1 
This Order may be cited as the Immingham Open Cycle Gas Turbine (Amendment) (No. 2) Order 2024 and comes into force on 28th March 2024.
2 
The Immingham Open Cycle Gas Turbine Order 2020 is amended in accordance with this Order.
3 
For the table in Schedule 12, substitute—“

Table 9
(1)Building or structure (2)Maximum length (metres) (3)Maximum width (metres) (4)Maximum height (metres above 0 meters above ordnance datum) (5)Maximum diameter (metres)
Single gas turbine and generator 31 20 20 -
Gas turbine building 50 35 29 -
Exhaust stack - - 56 12
Air intakes 24 16 40 -
Fin-fan cooler 30 15 17 -
Control room, workshops, stores 35 20 16 -
Demineralised tank, firewater tank - - 32 24”
Signed by authority of the Secretary of State for Energy Security and Net Zero
David Wagstaff
Deputy Director – Energy Infrastructure Planning
Department for Energy Security and Net Zero
27th March 2024