
1 

(1) This Order may be cited as the West Midlands Rail Freight Interchange (Amendment No. 2) Order 2025 and comes into force on 11th April 2025.
2 
Omit the table in Schedule 15 (certification documents) to the West Midlands Rail Freight Interchange Order 2020 and substitute the table set out in the Schedule to this Order.
Signed by authority of the Secretary of State for Transport
Kayla Marks
Head of the Transport and Works Act Orders Unit
Department for Transport
10th April 2025
SCHEDULE
Article 2
1 
Documents for certification that they are true copies of the documents referred to in this Order

(1) Document/Plan (2) Document Number (3) Document date/Plan number with revision number
Access and rights of way plans  
Key Plan 2.3 WSP-70001979-SK-060 Rev I
Sheet 1 2.3A WSP-70001979-SK-060 Rev H
Sheet 2 2.3B WSP-70001979-SK-060 Rev G
Sheet 3 2.3C WSP-70001979-SK-060 Rev F
Sheet 4 2.3D WSP-70001979-SK-060 Rev F
Sheet 5 2.3E WSP-70001979-SK-060 Rev F
Sheet 6 2.3F WSP-70001979-SK-060 Rev F
Sheet 7 2.3G WSP-70001979-SK-060 Rev B
The book of reference 4.3B 21 August 2019
The bridge plans  
Proposed road bridges plan and long section 2.18A 1516-0425-WDK-SI-C-301-010 Rev P11
Road Bridge B1 2.18B 1516-0425-WDK-SI-C-301-006 Rev P14
Road Bridge B2 and B3 2.18C 1516-0425-WDK-SI-C-300-007 Rev P14
Proposed road bridge B4 section and elevation 2.18D 1516-0425-WDK-SI-C-301-008 Rev P17
The design and access statement 7.5 3 August 2018
The environmental statement 6.2 3 August 2018 (subject to thesubstitutions set out below):(i) Figures 10.001, 10.002, 10.003 and10.004 – 12 September 2018;(ii) Annex 10.1.1 – 12 September2018;(iii) Addendum to Chapter 13 (Noiseand Vibration) – 5 April 2019(iv) Appendix I to TransportAssessment (Appendix 15.1) (SiteWide HGV Management Plan) – 7May 2019(v) Appendix H to TransportAssessment (Appendix 15.1) (SiteWide Travel plan) – 5 July 2019(vi) Appendix 2.3 (Outline Demolitionand Construction Management Plan) –5 July 2019(vii) Appendix 10.4 (FrameworkEcological Mitigation andManagement Plan) – 5 July 2019(viii) Updated Chapter 7 (Air Quality)and Appendices 7.2, 7.3, 7.4, 7.6 and7.7 – 7 August 2019
The future highways maintenance plans  
Key Plan 2.10 WSP-70001979-SK-091 Rev F
Sheet 1 2.10A WSP-70001979-SK-091 Rev F
Sheet 2 2.10B WSP-70001979-SK-091 Rev C
Sheet 3 2.10C WSP-70001979-SK-091 Rev C
The highway classification plans  
Key Plan 2.13 WSP-70001979-SK-068 Rev I
Sheet 1 2.13A WSP-70001979-SK-068 Rev H
Sheet 2 2.13B WSP-70001979-SK-068 Rev E
Sheet 3 2.13C WSP-70001979-SK-068 Rev E
The highway general arrangement plans  
Key Plan/Highway Masterplan 2.9 WSP-70001979-GA-100 Rev M
General Arrangement Plan 101 2.9A WSP-70001979-GA-101 Rev E
General Arrangement Plan 102 2.9B WSP-70001979-GA-102 Rev E
General Arrangement Plan 103 2.9C WSP-70001979-GA-103 Rev I
General Arrangement Plan 104 2.9D WSP-70001979-GA-104 Rev M
General Arrangement Plan 105 2.9E WSP-70001979-GA-105 Rev E
General Arrangement Plan 106 2.9F WSP-70001979-GA-106 Rev G
General Arrangement Plan 107 2.9G WSP-70001979-GA-107 Rev H
General Arrangement Plan 108 2.9H WSP-70001979-GA-108 Rev F
General Arrangement Plan 109 2.9I WSP-70001979-GA-109 Rev G
General Arrangement Plan 110 2.9J WSP-70001979-GA-110 Rev H
General Arrangement Plan 111 2.9K WSP-70001979-GA-111 Rev H
The land plans  
Key Plan 2.1 Key Plan v1
Sheet 1 2.1A Sheet 1 of 12 v0
Sheet 2 2.1B Sheet 2 of 12 v0
Sheet 3 2.1C Sheet 3 of 12 v0
Sheet 4 2.1D Sheet 4 of 12 v1
Sheet 5 2.1E Sheet 5 of 12 v0
Sheet 6 2.1F Sheet 6 of 12 v0
Sheet 7 2.1G Sheet 7 of 12 v0
Sheet 8 2.1H Sheet 8 of 12 v0
Sheet 9 2.1I Sheet 9 of 12 v0
Sheet 10 2.1J Sheet 10 of 12 v0
Sheet 11 2.1K Sheet 11 of 12 v0
Sheet 12 2.1L Sheet 12 of 12 v0
Order limits plan 2.4 4990-00011 Rev 06
The parameters plans  
Development Zone Parameters Plan  
Key Plan 2.5 4990-02000 Rev 11
Sheet 1 2.5A 4990-02001 Rev 11
Sheet 2 2.5B 4990-02002 Rev 08
Sheet 3 2.5C 4990-02003 Rev 12
Sheet 4 2.5D 4990-02004 Rev 07
Floor Levels and Building HeightsParameters Plan  
Key Plan 2.6 4990-02010 Rev 12
Sheet 1 2.6A 4990-02011 Rev 11
Sheet 2 2.6B 4990-02012 Rev 07
Sheet 3 2.6C 4990-02013 Rev 11
Sheet 4 2.6D 4990-02014 Rev 07
Green Infrastructure Parameters Plan  
Key Plan 2.7 4990-02020 Rev 14
Sheet 1 2.7A 4990-02021 Rev 13
Sheet 2 2.7B 4990-02022 Rev 10
Sheet 3 2.7C 4990-02023 Rev 14
Sheet 4 2.7D 4990-02024 Rev 09
The illustrative arrangement of railway alignment 2.14 TRS-DRG-FA-001003 Rev 05
The rail terminal – illustrative expanded rail terminal layout plan 2.15B TRS-DRG-FA-001010 Rev 04
The rail section plans  
Rail Alignment Cross Sections – Sheet 1 2.16A TRS-DRG-FA-001005 Rev 02
Rail Alignment Cross Sections – Sheet 2 2.16B TRS-DRG-FA-001006 Rev 03
Rail Alignment Cross Sections – Sheet 3 2.16C TRS-DRG-FA-001007 Rev 02
Long sections rail alignment Sheet 1 2.16D TRS-DRG-FA-001004 Rev 02
Long sections rail alignment Sheet 2 2.16E TRS-DRG-FA-001008 Rev 02
The speed limit plans  
Key Plan 2.12 WSP-70001979-SK-062 Rev I
Sheet 1 2.12A WSP-70001979-SK-062 Rev K
Sheet 2 2.12B WSP-70001979-SK-062 Rev F
Sheet 3 2.12C WSP-70001979-SK-062 Rev E
SI facility plan 2.20 01
The traffic regulation plans  
Key Plan 2.11 WSP-70001979-SK-061 Rev I
Sheet 1 2.11A WSP-70001979-SK-061 Rev H
Sheet 2 2.11B WSP-70001979-SK-061 Rev E
Sheet 3 2.11C WSP-70001979-SK-061 Rev F
Sheet 4 2.11D WSP-70001979-SK-061 Rev A
The works plans  
Key Plan 2.2 Key Plan v3.0
Sheet 1 2.2A Sheet 1 of 9 v3.0
Sheet 2 2.2B Sheet 2 of 9 v3.0
Sheet 3 2.2C Sheet 3 of 9 v1
Sheet 4 2.2D Sheet 4 of 9 v1
Sheet 5 2.2E Sheet 5 of 9 v1
Sheet 6 2.2F Sheet 6 of 9 v3.0
Sheet 7 2.2G Sheet 7 of 9 v1
Sheet 8 2.2H Sheet 8 of 9 v1
Sheet 9 2.2I Sheet 9 of 9 v1