Article 1 

1. Member States shall make available to the Commission the information on the implementation of the integrated emission management techniques set out in BAT 57 and BAT 58 adopted by Implementing Decision 2014/738/EU.The information referred to in the first subparagraph shall be made available in accordance with the Annex and shall cover the years 2017, 2018 and 2019. That information shall be made available for each of the mineral oil and gas refineries where an integrated emission management technique set out in BAT 57 or BAT 58 is implemented for emissions to air of nitrogen oxides (NOx) or sulphur dioxide (SO2).
2. The information referred to in paragraph 1 shall be made available to the Commission by 30 September 2020 at the latest using the electronic reporting format provided for that purpose.
Article 2 
This Decision is addressed to the Member States.
Done at Brussels, 30 October 2014.
For the Commission
Janez POTOČNIK
Member of the Commission
ANNEX
1.  1.1. Reference number of the installation: unique installation identifier for the purposes of Directive 2010/75/EU.
 1.2. Installation name.
 1.3. Operator name.
 1.4. Installation address: street, postal code, city and country.

2.  2.1. 

((a)) type of unit (combustion unit, fluid catalytic cracking unit, waste gas sulphur recovery unit);
((b)) rated thermal input (for combustion units);
((c)) fuel type(s) fired (for combustion units);
((d)) new or existing unit;
((e)) substantial and structural changes, e.g. in operation or fuel use, during the reporting period, which affected the applicable BAT-associated emission levels (BAT-AELs).
 2.2. 

((a)) values, units, averaging periods and reference conditions;
((b)) how these limit values were determined in relation to BAT 57 and BAT 58 set out in the BAT conclusions under Implementing Decision 2014/738/EU;
((c)) which emission concentrations were considered for each unit concerned in relation to BAT 57 and BAT 58 and in comparison with the individual BAT-AELs and the BAT-associated environmental performance levels (BAT-AEPL) for waste gas sulphur recovery units;
((d)) which flue-gas flow rates (or other factors) were used as the weighing factor for each unit and how these were determined;
((e)) which other elements or factors were used to establish the limit values.

3.  3.1. Description of the monitoring system used for determining the emissions under the integrated emission management techniques.
 3.2. Details on the parameters measured and calculated, the type (direct, indirect) and methods of measurements used, the calculation factors used (and their justification) and the frequency of monitoring.

4. 
Overview of the results of monitoring in view of demonstrating that the applicable BAT-AELs set out in BAT 57 and BAT 58 have been complied with and that the resulting emissions are equal to or lower than emissions when applying the applicable BAT-AELs and BAT-AEPLs at a unit-by-unit level, including at least the following:


((a)) average emission concentration across all units concerned (mg/Nm3, all monthly averages during a year);
((b)) total monthly emission across all units concerned (tonnes/month);
((c)) average emission concentration for each unit concerned (mg/Nm3, all monthly averages during a year);
((d)) flue gas flow rate for each unit concerned (Nm3/hour, all monthly averages during a year).