This Order may be cited as the Net Zero Teesside (Amendment) Order 2025 and comes into force on 29th October 2025.
2 
The Net Zero Teesside Order 2024 is amended in accordance with this Order.
3 
In article 2 (interpretation) of Part 1 (preliminary) omit the existing definition of “book of reference” and replace with ““book of reference” means the documents of that description which are certified by the Secretary of State as the book of reference and the supplemental book of reference under article 45 for the purposes of this Order;”.
4 
In article 2 (interpretation) of Part 1 (preliminary) for ““Order land” means the land which is required for, or is required to facilitate, or is incidental to, or is affected by, the authorised development shown edged red on the land plans and described in the book of reference;” substitute ““Order land” means the land which is required for, or is required to facilitate, or is incidental to, or is affected by, the authorised development shown edged red on the land plans and shown shaded orange on the land plans and described in the book of reference;”.
5 
In article 2 (interpretation) of Part 1 (preliminary) before ““Teesworks Limited” insert ““supplemental land” means the land which is required for, or is required to facilitate, or is incidental to, or is affected by, the authorised development shown shaded orange on the land plans and described in the book of reference;”.
6 
In Part 4 (supplemental powers), article 20 (authority to survey and investigate the land) after paragraph (6) insert—“
(7) The undertaker may not rely upon any powers under this article 20 in respect of the supplemental land.”.
7 
In Part 5 (powers of acquisition), before article 22 insert—“Supplemental land21A. — The undertaker may not compulsorily acquire any interest in or rights over or take temporary possession of any part of the supplemental land pursuant to articles 22, 25, 30, 31, 32 and 33.”.
8 
In Part 5 (powers of acquisition), article 22 (compulsory acquisition of land), paragraph (1) for “The undertaker may” substitute “Subject to article 21A (supplemental land), the undertaker may”.
9 
In Part 5 (powers of acquisition), article 25 (compulsory acquisition of rights etc.), paragraph (1) after “subject to the following paragraphs of this article,” insert—“and article 21A (supplemental land)”.
10 
In Part 5 (powers of acquisition), article 30 (rights under or over streets), paragraph (1) for “The undertaker may” substitute “Subject to article 21A (supplemental land), the undertaker may”.
11 
In Part 5 (powers of acquisition), article 31 (Temporary use of land for carrying out the authorised development), paragraph 1 for “The undertaker may” substitute “Subject to article 21A (supplemental land), the undertaker may”.
12 
In Part 5 (powers of acquisition), article 32 (Temporary use of land for maintaining the authorised development), paragraph (1) after “Subject to paragraph (2),” insert “and article 21A (supplemental land),”.
13 
In Part 5 (powers of acquisition), article 33 (Statutory undertakers), after “Subject to the provisions of Schedule 12 (protective provisions)” insert “and article 21A (supplementary land)”.
14 
In Schedule 1 (authorised development), before Work No. 7 insert—“Work No. 6A – above ground installations required to facilitate Work No. 6, comprising—
(a) above and below ground piping;
(b) a PIG launcher;
(c) remotely operated valves and valve bypass; and
(d) instrumentation and electrical kiosk.”
15 
In Schedule 1 (authorised development), Work No. 9 is amended as follows—
(a) after paragraph (e) “Work No. 9E – Saltholme laydown;” omit “and”;
(b) after paragraph (f) “Work No. 9F – Haverton Hill laydown” for “.” substitute “; and”; and
(c) after paragraph (f) “Work No. 9F – Haverton Hill laydown; and” insert—“
(g) Work No. 9G – temporary construction laydown area.”.
16 
In Schedule 2 (requirements) paragraph 3 (detailed design) sub-paragraph (4) is amended as follows—
(a) at the end of sub-paragraph (b) omit “and”;
(b) at the end of sub-paragraph (c) for “.” substitute “; and”; and
(c) after sub-paragraph (c) insert—“
(d) the siting and external appearance of cable support structures.”
17 
In Schedule 12 (protective provisions) part 18 (for the protection of Anglo American) in paragraph 230 omit the existing definition of “Shared Area 5” and substitute ““Shared Area 5” means the land comprising plots 417, 418, 427, 432, 436, 439, 543, 545, 546, 547 and 548 on the land plans;”.
18 
In Schedule 14 (documents and plans to be certified) Table 13 is omitted and replaced with the following—“

Table 13
(1)Document name (2)Document reference (3)Revision number (4)Date
access and rights of way plans 4.5 7 January 2025
application guide 1.2 20 February 2025
book of reference 3.1 8 April 2023
supplemental book of reference 3.1b 1 January 2025
design and access statement 5.4 6 February 2025
environmental statement Non-technical summary, 6.1 – As listed in the application guide
 Volume 1, 6.2 – 
 Volume 2, 6.3 – 
 Volume 3, 6.4 – 
 Non-technical Summary of Environmental Statement Addendum, 7.7 – 
 Environmental Statement Addendum Volume 1, 7.8.1 – 
 Environmental Statement Addendum Volume II, 7.8.2 – 
 Non-Technical Summary of Second Environmental Statement Addendum, 7.10 – 
 Second Environmental Statement Addendum, Volume 1, 7.11.1 – 
 Second Environmental Statement Addendum, Volume II, 7.11.2 – 
 Non-Technical Summary of Third Environmental Statement Addendum, 7.14 – 
 Third Environmental Statement Addendum – Volume 1, 7.15.1 – 
 Third Environmental Statement Addendum Volume II, 7.15.2 – 
 DCO Non-Material Change Environmental Statement Addendum Volume I – Main Text (6.7a) – 
 DCO Non-Material Change Environmental Statement Addendum – 
 Volume II – Figures (6.7b) – 
 DCO Non-Material Change Environmental Statement Non-Technical Summary – 
 (6.7c) – 
framework construction environmental management plan 6.45 3 October 2022
indicative lighting strategy 5.11 1 May 2021
indicative landscape and biodiversity strategy 5.12 2 August 2022
land plans 4.2 7 January 2025
Net Zero Teesside Anglo American Shared Areas Plan 4.17 2 January 2025
parking plan 4.16.2 3 October 2022
PCC site access plan 4.16.3 2 August 2022
Sembcorp Pipeline Corridor protective provisions supporting plan 4.19 2 January 2025
Sembcorp Protection Corridor protective provisions supporting plans 4.20 2 January 2025
updated landscape and biodiversity plan 4.15 5 January 2025
water connection plan 4.16.4 2 August 2022
works plans 4.4 7 January 2025”
Signed by authority of the Secretary of State for Energy Security and Net Zero
John Wheadon
Head of Energy Infrastructure Planning Delivery
Department for Energy Security and Net Zero
28th October 2025