1 

(1) This Order may be cited as the Electricity (Individual Exemption from the Requirement for a Supply Licence) (Green Volt) (Scotland) Order 2024 and comes into force on 9th August 2024.
(2) This Order extends to England and Wales and Scotland.
(3) This Order applies in relation to Scotland only.
2 

(1) In this Order—
 “the Act” means the Electricity Act 1989;
 “generating station area” means the area delineated by a series of straight lines joining, in the sequence given, the grid locations specified in the table in the Schedule;
 “Green Volt offshore generating station” means the generating station, or that part of the generating station—
(a) located in offshore waters approximately 80 kilometres from the coast of Aberdeenshire, Scotland, within the limits of the generating station area, and
(b) at which electricity is generated for the purpose of supplying at least one offshore installation;
 “Green Volt Offshore Windfarm Limited” means the company of that name registered in Scotland with company number SC698787;
 “offshore installation” means an installation in offshore waters which is used for the purposes of, or in connection with, an activity in respect of which a licence has been granted or is required to be granted (as the case may be) under section 2 of the Petroleum (Production) Act 1934 or section 3 of the Petroleum Act 1998 (as that section has effect on the date on which this Order comes into force);
 “straight line” means a geodesic line.
3 

(1) Exemption is granted from section 4(1)(c) of the Act to Green Volt Offshore Windfarm Limited, in respect of electricity which is generated at Green Volt offshore generating station and supplied to an offshore installation.
(2) Exemption is granted subject to the conditions set out in article 4.
(3) Exemption is granted for a period of 35 years starting with the date on which Green Volt offshore generating station first generates electricity.
4 

(1) Except in circumstances outside its reasonable control, Green Volt Offshore Windfarm Limited must not at any time supply more than 195.5 megawatts of electricity to offshore installations.
(2) As soon as reasonably practicable after each reporting period, Green Volt Offshore Windfarm Limited must provide to the Secretary of State a report which includes the information mentioned in paragraph (3) and, where applicable, paragraph (4).
(3) A report provided under paragraph (2) must include the following information in respect of the reporting period which precedes the date on which the report is provided—
(a) the name and location of any offshore installation to which Green Volt Offshore Windfarm Limited has supplied electricity under the exemption granted by article 3(1); and
(b) information about each occasion (if any) on which Green Volt Offshore Windfarm Limited has supplied more than 195.5 megawatts of electricity to offshore installations, including the circumstances of such supply.
(4) The first report provided under paragraph (2) must also state the date on which Green Volt offshore generating station first generates electricity.
(5) In this regulation, “reporting period” means the period starting with the date on which this Order comes into force and ending on 31 December 2030, and thereafter each successive period of five years during the period of exemption granted under this Order.
Michael Shanks
Minister for Energy
Department for Energy Security and Net Zero
at 9.30 a.m. on 19th July 2024
Schedule
Article 2(1)


Table specifying grid locations
Grid location Latitude (DMS) Longitude (DMS)
1 57° 54' 58.81021322" N 000° 42' 50.48944215" W
2 57° 54' 58.07506979" N 000° 40' 00.64829502" W
3 57° 55' 56.21013332" N 000° 39' 59.20491179" W
4 57° 55' 18.72462236" N 000° 31' 10.96820013" W
5 57° 51' 32.91694306" N 000° 31' 09.21182223" W
6 57° 49' 59.08890355" N 000° 35' 44.00159003" W
7 57° 49' 59.46502500" N 000° 44' 03.95838927" W
8 57° 51' 54.99993460" N 000° 44' 10.31749026" W
9 57° 51' 57.77087984" N 000° 43' 02.53268803" W
1 57° 54' 58.81021322" N 000° 42' 50.48944215" W