Article 1 

1. The transitional national plan which the United Kingdom of Great Britain and Northern Ireland notified to the Commission pursuant to Article 32(5) of Directive 2010/75/EU on 14 December 2012, is not in accordance with the requirements laid down in Article 32(1), (3) and (4) of Directive 2010/75/EU and in Implementing Decision 2012/115/EU, and shall, therefore, not be accepted.
2. If the United Kingdom of Great Britain and Northern Ireland intends to implement the transitional national plan, it shall take all necessary measures to address, in a revised version of the plan, the following elements:
(a) for the plant ‘Aberthaw Power Station’, which contributes significantly to the overall TNP ceiling for NOx, to correct the emission limit value applied for calculating its contribution to the 2016 ceiling for NOx; in order for the plant to be eligible for using the emission limit value of 1 200 mg/Nm3, the United Kingdom of Great Britain and Northern Ireland shall demonstrate that the average annual volatile content of the solid fuel used in the plant was below 10 % in the reference years considered for the TNP as set out in Note 2 of Table C.1 to Appendix C of the Annex to Implementing Decision 2012/115/EU;
(b) for the plants listed in the Annex to this decision, to submit the missing data and to correct or clarify all ambiguities in order to obtain full consistency across the information included in, and used for, the transitional national plan; for the purposes of this point, the detailed clarification requests set out in the Commission’s letters sent to the United Kingdom of Great Britain and Northern Ireland on 3 June and 10 September 2013 shall be taken into account.
Article 2 
This Decision is addressed to the United Kingdom of Great Britain and Northern Ireland.
Done at Brussels, 12 December 2013.
For the Commission
Janez POTOČNIK
Member of the Commission
ANNEX
Plant number used in the TNP Plant name
9 Great Coates Works LCP 62
10 Great Coates Works LCP 63
11 Great Coates Works LCP 96
12 Grangemouth Polimeri Europa UK
13 Port of Liverpool CHP — GT
16 Aylesford CHP1
17 Aylesford CHP2
18 Kinneil Stack A1 (B-101)
28 Burghfield Generation Site
37 Cheshire CHP
38 Chickerall Generation Site
44 Wansborough Mill
46 Didcot B Module 6
47 Dow CHP
49 Dalry DSM CHP
58 Ratcliffe on Soar Power Station
68 Grimsby CHP1
71 Hythe CHP1
72 Hythe Package Boilers
73 Indian Queens
81 Keadby Power Station GT3
84 Little Barford Power Station Module 1A
85 Little Barford Power Station Module 1B
99 Sellafield Site Gas Turbine 1
100 Sellafield Site Gas Turbine 2
101 Sellafield Site Gas Turbine 3
102 Sellafield Site Auxiliary Boiler
103 Wilton Power Station
107 Solvay Interox Ltd
120 INEOS Infrastructure (Grangemouth) Ltd Boilers 9 & 10
121 INEOS Infrastructure (Grangemouth) Ltd Boilers 11, 12 & 13
124 Redcar Power Station Boiler
128 Wilton Olefin Boiler
129 North Tees No 1 Aromatics Plant