
Article 1 
The location of the coordination centre for system operations, mission control centres, ranging and integrity monitoring stations, stations for communication with the geostationary satellites and service centre constituting the ground infrastructure of the EGNOS system shall be set out in the Annex.
Article 2 
This Decision shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union.
Done at Brussels, 31 July 2017.
For the Commission
The President
Jean-Claude JUNCKER
ANNEX

Name Site
Coordination centre for system operations Toulouse (France)
Mission control centres Ciampino (Italy), Torrejon (Spain)
Ranging and integrity monitoring stations (RIMS) Aalborg (Denmark), Abou Simbel (Egypt), Azores (Portugal), Agadir (Morocco), Al'Aqaba (Jordan), Alexandria (Egypt), Athens (Greece), Berlin (Germany), Catania (Italy), Ciampino (Italy), Cork (Ireland), Djerba (Tunisia), Egilsstadir (Iceland), Gavle (Sweden), Glasgow (UK), Golbasi (Turkey), Gran Canaria (Spain), Haifa (Israel), Hartebeeshoek (South Africa), Jan Mayen (Norway), Kiev (Ukraine), Kirkenes (Norway), Kourou (France), Kuusamo (Finland), Lappeenranta (Finland), La Palma (Spain), Lisbon (Portugal), Madeira (Portugal), Malaga (Spain), Moncton (Canada), Nouakchott (Mauritania), Oran (Algeria), Palma de Mallorca (Spain), Paris (France), Reykjavik (Iceland), Santiago de Compostela (Spain), Sofia (Bulgaria), Svalbard (Norway), Swanwick (UK), Toulouse (France), Tromsø (Norway), Trondheim (Norway), Warsaw (Poland), Zurich (Switzerland)
Navigation land earth stations (NLES) Aussaguel (France), Betzdorf (Luxembourg), Burum (Netherlands), Cagliari (Italy), Fucino (Italy), Rambouillet (France), Redu (Belgium)
Service centre Torrejon (Spain)