1 
This Order may be cited as the Keuper Underground Gas Storage Facility (Amendment) Order 2024 and shall come into force on 16th May 2024.
2 
The Keuper Underground Gas Storage Facility Order 2017 (“the 2017 Order”) is amended in accordance with this Order.
3 
Article 2 (Interpretation) of Part 1 is amended as follows—
(a) in the definition of “Canal & River Trust”, for “whose address is Navigation Road, Northwich, Cheshire CW8 1BH” substitute “whose address is National Waterway Museum, Ellesmere Port, South Pier Road, Ellesmere Port, Cheshire, England, CH65 4FW”; and
(b) in the definition of “undertaker”, for “whose registered office is at Runcorn Site HQ, South Parade, PO Box 9, Runcorn, Cheshire, WA7 4JE” substitute “whose registered office is at Bankes Lane Office, Bankes Lane, PO Box 9, Runcorn, Cheshire, WA7 4JE”.
4 
Article 35 (Certification of plans etc.), is amended as follows—
(a) in paragraph (1)(e)—
(i) for “13-03-01/HOL/24/500-506/B1” substitute “13-03-01/HOL/24/500-503/B1, 13-03-01/HOL/24/504/B2, 13-03-01/HOL/24/505-506/B1”; and
(ii) for “13-03-01/HOL/24/510/B2” substitute “13-03-01/HOL/24/510/B3”;
(b) in paragraph (i)(ii)—
(i) for “13-03-01/HOL/24/270/B4” substitute “13-03-01/HOL/24/270/B5”; and
(ii) for “13-03-01/HOL/24/274/B1” substitute “13-03-01/HOL/24/274/B2”;
(c) in paragraph (1)(j) for “the seismic survey report (document ref: 9.1)” substitute “the seismic survey report (document ref: 9.1) Revision A”;
(d) in paragraph (1)(k) for “the sub-surface safety assessment report (document ref: 9.2)” substitute “the sub-surface safety assessment report (document ref: 9.2) Revision B”;
(e) in paragraph (1)(l) for “the preliminary study of gas design capacity (document ref: 9.3)” substitute “the preliminary study of gas design capacity (document ref: 9.3) Revision B”; and
(f) in paragraph (1)(m)—
(i) for “13-03-01/HOL/24/240-264/B1” substitute “13-03-01/HOL/24/240-262/B1, 13-03-01/HOL/24/263-264/B2”; and
(ii) for “13-03-01/HOL/24/266-268/B1” substitute “13-03-01/HOL/24/266/B2 and 13-03-01/HOL/24/267-268/B1”.
5 
In Part 5 (for the protection of Holford Gas Storage limited) of Schedule 9 (Protective Provisions) in paragraph 62(10), for “the undertaker must comply with” substitute “the promoter must comply with”.
6 

(1) The undertaker must, as soon as practicable after the making of this Order, submit copies of any new, revised or substituted plans to the Secretary of State for certification that they are true copies of the plans referred to in this Order.
(2) A plan so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
(3) In paragraph (1), the “undertaker” has the same meaning as in Article 2 of the 2017 Order.
Signed by authority of the Secretary of State for Energy Security and Net Zero.
Victoria Dawe
Director of Energy Development
Department for Energy Security and Net Zero
15th May 2024