, portable extinguishers and bottles for breathing equipment must be classified at least in category III
Table 3
Vessels referred to in Article 3, Section 1.1(b), first indent
Table 4
Vessels referred to in Article 3, Section 1.1(b), second indentExceptionally, assemblies intended for generating warm water as referred to in Article 3, Section 2.3, must be subject either to an EC design examination (Module B1) with respect to their conformity with the essential requirements referred to in Sections 2.10, 2.11, 3.4, 5(a) and 5(d) of Annex I, or to full quality assurance (Module H).
Table 5
Pressure equipment referred to in Article 3, Section 1.2Exceptionally, the design of pressure-cookers must be subject to a conformity assessment procedure equivalent to at least one of the category III modules.
Table 6
Piping referred to in Article 3, Section 1.3(a), first indentExceptionally, piping intended for unstable gases and falling within categories I or II on the basis of Table 6 must be classified in category III.
Table 7
Piping referred to in Article 3, Section 1.3(a), second indentExceptionally, all piping containing fluids at a temperature greater than 350°C and falling within category II on the basis of Table 7 must be classified in category III.
Table 8
Piping referred to in Article 3, Section 1.3(b), first indent
Table 9
Piping referred to in Article 3, Section 1.3(b), second indent
SCHEDULE 4
(Annex III to the Pressure Equipment Directive)CONFORMITY ASSESSMENT PROCEDURES
Regulation 13
The obligations arising from the provisions on pressure equipment in this Annex also apply to assemblies.

Module A (internal production control)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module A1 (internal manufacturing checks with monitoring of the final assess ment)
In addition to the requirements of module A, the following applies.
Final assessment must be performed by the manufacturer and monitored by means of unexpected visits by a notified body chosen by the manufacturer.
During such visits, the notified body must:
— establish that the manufacturer actually performs final assessment in accordance with section 3.2 of Annex I,
— take samples of pressure equipment at the manufacturing or storage premises in order to conduct checks. The notified body assesses the number of items of equipment to sample and whether it is necessary to perform, or have performed, all or part of the final assessment of the pressure equipment samples.
Should one or more of the items of pressure equipment not conform, the notified body must take appropriate measures.
On the responsibility of the notified body, the manufacturer must affix the former’s identification number on each item of pressure equipment.
Module B (EC type-examination)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module B1 (EC design-examination)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module C1 (conformity to type)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module D (production quality assurance)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module D1 (production quality assurance)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module E (product quality assurance)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module E1 (product quality assurance)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module F (product verification)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module G (EC unit verification)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module H (full quality assurance)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module H1 (full quality assurance with design examination and special surveillance of the final assessment)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 5
(Annex VI to the Pressure Equipment Directive)CE MARKING
Regulations 2(2), 7(3)(c), 8(3)(a)(iii)
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 6
(Annex VII to the Pressure Equipment Directive)EC DECLARATION OF CONFORMITY
Regulations 7(3)(d), 8(3)(a)(iv)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SCHEDULE 7
EUROPEAN APPROVAL FOR MATERIALS
Regulation 17
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 8
ENFORCEMENT
Regulation 24
Enforcement in Great Britain
1 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Enforcement in Northern Ireland in relation to pressure equipment or assemblies
3 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Forfeiture of pressure equipment or assemblies for private use or consumption: England and Wales and Northern Ireland
4 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Forfeiture of pressure equipment or assemblies for private use or consumption: Scotland
5 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Duty of enforcement authority to inform Secretary of State of action taken
6 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Savings
7 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Interpretation
8 
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .