
1 
This Order may be cited as the Offshore Installations (Safety Zones) (No. 3) Order 2005 and shall come into force on 14th December 2005.
2 
A safety zone is established around each installation specified in column 1 of the Schedule (being an installation stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of the Schedule.
Signed by the authority of the Secretary of State for Work and Pensions
Philip A Hunt
Parliamentary Under Secretary of State,
Department for Work and Pensions
23rd November 2005
SCHEDULE
Article 2


(1) (2) (3)
Name or other designation of the offshore installation Latitude North Longitude
Columba E Subsea Water Injection, Block 3/8a, Columba E Field 60° 44.67' 01° 25.01' E
North West Seymour Subsea Installation, Block 22/5b, Seymour Field 57° 58.30' 01° 51.70' E
Captain C Subsea Facilities, Block 13/22a, Captain Field 58° 18.41' 01° 39.83' W
Kittiwake SAL, Block 21/18a, Kittiwake Field 57° 29.33' 00° 32.56' E