
Article 1 
The ‘Emergency plan for the surveillance of rabies’ submitted by Greece to the Commission on 27 January 2012 (‘the plan’) is hereby approved for the grant of a Union financial contribution for the period from 27 January 2012 to 31 December 2012 (‘the financial contribution’).
Article 2 

1. The financial contribution shall not exceed, in total, EUR 60 000.
2. The financial contribution shall include a lump sum of EUR 5 per wild animal collected and sent for rabies investigation under the plan.
3. The financial contribution shall be at the rate of 75 % of the costs to be incurred under the plan for the laboratory tests for the detection of rabies infection and for the isolation and characterisation of rabies virus.Those costs shall include:
(a) the costs paid for the purchase of test kits, reagents and all consumables used to carry out the laboratory tests;
(b) overheads equal to 7 % of the total sum of the costs referred to in point (a).However, the maximum amount of the costs to be reimbursed for a fluorescent antibody test (FAT) shall not exceed, in total, EUR 12 per test.
4. The financial contribution shall be at the rate of 75 % of the costs for personnel specifically hired for carrying out the laboratory tests referred to in paragraph 3.Those costs shall include:
(a) the fee paid for the personnel or their actual salaries plus social security charges and other statutory costs included in their remuneration;
(b) overheads equal to 7 % of the total sum of the costs referred to in point (a).However, the maximum amount of the costs to be reimbursed for such personnel shall not exceed, in total, EUR 25 000.
Article 3 

1. The financial contribution shall be granted provided that Greece:
(a) implements the plan in accordance with the relevant provisions of Union law, including rules on competition, the award of public contracts and State aid;
(b) submits interim technical reports to the Commission in accordance with Annex I by the latest on:
((i)) 31 May 2012, covering the period from 27 January 2012 to 30 April 2012;
((ii)) 30 September 2012, covering the period from 1 May 2012 to 31 August 2012;
(c) submits a final technical report and a financial report in accordance with Annexes I and II, covering the period from 27 January 2012 to 31 December 2012, by the latest on 28 February 2013;
(d) implements satisfactorily the measures foreseen in the plan.
2. In the event that Greece does not comply with the conditions laid down in paragraph 1, the Commission shall reduce the financial contribution taking into account the nature and gravity of the non-compliance and the financial loss incurred by the Union.
Article 4 
This Decision shall apply from 27 January 2012.
Article 5 
This Decision is addressed to the Hellenic Republic.
Done at Brussels, 6 March 2012.
For the Commission
John DALLI
Member of the Commission
ANNEX I
The technical reports referred to in Article 3(1)(b) and (c) shall include at least the following information:

Reporting period: from _ to _. Interim technical report Final technical report 
A. 

Prefecture Species Test type Number of animals tested Positive
    
    
    
    
    
    

B. Technical evaluation of the situation and difficulties faced.

ANNEX II

The financial report referred to in Article 3(1)(c) shall include at least the following information:

Measures eligible for co-financing
Laboratory tests
 Type of tests Number of animals tested Number of tests carried out Cost of tests carried out without overheads
Detection of rabies virus antigen FAT   
PCR   
other (please specify)   
Isolation/Characterisation of rabies virus Sequencing   
other (please specify)   
Total    
Laboratory personnel specifically hired for the purposes of the plan
Name Status (Permanent/Temporary) Contract duration Amount paid
   
   
   
   
   
I certify that:

— this expenditure was actually incurred, accurately accounted for and eligible under the provisions of Commission Implementing Decision 2012/141/EU,
— no other contribution from the Union was requested for this plan and all revenue accruing from operations under the programme is declared to the Commission,
— the plan was executed in accordance with the relevant Union legislation, in particular the rules on competition, the award of public contracts and State aid,
— control procedures apply, in particular to verify the accuracy of the amounts declared, to prevent, detect and correct irregularities.
Date:
Name and signature of operational director:
