
1 

(1) This Order may be cited as the Offshore Installations (Safety Zones) (No. 2) Order 2016.
(2) This Order comes into force on 27th June 2016 except for article 2(2) which comes into force as provided in article 2(3).
2 

(1) A safety zone is established around each installation specified in column 1 of Part 1 of the Schedule (being an installation stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of five hundred metres, as respects that installation, from the point which has the co-ordinates of latitude and longitude according to the World Geodetic System 1984 specified in columns 2 and 3 of Part 1 of the Schedule.
(2) A safety zone is established around the installation specified in column 1 of Part 2 of the Schedule (being an installation to be stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of five hundred metres, as respects that installation, from the point which has the co-ordinates of latitude and longitude according to the World Geodetic System 1984 specified in columns 2 and 3 of Part 2 of the Schedule.
(3) Paragraph (2) comes into force, in respect of the installation specified in column 1 of Part 2 of the Schedule—
(a) on 27th June 2016, where the installation arrives at its station before that date; and
(b) when the installation arrives at its station, in any other case.
Signed by authority of the Secretary of State for Work and Pensions
Justin Tomlinson
Parliamentary Under Secretary of State,
Department for Work and Pensions
6th June 2016
SCHEDULE
Article 2
PART 1

(1)Name or other designation of the offshore installation (2)Latitude (3)Longitude
. . . . . . . . .
. . . . . . . . .
PART 2

(1)Name or other designation of the offshore installation (2)Latitude (3)Longitude
Harding Offshore Loading System, Block 9/23b, Harding Field 59°16.67ʹ North 01°32.90ʹ East