1997 No. 735
OFFSHORE INSTALLATIONS
The Offshore Installations (Safety Zones) Order 1997
Made 10th March 1997
Coming into force 31st March 1997
The Secretary of State, in exercise of the powers conferred on him by section 22(1) and (2) of the Petroleum Act 1987 (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, hereby makes the following order:
Citation and Commencement
1 
This order may be cited as the Offshore Installations (Safety Zones) Order 1997 and shall come into force on 31st March 1997.
Establishment of safety zones
2 
A safety zone is hereby established around each installation specified in column 1 of Schedule 1 hereto (being an installation stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of that Schedule.
Revocation of orders
3 
The orders listed in Schedule 2 hereto are revoked.
Signed by authority of the Secretary of State.
Paul Beresford
Parliamentary Under Secretary of State,
Department of the Environment
10th March 1997
SCHEDULE 1
SAFETY ZONES
Article 2


(1) (2) (3)
Name or other designation of the offshore installation Latitude North Longitude
South Cormorant Well W4 61° 11' 23.63" 1° 6' 15.6"E
South Cormorant Well P5 61° 10' 52.4" 1° 8' 31.4"E
South Cormorant A UMC 61° 9' 38.957" 1° 6' 38.37"E
Beryl Well 9/13-55 59° 36' 15.6" 1° 29' 4.14"E
Beryl Well 9/13-20B 59° 35' 10.26" 1° 32' 5.77"E
Balmoral Well 16/21B-29 58° 15' 9.71" 1° 3' 25.45"E
Balmoral Well 16/21A-7z 58° 14' 41.8" 01° 06− 17.94' E
Balmoral Well 16/21A-16 58° 13' 43.66" 1° 8' 57.88"E
Balmoral Well 16/21B-14 58° 13' 36.41" 1° 3' 39.29"E
Balmoral Well 16/21B-4A 58° 12' 39.97" 1° 10' 347"E
Buchan Well 21/1-10 57° 53' 33.45" 0° 0' 43.17"E
Buchan Well 21/1-8 57° 53' 30.6" 0° 0' 48.39"E
Thames Bure Wellhead 53° 7' 25.5" 2° 25' 32.3"E
Hewett Well 48/30-8 53° 5' 13.13" 1° 51' 4"E
Thames Yare Wellhead 53° 2' 41.76" 2° 34' 27.23"E
Hewett Well 48/30-9 53° 2' 9" 1° 52' 31"E
Claymore Template T1—WI Wellhead 58° 28' 28.71" 0° 15' 20.43"W
Claymore Template T3—WI Wellhead 58° 25' 55.3" 0° 15' 32.6"W
Scapa Template 58° 25' 39.02" 0° 19' 4.49"W
Highlander Well 14/20 58° 24' 10.4" 0° 7' 19.26"W
Petronella Template 58° 20' 25.4" 0° 5' 30.21"W
Buchan Well 20/5A-1 57° 54' 14.22" 0° 0' 35.88"W
. . . . . . . . .
Beryl Field Wiss 59° 35' 16.26" 1° 28' 43.62"E
Beryl 9/13B Ness 59° 33' 36.72" 1° 25' 52.02"E
North Alwyn Well 3/4A-15 60° 50' 49.26" 1° 40' 59.76"E
Audrey Well 49/11A-7 53° 32' 28.31" 2° 0' 32.35"E
Beryl Well 9/13-48 59° 30' 43.8" 1° 31' 50.28"E
Della Well 48/30-11 53° 4' 43.81" 1° 53' 19.92"E
. . . . . . . . .
. . . . . . . . .
. . . . . . . . .
Central Brae Template 16/7a 58° 44' 44.9" 1° 18' 40.1"E
Piper A 58° 28' 1.03" 0° 15' 35.22"E
. . . . . . . . .
. . . . . . . . .
Osprey W.I. Manifold 61° 19' 37.6" 1° 32' 49.6"E
. . . . . . . . .
Osprey Production Manifold 61° 19' 25.8" 1° 32' 49.11"E
. . . . . . . . .
Chanter Wellhead Protection Unit 58° 23' 27" 0° 22' 15.72"E
Saltire Wellhead Protection Unit 58° 25− 31.04 00° 22− 5.34' E
Gannet D Subsea Drilling Centre 57° 19' 5.1" 1° 4' 58.3"E
. . . . . . . . .
Toni Production Subsea Structure 58° 26' 0.13" 1° 17' 10.67"E
Toni WI Subsea Structure 58° 25' 56.53" 1° 17' 19.07"E
Gannet C1 Drilling Centre 57° 10' 12" 0° 56' 48.6"E
Gannet C2 Drilling Centre 57° 9' 37.3" 0° 58' 31.6"E
Gannet C3 Drilling Centre 57° 9' 13" 0° 55' 32.3"E
Gannet C4 Drilling Centre 57° 8' 21.8" 0° 57' 18.1"E
Strathspey Manifold Structure 60° 55' 39" 1° 42' 25"E
Strathspey Satellite Wells 60° 56' 32.18" 1° 41' 29.67"E
Nelson Oil Field Template 57° 39' 46.35" 1° 8' 44.02"E
Lyell A Cluster Manifold 60° 53' 57.51" 1° 16' 17.49"E
Alwyn Extension Wells 60° 45' 46.28" 1° 42' 53.85"E
Scott WI Manifold West 58° 17' 5.08" 0° 10' 17.91"E
Scott WI Manifold South 58° 15' 29.41" 0° 12' 24"E
Scott WI Manifold East 58° 16' 54.92" 0° 15' 25.13"E
Scott Production Cluster East 58° 16' 54.43" 0° 14' 8.53"E
. . . . . . . . .
. . . . . . . . .
. . . . . . . . .
Hyde 48/6 Subsea Template 53° 48' 26.3" 1° 1' 43.3"E
. . . . . . . . .
Ellon Development Subsea Wellhead 60° 35' 52.71" 1° 48' 26.65"E
Nelson Subsea Manifold 57° 37' 0" 1° 11' 30"E
Gryphon Subsea Well Cluster 59° 21' 4.1" 1° 33' 9.9"E
Anglia West Subsea Structure 53° 22' 22.11" 1° 34' 50.2"E
Phillips Ann Subsea Installation 53° 42' 55" 2° 3' 22"E
. . . . . . . . .
Johnston Field Development 54° 2' 47" 1° 12' 27"E
Hudson Field Development Manifold 61° 15' 10" 0° 44' 8.1"E
Wellhead L1 and L2 61° 15' 38.9" 0° 42' 33.1"E
Fulmar FSU/SALM 56° 27' 44" 2° 7' 14"E
Pelican Drilling Centre 61° 2' 2.06" 1° 7' 44.51"E
Victor North West 49/17-JM 53° 21' 3.22" 2° 17' 43.46"E
Jupiter/Callisto Wellhead 53° 14' 31.92" 2° 23' 16.37"E
Cyrus Manifold 58° 6' 9.16" 1° 26' 47.71"E
Cyrus Wellhead 16/28-C1 58° 6' 9.63" 1° 26' 46.76"E
Cyrus Wellhead 16/28-C2 58° 6' 9.87" 1° 26' 47.04"E
. . . . . . . . .
. . . . . . . . .
Birch Field Manifold 58° 34' 52" 1° 15' 40"E
Nevis Field Wells 59° 31' 56.07" 1° 24' 25.45"E
KT Well 59° 34' 4.43" 1° 28' 51.8"E
South Scott Manifold 58° 14' 54.91" 0° 10' 45.51"E
Foinaven Drilling Centre 1 60° 18' 39.79" 4° 20' 16"W
Foinaven Drilling Centre 2A 60° 20' 37.45" 4° 14' 43.31"W
Foinaven DC2 West WI 60° 20' 55.57" 4° 17' 39.07"W
Foinaven DC2 East WI 60° 18' 43.08" 4° 13' 5.87"W
Liverpool Bay Pipeline End Manifold 53° 41' 0.11" 3° 32' 42.97"W
Thelma Subsea Installation 58° 22' 28.32" 1° 18' 37.58"E
. . . . . . . . .
Joanne Subsea Facility 56° 41' 47.4" 2° 14' 56.4"E
Alison Subsea Facility 53° 30' 33.21" 2° 10' 11.82"E
Teal Oil Producer 57° 17' 4.6" 0° 50' 55.7"E
Teal Water Injection Centre 57° 17' 19.6" 0° 49' 36"E
Teal South Drilling Centre 57° 13' 50.8" 0° 49' 5.8"E
Guillemot A Drilling Centre 57° 10' 6.1" 0° 49' 44"E
Dawn Subsea Installation 53° 7' 48.31" 1° 41' 38.36"E
South Magnus WI Well 61° 32' 23.99" 1° 15' 42.77"E
South Magnus Production Well 61° 34' 4.78" 1° 15' 44.21"E
WI Tree/Flowbase 58° 12' 21.57" 0° 16' 47.32"E
Central Telford Manifold 58° 13' 4.27" 0° 14' 57.69"E
Marmion/West Telford Manifold 58° 14' 19.44" 0° 12' 31.09"E
East Drill Centre 58° 18' 6.51" 0° 45' 18.81"E
West Drill Centre 58° 19' 26.91" 0° 41' 52.86"E
Machar Wellhead 57° 4' 52.2" 2° 5' 6.69"E
Marnock Drilling Plate 57° 17' 42.81" 1° 39' 45.43"E
Mungo Template 57° 22' 31.2" 1° 59' 53.28"E
Umbilical distribution Assembly 60° 17' 59.58" 4° 9' 51.55"W
Esmond Subsea Barrier Valve 54° 35' 10.93" 1° 25' 43.98"E
Hewitt—Little Dotty Well 53° 2' 51.9" 1° 50' 42.5"E
Britannia—Template 58° 2' 55.14" 1° 8' 19.54"E
Britannia—Manifold 58° 4' 27.29" 0° 53' 35.8"E
. . . . . . . . .
Foinaven Gas Disposal Well 60° 17' 25.24" 4° 6' 59.26"W
. . . . . . . . .
. . . . . . . . .
. . . . . . . . .
. . . . . . . . .
. . . . . . . . .
Curlew D—Wellhead 56° 43' 22.14" 1° 18' 40.61"E
Gannet F—Manifold 57° 5' 28.15" 0° 57' 37.36"E
SCHEDULE 2
REVOCATIONS
Article 3


Orders revoked References
The Offshore Installations (Safety Zones) (No. 48) Order 1987 S.I.1987/1332
The Offshore Installations (Safety Zones) (No. 70) Order 1987 S.I.1987/2016
The Offshore Installations (Safety Zones) (No. 71) Order 1987 S.I.1987/2017
The Offshore Installations (Safety Zones) Order 1988 S.I.1988/1080
The Offshore Installations (Safety Zones) (No. 2) Order 1988 S.I.1988/1081
The Offshore Installations (Safety Zones) (No. 3) Order 1988 S.I.1988/1481
The Offshore Installations (Safety Zones) (Amendment) Order 1988 S.I.1988/1482
The Offshore Installations (Safety Zones) Order 1989 S.I.1989/508
The Offshore Installations (Safety Zones) (No. 2) Order 1989 S.I.1989/887
The Offshore Installations (Safety Zones) (No. 3) Order 1989 S.I.1989/1851
The Offshore Installations (Safety Zones) Order 1990 S.I.1990/216
The Offshore Installations (Safety Zones) (No. 2) Order 1990 S.I.1990/896
The Offshore Installations (Safety Zones) (No. 3) Order 1990 S.I.1990/897
The Offshore Installations (Safety Zones) (No. 4) Order 1990 S.I.1990/973
The Offshore Installations (Safety Zones) (No. 5) Order 1990 S.I.1990/1106
The Offshore Installations (Safety Zones) (No. 6) Order 1990 S.I.1990/2117
The Offshore Installations (Safety Zones) Order 1991 S.I.1991/207
The Offshore Installations (Safety Zones) (No. 2) Order 1991 S.I.1991/650
The Offshore Installations (Safety Zones) (No. 3) Order 1991 S.I.1991/1922
The Offshore Installations (Safety Zones) (No. 4) Order 1991 S.I.1991/2669
The Offshore Installations (Safety Zones) Order 1992 S.I.1992/79
The Offshore Installations (Safety Zones) (No. 2) Order 1992 S.I.1992/1429
The Offshore Installations (Safety Zones) (No. 3) Order 1992 S.I.1992/2314
The Offshore Installations (Safety Zones) (No. 4) Order 1992 S.I.1992/2852
The Offshore Installations (Safety Zones) Order 1993 S.I.1993/1406
The Offshore Installations (Safety Zones) (No. 2) Order 1993 S.I.1993/1664
The Offshore Installations (Safety Zones) (No. 3) Order 1993 S.I.1993/1893
The Offshore Installations (Safety Zones) (No. 4) Order 1993 S.I.1993/2479
The Offshore Installations (Safety Zones) Order 1994 S.I.1994/372
The Offshore Installations (Safety Zones) (No. 2) Order 1994 S.I.1994/1836
The Offshore Installations (Safety Zones) Order 1995 S.I.1995/494
The Offshore Installations (Safety Zones) (No. 4) Order 1995 S.I.1995/1956
The Offshore Installations (Safety Zones) (No. 5) Order 1995 S.I.1995/2363
The Offshore Installations (Safety Zones) (No. 6) Order 1995 S.I.1995/2795
The Offshore Installations (Safety Zones) Order 1996 S.I.1996/97
The Offshore Installations (Safety Zones) (No. 2) Order 1996 S.I.1996/850
The Offshore Installations (Safety Zones) (No. 3) Order 1996 S.I.1996/1194
The Offshore Installations (Safety Zones) (No. 4) Order 1996 S.I.1996/1492
The Offshore Installations (Safety Zones) (No. 5) Order 1996 S.I.1996/1862
The Offshore Installations (Safety Zones) (No. 6) Order 1996 S.I.1996/2304
The Offshore Installations (Safety Zones) (No. 7) Order 1996 S.I.1996/2859
The Offshore Installations (Safety Zones) (No. 8) Order 1996 S.I.1996/3139