Article 1 
A technical specification for interoperability (TSI) relating to the infrastructure subsystem of the trans-European conventional railway, is hereby adopted by the Commission.
The TSI shall be as set out in the Annex to this Decision.
Article 2 
This TSI shall be applicable to all new, upgraded or renewed infrastructure of the trans-European conventional rail system as defined in Annex I to Directive 2008/57/EC.
Article 3 

1. With regard to those issues classified as open points set out in Annex F of the TSI, the conditions to be complied with for the verification of the interoperability pursuant to Article 17(2) of Directive 2008/57/EC shall be those applicable technical rules in use in the Member State which authorise the placing in service of the subsystems covered by this Decision.
2. Each Member State shall notify to the other Member States and to the Commission within six months of the notification of this Decision:
(a) the applicable technical rules mentioned in paragraph 1;
(b) the conformity assessment and checking procedures to be applied with regard to the application of the technical rules mentioned in paragraph 1;
(c) the bodies it appoints for carrying out the conformity assessment and checking procedures of the open points mentioned in paragraph 1.
Article 4 

1. The Member State shall define which lines of the conventional trans-European transport network (TEN-T) as established by Decision No 1692/96/EC of the European Parliament and of the Council are intended to be classified as core TEN lines or other TEN lines on the basis of the categories given in Section 4.2.1 of this TSI. Member States shall notify this information to the Commission within a period of one year from the date of application of this Commission Decision.
2. The Commission, in cooperation with the Agency and the Member States, shall coordinate the classification referred to in paragraph 1, especially with regard to the border crossings and its consistency with the European Deployment Plan on European Rail Traffic Management System as referred to in Commission Decision 2009/561/EC.
3. The final classification resulting from the coordination shall be examined by the Committee set up by Council Directive 96/48/EC and, after discussion, made public by the Agency.
4. The Member State shall take into account the classification published by the Agency when defining its national migration plan.
Article 5 
The procedures for assessment of conformity, suitability for use and EC verification set out in Chapter 6 of the TSI in Annex shall be based on the modules defined in Decision 2010/713/EU.
Article 6 

1. During a transition period of 10 years, it shall be permissible to issue an EC certificate of verification for a subsystem that contains interoperability constituents not holding an EC declaration of conformity or suitability for use, on the condition that the provisions set out in Section 6.6 of the Annex are met.
2. The production or upgrade/renewal of the subsystem with use of the non-certified interoperability constituents must be completed within the transition period, including the placing in service.
3. During the transition period Member States shall ensure that:
(a) the reasons for non-certification of the interoperability constituents are properly identified in the verification procedure referred to in paragraph 1;
(b) the details of the non-certified interoperability constituents and the reasons for non-certification, including the application of national rules notified under Article 17 of Directive 2008/57/EC, are included by the National Safety Authorities in their report referred to in Article 18 of Directive 2004/49/EC of the European Parliament and of the Council.
4. After the transition period and with the exceptions allowed under Section 6.6.3 on maintenance, interoperability constituents shall be covered by the required EC declaration of conformity and/or suitability for use before being incorporated into the subsystem.
Article 7 
In accordance with Article 5(3)(f) of Directive 2008/57/EC, Chapter 7 of the TSI in Annex, sets out a strategy for migrating towards a full interoperable infrastructure subsystem. This migration needs to be applied in conjunction with Article 20 of that Directive which specifies the principles of the application of the TSI to the renewal and upgrading projects. Member States shall notify to the Commission a report on the implementation of Article 20 of Directive 2008/57/EC 3 years after the entry into force of this Decision. This report will be discussed in the context of the Committee set up in Article 29 of Directive 2008/57/EC and, where appropriate, the TSI in Annex will be adapted.
Article 8 

1. With regard to those issues classified as specific cases set out in Chapter 7 of the TSI, the conditions to be complied with for the verification of the interoperability pursuant to Article 17(2) of Directive 2008/57/EC shall be those applicable technical rules in use in the Member State which authorise the placing in service of the subsystems covered by this Decision.
2. Each Member State shall notify to the other Member States and to the Commission within six months of the notification of this Decision:
(a) the applicable technical rules mentioned in paragraph 1;
(b) the conformity assessment and checking procedures to be applied with regard to the application of the technical rules mentioned in paragraph 1;
(c) the bodies it appoints for carrying out the conformity assessment and checking procedures of the specific cases mentioned in paragraph 1.
Article 9 
This Decision shall apply from 1 June 2011.
Article 10 
This Decision is addressed to the Member States.
Done at Brussels, 26 April 2011.
For the Commission
Siim KALLAS
Vice-President
ANNEX TECHNICAL SPECIFICATION FOR INTEROPERABILITY  1.  1.1. 
This TSI concerns the infrastructure subsystem and part of the maintenance subsystem of the trans-European conventional rail system. They are included in the list of subsystems in Annex II (1) to Directive 2008/57/EC.
 1.2. 
The geographical scope of this TSI is the trans-European conventional rail system as described in Annex I (1.1) to Directive 2008/57/EC.
 1.3. 
In accordance with Article 5(3) of Directive 2008/57/EC, this TSI:


((a)) indicates its intended scope (Chapter 2);
((b)) lays down essential requirements for the infrastructure subsystem (Chapter 3);
((c)) establishes the functional and technical specifications to be met by the subsystem and its interfaces vis-à-vis other subsystems (Chapter 4);
((d)) determines the interoperability constituents and interfaces which must be covered by European specifications, including European standards, which are necessary to achieve interoperability within the trans-European conventional rail system (Chapter 5);
((e)) states, in each case under consideration, which procedures are to be used in order to assess the conformity or the suitability for use of the interoperability constituents, on the one hand, or the EC verification of the subsystems, on the other hand (Chapter 6);
((f)) indicates the strategy for implementing this TSI (Chapter 7);
((g)) indicates, for the staff concerned, the professional competences and health and safety conditions at work required for the operation and maintenance of the subsystem, as well as for the implementation of this TSI (Chapter 4).

In accordance with Article 5(5) of the Directive 2008/57/EC, provisions for specific cases are indicated in Chapter 7.

This TSI also sets out, in Chapter 4, the operating and maintenance rules specific to the scope indicated in paragraphs 1.1 and 1.2 above.
 2.  2.1. 
This TSI covers:


((a)) the infrastructure structural subsystem;
((b)) the part of the maintenance functional subsystem relating to the infrastructure subsystem (that is: washing plants for external cleaning of trains, water restocking, refuelling, fixed installations for toilet discharge and electrical shore supplies).

The elements of the infrastructure subsystem are described in Annex II (2.1. Infrastructure) to Directive 2008/57/EC.

The scope of this TSI therefore includes the following aspects of the infrastructure subsystem:


((a)) Line layout,
((b)) Track parameters,
((c)) Switches and crossings,
((d)) Track resistance to applied loads,
((e)) Structures resistance to traffic loads,
((f)) Track geometrical quality and limits on isolated defects,
((g)) Platforms,
((h)) Health, safety and environment,
((i)) Provision for operation,
((j)) Fixed installations for servicing trains.

Further details are set out in Section 4.2.3 of this TSI.
 2.2. 
Section 4.3 of this TSI sets out the functional and technical specification of the interfaces with the following subsystems, as defined in the relevant TSIs:


((a)) Rolling stock subsystem,
((b)) Energy subsystem,
((c)) Control command and signalling subsystem,
((d)) Traffic operation and management subsystem.

Interfaces with the persons with reduced mobility TSI (PRM TSI) are described in Section 2.3 below.

Interfaces with the safety in railway tunnels TSI (SRT TSI) are described in Section 2.4 below.
 2.3. 
All requirements relating to the infrastructure subsystem for the access of persons with reduced mobility to the railway system are set out in the persons with reduced mobility TSI.

This TSI does not therefore include requirements relating to this aspect of the infrastructure subsystem.
 2.4. 
All requirements relating to the infrastructure subsystem for safety in railway tunnels are set out in the safety in railway tunnels TSI.

This TSI does not therefore include requirements relating to this aspect of the infrastructure subsystem.
 2.5. 
The scope of this TSI excludes noise mitigation, pending the proposal referred to in the technical specification for interoperability relating to the subsystem ‘rolling stock — noise’, which specifies the following:

'
Commission Decision of 23 December 2005 (2006/66/EC).

This Decision shall become applicable six months after the date of its notification.
 7.2. 
… the EC will deliver to “the Article 21 Committee”, at the latest seven years after the date of entry into force of this TSI, a report and, if needed, a proposal for revising this TSI about following issues:


5.. the inclusion of infrastructure into the scope of the Noise TSI in coordination with the TSI Infrastructure;
'
 3. 
The following table indicates references to the essential requirements set out in Annex III to Directive 2008/57/EC that are delivered by the requirements for basic parameters set out in Chapter 4.


Section Basic parameters of CR INF subsystem Safety Reliability Availability Health Environmental protection Technical compatibility
4.2.4.1 Structure gauge 1.1.1    1.5-§1
4.2.4.2 Distance between track centres 1.1.1    1.5
4.2.4.3 Maximum gradients 1.1.1    1.5-§1
4.2.4.4 Minimum radius of horizontal curve     1.5-§1
4.2.4.5 Minimum radius of vertical curve     1.5-§1
4.2.5.1 Nominal track gauge     1.5-§1
4.2.5.2 Cant 1.1.1    
4.2.5.3 Rate of change of cant     1.5-§1
4.2.5.4 Cant deficiency 1.1.1    1.5-§1
4.2.5.5 Equivalent conicity 1.1.1, 1.1.2    1.5
4.2.5.6 Railhead profile for plain line 1.1.1, 1.1.2    1.5-§1
4.2.5.7 Rail inclination 1.1.1, 1.1.2    1.5-§1
4.2.5.8 Track stiffness     1.5
4.2.6.1 Means of locking 1.1.1, 1.1.2    
4.2.6.2 In-service geometry of switches and crossings 1.1.1, 1.1.2 1.2   1.5
4.2.6.3 Maximum unguided length of fixed obtuse crossings 1.1.1, 1.1.2    1.5
4.2.7.1 Track resistance to vertical loads 1.1.1, 1.1.2, 1.1.3    1.5-§1
4.2.7.2 Longitudinal track resistance 1.1.1, 1.1.2, 1.1.3    1.5-§1
4.2.7.3 Lateral track resistance 1.1.1, 1.1.2, 1.1.3    1.5-§1
4.2.8.1 Resistance of new bridges to traffic loads 1.1.1, 1.1.3    1.5-§1
4.2.8.2 Equivalent vertical loading for new earthworks and earth pressure effects 1.1.1, 1.1.3    1.5-§1
4.2.8.3 Resistance of new structures over or adjacent to tracks 1.1.1, 1.1.3    1.5-§1
4.2.8.4 Resistance of existing bridges and earthworks to traffic loads 1.1.1, 1.1.3    1.5-§1
4.2.9.1 Determination of immediate action, intervention, and alert limits 1.1.1, 1.1.2 1.2   1.5-§1
4.2.9.2 Immediate action limit for track twist 1.1.1, 1.1.2 1.2   1.5-§1
4.2.9.3 Immediate action limit for variation of track gauge 1.1.1, 1.1.2 1.2   1.5-§1
4.2.9.4 Immediate action limit for cant 1.1.1 1.2   1.5-§1
4.2.10.1 Usable length of platforms     1.5
4.2.10.2 Width and edge of platforms 1.1.1    
4.2.10.3 End of platforms 1.1.1    
4.2.10.4 Height of platforms 1.1.1, 2.1.1-§3    1.5-§1
4.2.10.5 Offset of platforms 1.1.1, 2.1.1-§3    1.5-§1
4.2.11.1 Maximum pressure variation in tunnels 2.1.1-§ 2, 2.1.1-§ 4    
4.2.11.2 Noise and vibration limits and mitigation measures    1.4.1, 1.4.4, 1.4.5 
4.2.11.3 Protection against electric shock 2.1.1-§3    
4.2.11.4 Safety in railway tunnels 1.1.1, 1.1.4, 2.1.1-§1, 2.1.1-§4  1.3 1.4.2 
4.2.11.5 Effect of crosswinds 1.1.1    
4.2.12.1 Distance markers  1.2   
4.2.13.2 Toilet discharge  1.2 1.3.1  1.5-§1
4.2.13.3 Train external cleaning facilities  1.2   1.5-§1
4.2.13.4 Water restocking  1.2 1.3.1  1.5-§1
4.2.13.5 Refuelling  1.2 1.3.1  1.5-§1
4.2.13.6 Electric shore supply  1.2   1.5-§1
4.4.1 Exceptional conditions relating to pre-planned works  1.2   
4.4.2 Degraded operation  1.2   
4.4.3 Protection of workers against aerodynamic effects 2.1.1-§2    
4.5 Maintenance plan  1.2   
4.6 Professional competences 1.1.5 1.2   
4.7 Health and safety conditions 2.1.1-§2, 2.1.1-§3, 2.1.1-§4 1.2 1.3 1.4.2 1.5
 4.  4.1.  (1) The trans-European conventional railway system, to which Directive 2008/57/EC applies and of which the infrastructure and maintenance subsystems are parts, is an integrated system whose coherence must be verified, with the objective of assuring the interoperability of the system in respect of the essential requirements.
 (2) 
Therefore, when designing a new or upgraded conventional line, consideration should be given to all trains which may be authorised on the line.
 (3) The limiting values set out in the present TSI are not intended to be imposed as usual design values. However the design values must be within the limits set out in this TSI.
 (4) The functional and technical specifications of the subsystem and its interfaces, described in Sections 4.2 and 4.3, do not impose the use of specific technologies or technical solutions, except where this is strictly necessary for the interoperability of the trans-European conventional rail network. But innovative solutions for interoperability could require new specifications and/or new assessment methods. In order to allow technological innovation, these specifications and assessment methods shall be developed by the process described in Section 6.2.3.
 4.2.  4.2.1.  (1) Annex I (1.1) to the Directive recognises that the conventional rail network may be subdivided into different categories. In order to deliver interoperability cost-effectively this TSI defines ‘TSI categories of line’. The functional and technical specifications of this TSI vary according to the TSI categories of line.
 (2) 

Table 2
TSI categories of line for the conventional rail infrastructure subsystem
TSI categories of line Types of traffic
Passenger traffic (P) Freight traffic (F) Mixed traffic (M)
Types of line New core TEN line (IV) IV-P IV-F IV-M
Upgraded core TEN line (V) V-P V-F V-M
New other TEN line (VI) VI-P VI-F VI-M
Upgraded other TEN line (VII) VII-P VII-F VII-M (3) Note that passenger hubs, freight hubs and connecting lines are included in the above TSI categories of line, as appropriate.
 (4) The TSI category of line for every section of track shall be published in the Register of Infrastructure.
 4.2.2.  (1) 

((a)) gauge,
((b)) axle load,
((c)) line speed,
((d)) train length.
 (2) 

Table 3
Performance parameters for TSI categories of line
 Gauge Axle load(t) Line speed(km/h) Train length(m)
TSI categories of line IV-P GC 22,5 200 400
IV-F GC 25 140 750
IV-M GC 25 200 750
V-P GB 22,5 160 300
V-F GB 22,5 100 600
V-M GB 22,5 160 600
VI-P GB 22,5 140 300
VI-F GC 25 100 500
VI-M GC 25 140 500
VII-P GA 20 120 250
VII-F GA 20 100 500
VII-M GA 20 120 500
Notes: (P) = passenger traffic, (F) = freight traffic, (M) = mixed traffic, gauge GA, GB, GC are as defined in EN 15273-3:2009 Annex C. (3) 
‘The TSIs shall not be an impediment to decisions by the Member States concerning the use of infrastructures for the movement of vehicles not covered by the TSIs.’

It is therefore permissible to design new and upgraded lines such that they will also accommodate larger gauges, higher axle loads, greater speeds and longer trains than those specified.
 (4) It is permissible for specific locations on the line to be designed for line speed and/or train lengths less than those set out in Table 3, where duly justified to meet geographical, urban or environmental constraints.
 (5) Infrastructure designed to the minimum requirements of this TSI does not provide the capability to meet both maximum speed and maximum axle load in combination. The infrastructure is only capable of being exploited at maximum speed for axle loads less than the maximum set out in Table 3, and similarly the infrastructure is only capable of being exploited at maximum axle load for speeds less than the maximum set out in Table 3.
 (6) The actual performance parameters for each section of track shall be published in the Register of Infrastructure.
 (7) The published information relating to axle load shall use EN line categories and/or locomotive classes defined in EN 15528:2008 Annexes A, J and K in combination with the permitted speed. If the load carrying capability of a section of track exceeds the range of EN line categories and or locomotive classes specified, then additional information defining the load carrying capability may be provided.
 (8) The published information relating to gauge shall state which of the gauges GA, GB or GC is provided. Additionally the published information shall include other gauges defined in EN 15273:2009 Annex D that are provided for multi-national agreements. The published information may include national gauges that are provided for domestic use.
 4.2.3.  4.2.3.1.  (1)  A. 

((a)) Structure gauge (4.2.4.1),
((b)) Distance between track centres (4.2.4.2),
((c)) Maximum gradients (4.2.4.3),
((d)) Minimum radius of horizontal curve (4.2.4.4),
((e)) Minimum radius of vertical curve (4.2.4.5),
 B. 

((f)) Nominal track gauge (4.2.5.1),
((g)) Cant (4.2.5.2),
((h)) Rate of change of cant (as a function of time) (4.2.5.3),
((i)) Cant deficiency (4.2.5.4),
((j)) Equivalent conicity (4.2.5.5),
((k)) Railhead profile for plain line (4.2.5.6),
((l)) Rail inclination (4.2.5.7),
((m)) Track stiffness (4.2.5.8),
 C. 

((n)) Means of locking (4.2.6.1),
((o)) In-service geometry of switches and crossings (4.2.6.2),
((p)) Maximum unguided length of fixed obtuse crossings (4.2.6.3),
 D. 

((q)) Track resistance to vertical loads (4.2.7.1),
((r)) Longitudinal track resistance (4.2.7.2),
((s)) Lateral track resistance (4.2.7.3),
 E. 

((t)) Resistance of new bridges to traffic loads (4.2.8.1),
((u)) Equivalent vertical loading for new earthworks and earth pressure effects (4.2.8.2),
((v)) Resistance of new structures over or adjacent to tracks (4.2.8.3),
((w)) Resistance of existing bridges and earthworks to traffic loads (4.2.8.4),
 F. 

((x)) Determination of immediate action, intervention, and alert limits (4.2.9.1),
((y)) The immediate action limit for track twist (4.2.9.2),
((z)) The immediate action limit for variation of track gauge (4.2.9.3),
((aa)) The immediate action limit for cant (4.2.9.4),
 G. 

((bb)) Usable length of platforms (4.2.10.1),
((cc)) Width and edge of platforms (4.2.10.2),
((dd)) End of platforms (4.2.10.3),
((ee)) Height of platforms (4.2.10.4),
((ff)) Offset of platforms (4.2.10.5),
 H. 

((gg)) Maximum pressure variation in tunnels (4.2.11.1),
((hh)) Noise and vibration limits and mitigation measures (4.2.11.2),
((ii)) Protection against electric shock (4.2.11.3),
((jj)) Safety in railway tunnels (4.2.11.4),
((kk)) Effect of crosswinds (4.2.11.5),
 I. 

((ll)) Distance markers (4.2.12.1),
 J. 

((mm)) Toilet discharge (4.2.13.2),
((nn)) Train external cleaning facilities (4.2.13.3),
((oo)) Water restocking (4.2.13.4),
((pp)) Refuelling (4.2.13.5),
((qq)) Electric shore supply (4.2.13.6).
 4.2.3.2.  (1) These requirements are described in the following paragraphs, together with any particular conditions that may be allowed in each case for the parameters and interfaces concerned.
 (2) All requirements of Chapter 4 of the present TSI are given for lines built with the standard European track gauge, as defined in paragraph 4.2.5.1 for lines complying with the present TSI.
 (3) The specifications for cant, rate of change of cant, cant deficiency, rate of change of cant deficiency and track twist are applicable to lines having a nominal track gauge of 1 435 mm. For a line having another nominal track gauge, the limits on these parameters shall be established in proportion to the nominal distance between the rails.
 (4) In case of multi-rail track, requirements of this TSI are to be applied separately to each pair of rails designed to be operated as separate track.
 (5) Requirements for lines representing specific cases, including lines built to another track gauge, are described under Section 7.6.
 (6) A short section of track with devices to allow transition between different nominal track gauges is permitted. The location and type of transitions shall be published in the Register of Infrastructure.
 (7) Requirements are described for the subsystem under normal service conditions. Consequences, if any, of the execution of works, which may require temporary exceptions as far as the subsystem performance is concerned, are dealt with in Section 4.4.
 (8) The performance levels of conventional trains can be enhanced by adopting specific systems, such as vehicle body tilting. Special conditions are permitted for running such trains, provided they do not entail restrictions for other trains not equipped with such systems. The Register of Infrastructure shall record if such special conditions apply. The special conditions shall be publically available.
 4.2.4.  4.2.4.1.  (1) The structure gauge shall be set on the basis of the gauge set out in Table 3 of this TSI.
 (2) Calculations of the structure gauge shall be done using the kinematic method in accordance with the requirements of Chapters 5, 7, 10 and the Annex C of EN 15273-3:2009.
 (3) Where overhead electrification is provided, the pantograph gauges are set out in the CR ENE TSI.
 4.2.4.2.  (1) The distance between track centres shall be set on the basis of the gauge set out in Table 3 of this TSI.
 (2) Where appropriate the minimum distance between track centres shall also take into account aerodynamic effects. The rules for taking account of aerodynamic effects, and the distance between track centres at which aerodynamic effects need to be taken into account, are an open point.
 (3) The minimum distance between track centres of a section of line shall be published in the Register of Infrastructure.
 4.2.4.3.  (1) 

((a)) the slope of the moving average profile over 10 km is less than or equal to 25 mm/m,
((b)) the maximum length of continuous 35 mm/m gradient does not exceed 6 km.
 (2) Gradients of tracks through passenger platforms shall not be more than 2,5 mm/m, where passenger carriages are intended to be regularly attached or detached.
 (3) Maximum gradients as steep as 12,5 mm/m are permitted for main tracks at the design phase.
 (4) For sections up to 3 km the maximum gradient of 20 mm/m is permitted.
 (5) For sections up to 0,5 km the maximum gradient of 35 mm/m is permitted in locations, where trains are not intended to stop and start in normal operation.
 (6) Gradients of tracks through passenger platforms shall not be more than 2,5 mm/m, where passenger carriages are intended to be regularly attached or detached.
 (7) No values are specified for upgraded lines, as gradients are determined by the original construction of the line concerned.
 (8) Gradients of stabling tracks intended for parking rolling stock shall not be more than 2,5 mm/m unless specific provision is made to prevent the rolling stock from running away.
 (9) Gradients and locations of changes in gradient shall be published in the Register of Infrastructure.
 (10) In the case of stabling tracks, gradients need to be published in the Register of Infrastructure only when they exceed 2,5 mm/m.
 4.2.4.4.  (1) The minimum design radius of horizontal curve shall be selected with regard to the local design speed of the curve.
 (2) For stabling tracks or sidings the minimum horizontal design curve radius shall not be less than 150 m.
 (3) The minimum radius of horizontal curve through platforms is set out in the PRM TSI.
 (4) Reverse curves (other than reverse curves in marshalling yards where wagons are shunted individually) with radii in the range from 150 m up to 300 m shall be designed in accordance to EN 13803-2:2006 Section 8.4 to prevent buffer locking.
 (5) The radius of the smallest horizontal curve of a section of line shall be published in the Register of Infrastructure.
 4.2.4.5.  (1) The radius of vertical curves (except for humps in marshalling yards) shall be at least 600 m on a crest or 900 m in a hollow.
 (2) For humps in marshalling yards the radius of vertical curves shall be at least 250 m on a crest or 300 m in a hollow.
 4.2.5.  4.2.5.1.  (1) European standard nominal track gauge shall be 1 435 mm.
 (2) The nominal track gauge for a line shall be published in the Register of Infrastructure.
 4.2.5.2.  (1) The design cant on tracks adjacent to station platforms shall not exceed 110 mm.
 (2) The highest cant on a section of line shall be published in the Register of Infrastructure.
 (3) The design cant shall be limited to 180 mm.
 (4) The design cant shall be limited to 160 mm.
 (5) 
D ≤ (R-50) / 1,5

where D is the cant in mm and R is the radius in m.
 4.2.5.3.  (1) The maximum rate of change of cant through a transition shall be 70 mm/s calculated at the maximum speed permitted for trains not fitted with a cant deficiency compensation system.
 (2) However, if the cant deficiency at the end of the transition is less than or equal to 150 mm and the rate of change of cant deficiency through the transition is less than or equal to 70 mm/s, it is permissible to increase the maximum rate of change of cant to 85 mm/s.
 4.2.5.4.  (1) The following specifications are applicable to interoperable lines having nominal track gauge as defined in paragraph 4.2.5.1 of the present TSI.
 4.2.5.4.1.  (1) The maximum cant deficiency at which trains are permitted to run shall take account of the acceptance criteria of the vehicles concerned, set out in HS and CR rolling stock TSIs.
 (2) 

((a)) 130 mm (or 0,85 m/s2 uncompensated lateral acceleration) for rolling stock approved to the Freight Wagons TSI (WAG TSI);
((b)) 150 mm (or 1,0 m/s2 uncompensated lateral acceleration) for rolling stock approved to Locomotives and Passenger RST TSI (LOC&PAS TSI).
 (3) It is permissible for trains specifically designed to travel with higher cant deficiency (multiple units with lower axle loads; trains equipped with a cant deficiency compensation system) to run with higher cant deficiency values, subject to a demonstration that this can be achieved safely.
 4.2.5.4.2.  (1) 

((a)) 120 mm for switches allowing turnout speeds of 30 km/h ≤ V ≤ 70 km/h,
((b)) 105 mm for switches allowing turnout speeds of 70 km/h < V ≤ 170 km/h,
((c)) 85 mm for switches allowing turnout speeds of 170 km/h < V ≤ 200 km/h.
 (2) An allowance of 20 mm on these values may be accepted for existing ranges of designs of switches.
 4.2.5.5.  (1) 
 — y = 3 mm
 if (TG – SR) ≥ 7 mm
 — y = TG – SR – 12,
 if 5 mm ≤ (TG – SR) < 7 mm
 — y = 2 mm
 if (TG – SR) < 5 mm
where TG is the track gauge and SR is the distance between the flange contact faces of the wheelset. No assessment of equivalent conicity is required for switches and crossings.
 4.2.5.5.1.  (1) 

Table 4
Equivalent conicity design limit values
Speed range(km/h) Equivalent conicity
S 1002, GV 1/40 EPS
v ≤ 60 Assessment not required Assessment not required
60 < v ≤ 160 0,25 0,3
160 < v ≤ 200 0,25 0,3 (2) 

((a)) S 1002 as defined in EN 13715:2006 Annex C with SR = 1 420 mm
((b)) S 1002 as defined in EN 13715:2006 Annex C with SR = 1 426 mm
((c)) GV 1/40 as defined in EN 13715:2006 Annex B with SR = 1 420 mm
((d)) GV 1/40 as defined in EN 13715:2006 Annex B with SR = 1 426 mm
((e)) EPS as defined in EN 13715:2006 Annex D with SR = 1 420 mm.
 4.2.5.5.2.  (1) Requirements for controlling equivalent conicity in service are an open point.
 (2) Once the initial design of the track system has been established, an important parameter for the control of equivalent conicity in service is track gauge. Therefore pending closure of the open point, the values for mean track gauge and the requirements for actions to be taken in case of ride instability set out below shall be respected.
 (3) 

Table 5
Minimum mean gauge in service on straight track and in curves of radius R > 10 000 m
Speed range(km/h) Mean gauge (mm) over 100 m
v ≤ 60 assessment not required
60 < v ≤ 160 1 430
160 < v ≤ 200 1 430 (4) If ride instability is reported on a track respecting the requirement of Section 4.2.5.5 for rolling stock having wheelsets meeting the requirements for equivalent conicity set out in the HS and CR rolling stock TSIs, a joint investigation by the railway undertaking and the infrastructure manager is to be undertaken to determine the reason.
 4.2.5.6.  (1) 

((a)) a lateral slope on the side of the railhead angled to between vertical and 1/16 with reference to the vertical axis of the railhead;
((b)) the vertical distance between the top of this lateral slope and the top of the rail shall be less than 15 mm;
((c)) a radius of at least 12 mm at the gauge corner;
((d)) the horizontal distance between the crown of the rail and the tangent point shall be between 31 and 37 mm.

Figure 1 4.2.5.7.  4.2.5.7.1.  (1) The rail shall be inclined towards the centre of the track.
 (2) The rail inclination for a given route shall be selected from the range 1/20 to 1/40.
 (3) The value selected shall be declared in the Register of Infrastructure.
 4.2.5.7.2.  (1) The rail in switches and crossings shall be designed to be either vertical or inclined.
 (2) If the rail is inclined, the designed inclination in switches and crossings shall be the same as for plain line.
 (3) The inclination can be given by the shape of the active part of the railhead profile.
 (4) For short sections of plain line between switches and crossings without inclination, the laying of rails without inclination is permitted.
 (5) A short transition from inclined rail to vertical rail is permitted.
 4.2.5.8.  (1) Requirements for track stiffness as a complete system are an open point.
 4.2.6.  4.2.6.1.  (1) All movable parts of switches and crossings shall be equipped with a means of locking, except in marshalling yards and other tracks used only for shunting.
 (2) All movable parts of switches and crossings shall be equipped with a means of locking where the maximum speed is more than 40 km/h, unless used exclusively in the trailing direction.
 4.2.6.2.  (1)  Figure 2 

 (2) 

((a)) Maximum value of free wheel passage in switches: 1 380 mm.
This value can be increased if the infrastructure manager demonstrates that the actuation and locking system of the switch is able to resist the lateral impact forces of a wheelset.
((b)) Minimum value of fixed nose protection for common crossings: 1 392 mm.
This value is measured 14 mm below the running surface, and on the theoretical reference line, at an appropriate distance back from the actual point (RP) of the nose as indicated in Figure 2. For crossings with point retraction, this value can be reduced. In this case the infrastructure manager shall demonstrate that the point retraction is sufficient to guarantee that the wheel will not hit the nose at the actual point (RP).
((c)) Maximum value of free wheel passage at crossing nose: 1 356 mm.
((d)) Maximum value of free wheel passage at check rail/wing rail entry: 1 380 mm.
((e)) Minimum flangeway width: 38 mm.
((f)) Minimum flangeway depth: 40 mm.
((g)) Maximum excess height of check rail: 70 mm.
 (3) All relevant requirements for switches and crossings are also apllicable to other technical solutions using switch rails, for example side modifiers used in multi-rail track.
 4.2.6.3.  (1) The design value of the maximum unguided length shall be equivalent to 1 in 9 (tgα = 0,11, α = 6°20’) obtuse crossing with a minimum 45 mm raised check rail and associated with a minimum wheel diameter of 330 mm on straight through routes.
 4.2.7.  4.2.7.1.  (1) 

((a)) the axle load according to the performance parameters for the TSI categories of line as defined in Table 3;
((b)) the maximum dynamic wheel force exerted by a wheelset on the track. The HS and CR rolling stock TSIs define a limit on the maximum dynamic wheel force for defined test conditions. The resistance of the track to vertical loads shall be consistent with these values;
((c)) the maximum quasi static wheel force exerted by a wheelset on the track. The HS and CR rolling stock TSIs define a limit on the maximum quasi static wheel force for defined test conditions. The resistance of the track to vertical loads shall be consistent with these values.
 4.2.7.2.  4.2.7.2.1.  (1) The track, including switches and crossings, shall be designed to withstand longitudinal forces arising from braking. The HS and CR rolling stock TSIs define limits on deceleration which shall be used to determine the longitudinal forces arising from braking.
 (2) Track shall also be designed to withstand the longitudinal thermal forces arising from temperature changes in the rail and to minimise the likelihood of track buckling.
 4.2.7.2.2.  (1) Track shall be designed to be compatible with the use of magnetic track brakes for emergency braking.
 (2) The compatibility (or otherwise) of the design of track adopted with the use of braking systems independent of wheel-rail adhesion conditions for service braking and for emergency braking shall be published in the Register of Infrastructure. Braking systems independent of wheel-rail adhesion conditions include magnetic track brakes and eddy current track brakes.
 (3) Where the track is compatible with the use of braking systems independent of adhesion conditions, the Register of Infrastructure shall state any limitation on the use of the braking systems on which compatibility depends, taking into account local climatic conditions and the expected number of repeated brake applications at a given location.
 4.2.7.3.  (1) 

((a)) the maximum total dynamic lateral force exerted by a wheelset on the track. The HS and CR rolling stock TSIs define a limit on the lateral forces excerted by a wheel set on the track. The lateral resistance of the track shall be consistent with these values,
((b)) the quasi static guiding force exerted by a wheelset on the track. The HS and CR rolling stock TSIs define a limit on the quasi static guiding force Yqst for defined radii and test conditions. The lateral resistance of the track shall be consistent with these values.
 4.2.8.  (1) The requirements of EN 1991-2:2003 and Annex A2 to EN 1990:2002 issued as EN 1990:2002/A1:2005 specified in this chapter of the TSI are to be applied in accordance with the corresponding clauses in the national annexes to these standards if they exist.
 4.2.8.1.  4.2.8.1.1.  (1) 

((a)) load model 71, as set out in EN 1991-2:2003 paragraph 6.3.2 (2)P;
((b)) in addition, for continuous bridges, load model SW/0, as set out in EN 1991-2:2003 paragraph 6.3.3 (3)P.
 (2) The load models shall be multiplied by the factor alpha (α) as set out in EN 1991-2:2003 paragraphs 6.3.2 (3)P and 6.3.3 (5)P.
 (3) 

Table 6
Factor alpha(α ) for the design of new structures
Types of line or TSI categories of line Minimum factor alpha (α)
IV 1,1
V 1,0
VI 1,1
VII-P 0,83
VII-F, VII-M 0,91 (4) The load effects from the load models shall be enhanced by the dynamic factor phi (Φ) as set out in EN 1991-2:2003 paragraphs 6.4.3 (1)P and 6.4.5.2 (2).
 4.2.8.1.2.  (1) Where the track on a bridge is curved over the whole or part of the length of the bridge, the centrifugal force shall be taken into account in the design of structures as set out in EN 1991-2:2003 paragraphs 6.5.1 (2), (4)P, (7).
 4.2.8.1.3.  (1) The nosing force shall be taken into account in the design of structures as set out in EN 1991-2:2003 Section 6.5.2.
 4.2.8.1.4.  (1) Traction and braking forces shall be taken into account in the design of structures as set out in EN 1991-2:2003 paragraphs 6.5.3 (2)P, (4), (5) and (6). The direction of the traction and braking forces shall take account of the permitted directions of travel on each track.
 4.2.8.1.5.  (1) The maximum total design track twist due to rail traffic actions shall not exceed the values set out in clause A2.4.4.2.2(3)P in Annex A2 to EN 1990:2002 issued as EN 1990:2002/A1:2005. The total design track twist comprises any twist which may be present in the track when the bridge is not subject to rail traffic actions, plus the track twist due to the total deformation of the bridge resulting from rail traffic actions.
 4.2.8.2.  (1) Earthworks shall be designed to support vertical loads in accordance with the Load Model 71, as set out in EN 1991-2:2003 paragraph 6.3.6.4.
 (2) Load model 71 shall be multiplied by the factor alpha (a) as set out in EN 1991-2:2003 paragraphs 6.3.2 (3)P. The value of a shall be equal to or greater than the values set out in Table 6.
 4.2.8.3.  (1) Aerodynamic actions from passing trains shall be taken into account as set out in EN 1991-2:2003 paragraph 6.6.
 4.2.8.4.  (1) Bridges and earthworks shall be brought to a specified level of interoperability according to the TSI category of line as defined in Section 4.2.1.
 (2) The minimum capability requirements for structures for each TSI category of line are given in Annex E. The values represent the minimum target level that structures must be capable of for the line to be declared interoperable.
 (3) 

((a)) Where an existing structure is replaced by a new structure then the new structure shall be in accordance with the requirements of Chapter 4.2.8.1 or 4.2.8.2.
((b)) If the minimum capability of the existing structures expressed by the published EN line category in combination with the permitted speed satisfies the requirements in Annex E then the existing structures satisfy the relevant interoperability requirements.
((c)) Where the capability of an existing structure does not satisfy the requirements in Annex E and works (e.g. strengthening) are being carried out to raise the capability of the structure to meet the requirements of this TSI (and the structure is not to be replaced by a new structure) then the structure shall be brought into conformity with the requirements in Annex E.
 (4) For the British network, in clauses (2) and (3) above the EN line category may be replaced by route availability (RA) number (delivered in accordance with the national technical rule notified for this purpose) and consequently reference to Annex E are replaced by reference to Annex C.
 4.2.9.  4.2.9.1.  (1) 

((a)) lateral alignment — standard deviations (alert limit only),
((b)) longitudinal level — standard deviations (alert limit only),
((c)) lateral alignment — isolated defects — mean to peak values,
((d)) longitudinal level — isolated defects — mean to peak values,
((e)) track twist — isolated defects — zero to peak value subject to the immediate action limits set out in the Section 4.2.9.2,
((f)) variation of track gauge — isolated defects — nominal track gauge to peak value subject to the immediate action limits set out in the Section 4.2.9.3,
((g)) mean track gauge over any 100 m length — nominal track gauge to mean value, subject to the immediate action limits set out in the Section 4.2.5.5.2,
((h)) cant — design to peak value subject to the immediate action limits set out in Section 4.2.9.4.
 (2) The measurement conditions for these parameters are set out in Chapter 5 of EN 13848-1:2003 +A1:2008.
 (3) When determining these limits, the infrastructure manager shall take into account the track quality limits used as the basis for vehicle acceptance. Requirements for vehicle acceptance are set out in the CR and HS rolling stock TSIs.
 (4) The immediate action, intervention and alert limits adopted by the infrastructure manager shall be recorded in the maintenance plan required by Section 4.5 of this TSI.
 4.2.9.2.  (1) The immediate action limit for track twist as an isolated defect is given as a zero to peak value. Track twist is defined as the algebraic difference between two cross levels taken at a defined distance apart, usually expressed as a gradient between the two points at which the cross level is measured. The cross level is measured at the nominal centres of the railheads.
 (2) 
Limit twist = (20/l + 3)


((a)) where l is the measurement base (in m), with 1,3 m k ≤ l ≤ 20 m,
((b)) with a maximum value of 7 mm/m.

Figure 3 (3) (The infrastructure manager shall set out in the maintenance plan the basis on which it will measure the track in order to check compliance with this requirement. The basis of measurement shall include at least one measurement base between 2 and 5 m.
 (4) 
Figure 4 4.2.9.3. 
The immediate action limits for variation of track gauge are set out in Table 7.


Speed(km/h) Dimensions(mm)
 Nominal track gauge to peak value
 Minimum track gauge Maximum track gauge
V ≤ 80 -9 35
80 < V ≤ 120 -9 35
120 < V ≤ 160 -8 35
160 < V ≤ 200 -7 28
 4.2.9.4.  (1) The in service cant shall be maintained within +/- 20 mm of the design cant, but the maximum cant permitted in service is 190 mm.
 (2) The in service cant shall be maintained within +/- 20 mm of the design cant, but the maximum cant permitted in service is 170 mm.
 4.2.10.  (1) The requirements of this paragraph are only applicable to the passenger platforms where trains complying with the HS and CR rolling stock TSIs are intended to stop on normal service.
 4.2.10.1.  (1) The platform length shall be sufficient to accommodate the longest interoperable train intended to stop at the platform in normal service. When determining the length of trains intended to stop at the platform, consideration shall be given to both the current service requirements and the reasonably foreseeable service requirements at least ten years following the bringing into service of the platform.
 (2) It is permissible to build only the length of platform required for the current service requirement provided passive provision is made for the reasonably foreseeable future service requirements.
 (3) The usable length of a platform shall be declared in the Register of Infrastructure.
 4.2.10.2.  (1) The PRM TSI sets out the requirements for platform width and edge of the platform.
 4.2.10.3.  (1) The PRM TSI sets out the requirements for the end of the platform.
 4.2.10.4.  (1) The PRM TSI sets out the requirements for platform height.
 4.2.10.5.  (1) The PRM TSI sets out the requirements for platform offset.
 4.2.11.  4.2.11.1.  (1) The maximum pressure variation in tunnels and underground structures along the outside of any train complying with the HS and CR rolling stock TSIs intended to run in the specific tunnel at speeds of greater than 190 km/h shall not exceed 10 kPa during the time taken for the train to pass through the tunnel, at the maximum permitted speed.
 4.2.11.2.  (1) Noise limits and mitigation measures are an open point.
 (2) Vibration limits and mitigation measures are an open point.
 4.2.11.3.  (1) The requirements for protection against electric shock from the traction current system are ensured by the provisions set out in CR ENE TSI relating to the protective provisions of overhead contact line systems.
 4.2.11.4.  (1) Requirements for the safety in railway tunnels are set out in the SRT TSI.
 4.2.11.5.  (1) Requirements for mitigating the effect of crosswinds are an open point.
 4.2.12.  4.2.12.1.  (1) Distance markers shall be provided at regular intervals along the track.
 (2) The nominal interval between distance markers shall be stated in the Register of Infrastructure.
 4.2.13.  4.2.13.1.  (1) This Section 4.2.13 sets out the infrastructure elements of the maintenance subsystem required for servicing trains.
 (2) The location and type of fixed installations for servicing trains shall be published in the Register of Infrastructure.
 4.2.13.2.  (1) Fixed installations for toilet discharge shall be compatible with the characteristics of the retention toilet system specified in the HS and CR rolling stock TSIs.
 4.2.13.3.  (1) 

((a)) 1 000 to 3 500 mm for a single-deck train,
((b)) 500 to 4 300 mm for double-deck trains.
 (2) The washing plant shall be designed so that trains can to be driven through it at any speed between 2 km/h and 5 km/h.
 4.2.13.4.  (1) Fixed equipment for water restocking shall be compatible with the characteristics of the water system specified in the HS and CR rolling stock TSIs.
 (2) Fixed equipment for water supply on the interoperable network shall be supplied with drinking water meeting the requirements of the Council Directive 98/83/EC.
 (3) The equipment’s mode of operation shall ensure that water delivered to the rolling stock complies with the quality specified by Directive 98/83/EC.
 4.2.13.5.  (1) Refuelling equipment shall be compatible with the characteristics of the fuel system specified in the CR rolling stock TSI.
 4.2.13.6.  (1) Where provided, electrical shore supply shall be by means of one or more of the power supply systems specified in the HS and CR rolling stock TSIs.
 4.3. 
From the standpoint of technical compatibility, the interfaces of the infrastructure subsystem with the other subsystems are like described in the following paragraphs.
 4.3.1. 

Interface Reference conventional rail infrastructure TSI Reference conventional rail locomotives and passenger RST TSI
Track gauge  4.2.5.1 Nominal track gauge
 4.2.5.6 Railhead profile for plain line
 4.2.6.2 In-service geometry of switches and crossings
  4.2.3.5.2.1 Mechanical and geometrical characteristics of Wheelset
 4.2.3.5.2.2 Mechanical and geometrical characteristics of Wheels

Gauges  4.2.4.1 Structure gauge
 4.2.4.2 Distance between track centres
 4.2.4.5 Minimum radius of vertical curve
  4.2.3.1. Gauging

Axle load and axle spacing  4.2.7.1 Track resistance to vertical loads
 4.2.8.1 Resistance of new bridges to traffic loads
 4.2.8.2 Equivalent vertical loading for new earthworks and earth pressure effects
 4.2.8.4 Resistance of existing bridges and earthworks to traffic loads
  4.2.3.2 Axle load and wheel load

Running characteristics  4.2.7.1 Track resistance to vertical loads
 4.2.7.3 Lateral track resistance
 4.2.8.1.3 Nosing forces
  4.2.3.4.2.1 Limit values for running safely
 4.2.3.4.2.2 Track loading limit values

Equivalent conicity  4.2.5.5 Equivalent conicity
  4.2.3.4.3 Equivalent conicity

Longitudinal actions  4.2.7.2 Longitudinal track resistance
 4.2.8.1.4 Actions due to traction and braking (logitudinal loads)
  4.2.4.5 Braking performance

Minimum curve radius  4.2.4.4 Minimum radius of horizontal curve
  4.2.3.6 Minimum curve radius

Horizontal curve radius  4.2.5.4 Cant deficiency
  4.2.3.4.2.1 Limit values for running safety

Vertical curve acceleration  4.2.4.5 Minimum radius of vertical curve
  4.2.3.1 Gauging

Aerodynamic effect  4.2.4.2 Distance between track centres
 4.2.8.3 Resistance of new structures over or adjacent to tracks
 4.2.11.1 Maximum pressure variations in tunnels
  4.2.6.2.1 Slipstream effects on assengers on platforms
 4.2.6.2.2 Slipstream effects on workers on the track side
 4.2.6.2.3 Head pressure pulse
 4.2.6.2.4 Maximum pressure variations in tunnels

Crosswind  4.2.11.5 Effect of crosswinds
  4.2.6.2.5 Crosswind

Installations for servicing trains  4.2.13.2 Toilet discharge
 4.2.13.3 Train external cleaning facilities
 4.2.13.4 Water restocking
 4.2.13.5 Refuelling
 4.2.13.6 Electric shore supply
  4.2.11.3 Toilet discharge system
 4.2.11.2.2 Exterior cleaning through a washing plant
 4.2.11.4 Water refilling equipment
 4.2.11.5 Interface for water refilling
 4.2.11.7 Refuelling equipment
 4.2.11.6 Special requirements for stabling of trains



Interface Reference conventional rail infrastructure TSI Reference conventional rail freight wagons TSI
Track gauge  4.2.5.1 Nominal track gauge
 4.2.5.6 Railhead profile for plain line
 4.2.6.2 In-service geometry of switches and crossings
  4.2.3.4 Vehicle dynamic behaviour

Gauges  4.2.4.1 Structure gauge
 4.2.4.2 Distance between track centres
 4.2.4.5 Minimum radius of vertical curve
  4.2.3.1 Kinematic gauge

Axle load and axle spacing  4.2.7.1 Track resistance to vertical loads
 4.2.7.3 Lateral track resistance
 4.2.8.1 Resistance of new bridges to traffic loads
 4.2.8.2 Equivalent vertical loading for new earthworks and earth pressure effects
 4.2.8.4 Resistance of existing bridges and earthworks to traffic loads
  4.2.3.2 Static axle load and linear load

Running characteristics  4.2.7.1 Track resistance to vertical loads
 4.2.7.3 Lateral track resistance (b)
  4.2.3.4 Vehicle dynamic behaviour

Longitudinal actions  4.2.7.2 Longitudinal track resistance
 4.2.8.1.4 Actions due to traction and braking (logitudinal loads)
  4.2.4.1 Braking performance

Minimum curve radius  4.2.4.4 Minimum radius of horizontal curve
  4.2.2.1. Interface (e. g. coupling) between vehicles, between sets of vehicles and between trains

Horizontal curve radius  4.2.5.4 Cant deficiency
  4.2.3.5. Longitudinal compressive forces

Vertical curve acceleration  4.2.4.5 Minimum radius of vertical curve
  4.2.3.1 Kinematic gauge

Aerodynamic effect  4.2.4.2 Distance between track centres
 4.2.8.3 Resistance of new structures over or adjacent to tracks
 4.2.11.1 Maximum pressure variations in tunnels
  4.2.6.2 Aerodynamic effects

Crosswind  4.2.11.5 Effect of crosswinds
  4.2.6.3 Cross winds

 4.3.2. 

Interface Reference conventional rail infrastructure TSI Reference conventional rail energy TSI
Gauges  4.2.4.1 Structure gauge
  4.2.14 Pantograph gauge

Protection against electric shock  4.2.11.3 Protection against electric shock
  4.7.3 Protective provisions of overhead contact line system
 4.7.4 Protective provisions of current return circuit

 4.3.3. 

Interface Reference conventional rail infrastructure TSI Reference conventional rail control command and signalling TSI
Structure gauge set for CCS installations  4.2.4.1 Structure gauge
  4.2.5 ETCS and EIRENE air gap interfaces
 4.2.16 Visibility of track-side control-command objects

Use of eddy current brakes  4.2.7.2 Longitudinal track resistance
 Annex A, Appendix 1, Section 5.2: Use of electric/magnetic brakes
 4.3.4. 

Interface Reference conventional rail infrastructure TSI Reference conventional rail operation and traffic management TSI
Use of eddy current brakes  4.2.7.2 Longitudinal track resistance
  4.2.2.6.2 Brake performance

Operating rules  4.4 Operating rules
  4.2.1.2.2.2 Modified elements
 4.2.3.6 Degraded operation

 4.4.  4.4.1.  (1) During pre-planned works, it may be necessary to temporarily suspend the specifications of the infrastructure subsystem and its interoperability constituents defined in Chapters 4 and 5 of this TSI. Specific operational provisions are set out in the CR Traffic Operation and Management TSI.
 4.4.2.  (1) Events that affect the normal operation of a line may occur. The operational rules for dealing with such events are set out in the CR Traffic Operation and Management TSI.
 4.4.3.  (1) The infrastructure manager shall define the means for protecting workers against aerodynamic effects.
 (2) For the trains complying with the HS and CR rolling stock TSIs, the infrastructure manager shall take into account the actual speed of the trains and the limit value of the aerodynamic effects given by the HS and CR rolling stock TSIs.
 4.5.  4.5.1.  (1) 

((a)) a set of values for immediate action limits,
((b)) the measures taken (speed restriction, repair time) when prescribed values are exceeded,

related to the following elements:


i.. requirements for controlling equivalent conicity in service,
ii.. in service geometry of switches and crossings,
iii.. track geometric quality and limits on isolated defects,
iv.. platform edge as required by the ‘People with reduced mobility’ TSI.
 4.5.2.  (1) 

((a)) a set of values for intervention limits and alert limits,
((b)) a statement about the methods, professional competences of staff and personal protective safety equipment necessary to be used,
((c)) the rules to be applied for the protection of people working on or near the track,
((d)) the means used to check that in-service values are respected.
 4.6.  (1) The professional competences required for the staff maintaining the infrastructure subsystem shall be detailed in the maintenance plan (see Section 4.5.2).
 4.7.  (1) Health and safety conditions are dealt with compliance with requirements sections: 4.2.11.1 (Maximum pressure variation in tunnels), 4.2.11.2 (Noise and vibration limits and mitigation measures), 4.2.11.3 (Protection against electric shock), 4.2.10 (Platforms), 4.2.11.4 (Safety in railway tunnels), 4.2.13 (Fixed installations for servicing trains) and 4.4 (Operating rules).
 4.8.  (1) In accordance with Article 35 of Directive 2008/57/EC, the Register of Infrastructure shall indicate the main features of the infrastructure subsystem.
 (2) Annex D of this TSI indicates which information concerning the infrastructure subsystem shall be included in the Register of Infrastructure. The information to be included in the Register of Infrastructure required for other subsystems are set in the TSIs concerned.
 5.  5.1.  (1) The requirements of Section 5.3 are based on a traditional design of ballasted track with Vignole (flat-bottom) rail on concrete or wooden sleepers and fastening providing resistance to longitudinal slip by bearing on the rail foot.
 (2) Components and subassemblies used for the construction of other designs of track are not considered to be interoperability constituents.
 5.2.  (1) 

((a)) the rail (5.3.1),
((b)) the rail fastening systems (5.3.2),
((c)) track sleepers (5.3.3).
 (2) The following sections describe the specifications applicable to each of these constituents.
 (3) Rails, fastenings and sleepers used for short length of track for specific purposes, for example in switches and crossings, at expansion devices, transition slabs and special structures, are not considered to be interoperability constituents.
 5.3.  5.3.1.  (1) 

((a)) railhead profile,
((b)) moment of inertia of the rail cross section,
((c)) rail hardness.
 5.3.1.1.  (1) The railhead profile shall fulfil the requirements of Section 4.2.5.6 ‘Railhead profile for plain line’.
 (2) The railhead profile shall allow requirements of Section 4.2.5.5.1 for ‘Design values for equivalent conicity’ to be met when used with a specified range of track gauge and rail inclinations consistent with the requirements of this TSI.
 5.3.1.2.  (1) The moment of inertia is relevant to the requirements of Section 4.2.7 ‘Track resistance to applied loads’.
 (2) The calculated value of moment of inertia (I) of designed rail section about the principal horizontal axis through the centre of gravity shall be at least 1 600 cm4.
 5.3.1.3.  (1) The rail hardness is relevant to the requirements of Section 4.2.5.6 ‘Railhead profile for plain line’.
 (2) The rail hardness measured at the crown of the railhead shall be at least 200 HBW.
 5.3.2.  (1) The rail fastening system is relevant to the requirements of Section 4.2.7.2 for ‘Longitudinal track resistance’ and Section 4.2.7.3 ‘Lateral track resistance’ and Section 4.2.7.1 for ‘Track resistance to vertical loads’.
 (2) 

((a)) the longitudinal force required to cause the rail to begin to slip (i.e. move in an inelastic way) through a single rail fastening assembly shall be at least 7 kN,
((b)) the rail fastening shall resist application of 3 000 000 cycles of the typical load applied in a sharp curve, such that the performance of the fastening in terms of clamping force and longitudinal restraint is not degraded by more than 20 % and vertical stiffness is not degraded by more than 25 %. The typical load shall be appropriate to:

i.. the maximum axle load the rail fastening system is designed to accommodate,
ii.. the combination of rail, rail inclination, rail pad and type of sleepers with which the fastening system may be used.
 5.3.3.  (1) Track sleepers shall be designed such that when they are used with a specified rail and rail fastening system they will have properties that are consistent with the requirements of 4.2.5.1 for ‘Nominal track gauge’, Section 4.2.5.5.2 for ‘Requirements for controlling equivalent conicity in service (Table 5: Minimum mean gauge in service on straight track and in curves of radius R > 10 000 m)’, Section 4.2.5.7 for ‘Rail inclination’ and Section 4.2.7 for ‘Track resistance to applied loads’.
 6.  6.1.  6.1.1.  (1) The conformity assessment procedure of interoperability constituents as defined in Chapter 5 of this TSI shall be carried out by application of the relevant modules.
 6.1.2.  (1) 
(a) CA‘Internal production control’(b) CB‘EC type examination’(c) CD‘Conformity to type based on quality management system of the production process’(d) CF‘Conformity to type based on product verification’(e) CH‘Conformity based on full quality management system’
 (2) 

Table 13
Modules for conformity assessment to be applied for interoperability constituents
Procedures Rail Rail fastening system Track sleepers
Placed on the EU market before entry into force of this TSI CA or CH CA or CH
Placed on the EU market after entry into force of this TSI CB+CD orCB+CF orCH (3) In the case of products placed on the market before the publication of this TSI, the type is considered to have been approved and therefore EC type examination (module CB) is not necessary, provided that the manufacturer demonstrates that tests and verification of interoperability constituents have been considered successful for previous applications under comparable conditions and are in conformity with the requirements of this TSI. In this case these assessments shall remain valid in the new application. If it is not possible to demonstrate that the solution is positively proven in the past, the procedure for interoperability constituents placed on the EU market after publication of this TSI applies.
 (4) The conformity assessment of interoperability constituents shall cover the phases and characteristics as indicated in Table 20 of Annex A to this TSI.
 6.1.3.  (1) If an innovative solution is proposed for an interoperability constituent as defined in Section 5.2, the manufacturer or his authorised representative established within the Community shall state the deviations from the relevant clause of this TSI and submit them to the Commission for analysis.
 (2) In case the analysis results in a favourable opinion, the appropriate functional and interface specifications for the constituent and the assessment method will be developed under the authorisation of the Commission.
 (3) The appropriate functional and interface specifications and the assessment methods so produced shall be incorporated in the TSI by the revision process.
 (4) By the notification of a decision of the Commission, taken in accordance with Article 29 of the Directive, the innovative solution may be permitted to be used before being incorporated into the TSI by the revision process.
 6.1.4.  6.1.4.1.  (1) Article 13(3) of Directive 2008/57/EC, states ‘Where the interoperability constituents are the subject of other Community Directives covering other aspects, the EC declaration of conformity or suitability for use shall, in such instances, state that the interoperability constituents also meet the requirements of those other Directives.’
 (2) According to Annex IV (3) of Directive 2008/57/EC, the EC declaration of conformity shall be accompanied by the statement setting out the condition of use.
 6.1.4.2.  (1) The EC declaration of conformity shall be accompanied by statement setting out the range of track gauge and rail inclination for which the railhead profile allows the requirements of Section 4.2.5.5.1 to be met.
 6.1.4.3.  (1) 

((a)) the combination of rail, rail inclination, rail pad and type of sleepers with which the fastening system may be used
((b)) the maximum axle load the rail fastening system is designed to accommodate.
 6.1.4.4.  (1) The EC declaration of conformity shall be accompanied by statement setting out the combination of rail, rail inclination and type of rail fastening system with which the sleeper may be used.
 6.2.  6.2.1.  (1) At the request of the applicant, the notified body carries out the EC verification of the infrastructure subsystem in accordance with Article 18 and Annex VI of Directive 2008/57/EC and in accordance with the provisions of the relevant modules.
 (2) If the applicant demonstrates that tests or verifications of an infrastructure subsystem have been successful for previous applications of a design in similar circumstances, the notified body shall take these tests and verifications into account for the EC verification.
 (3) The EC verification of the infrastructure subsystem shall cover the phases and characteristics indicated Table 21 in Annex B to this TSI. Particular assessment procedures for specific basic parameters of Infrastructure subsystem are included in Section 6.2.4.
 (4) The applicant shall draw up the EC declaration of verification for the infrastructure subsystem in accordance with Article 18 of and Annex V to Directive 2008/57/EC.
 6.2.2.  (1) 

((a)) Module SG: EC verification based on unit verification, or
((b)) Module SH1: EC verification based on full quality management system plus design examination.
 6.2.2.1.  (1) In the case where EC verification is most effectively undertaken by using information collected by the infrastructure manager, contracting entity or the main contractors involved (for example data obtained using track recording vehicle or other measuring devices), the notified body shall take this information into account to assess conformity.
 6.2.2.2.  (1) The SH1 module may be chosen only where the activities contributing to the proposed subsystem to be verified (design, manufacturing, assembling, installation) are subject to a quality management system for design, production, final product inspection and testing, approved and surveyed by a notified body.
 6.2.3.  (1) If the subsystem includes an innovative solution as mentioned in Section 4.1, the applicant shall state the deviation from the relevant clauses of the TSI and submit them to the Commission.
 (2) In case of favourable opinion, the appropriate functional and interface specifications, and the assessment methods for this solution will be developed.
 (3) The appropriate functional and interface specifications and the assessment methods so produced shall then be incorporated in the TSI by the revision process.
 (4) By the notification of a decision of the Commission, taken in accordance with Article 29 of the Directive, the innovative solution may be permitted to be used before being incorporated into the TSI by the revision process.
 6.2.4.  6.2.4.1.  (1) Assessment of structure gauge is to be made using the results of calculations made by the infrastructure manager or the contracting entity on the basis of Chapters 5, 7, 10 and Annex C of EN 15273-3:2009.
 6.2.4.2.  (1) Assessment of the distance between track centres is to be made using the results of calculations made by the infrastructure manager or the contracting entity on the basis of Chapter 9 of EN 15273-3:2009.
 6.2.4.3.  (1) Section 4.2.5.4.1 states that ‘It is permissible for trains specifically designed to travel with higher cant deficiency (multiple units with lower axle loads; trains equipped with a cant deficiency compensation system) to run with higher cant deficiency values, subject to a demonstration that this can be achieved safely’.
 (2) The demonstration of safety is not subject to a notified body verification.
 6.2.4.4.  (1) Assessment of design values for equivalent conicity is to be made using the results of calculations made by the infrastructure manager or the contracting entity on the basis of EN 15302:2008.
 6.2.4.5.  (1) The measurement method for track gauge is given in Section 4.2.1 of EN 13848-1:2003 + A1:2008.
 6.2.4.6.  (1) Assessment of maximum pressure variation in the tunnel (10 kPa criterion) is to be made using the results of calculations made by the infrastructure manager or the contracting entity on the basis of all operational conditions with all the trains complying with the high speed and conventional rail rolling stock TSI and intended to run at speeds of greater than 190 km/h in the specific tunnel to be assessed.
 (2) The input parameters to be used are to be such that the reference characteristic pressure signature of the trains set out in the HS rolling stock TSI is fulfilled.
 (3) 

((a)) 12 m2 for vehicles designed for GC reference kinematic profile,
((b)) 11 m2 for vehicles designed for GB reference kinematic profile,
((c)) 10 m2 for vehicles designed for smaller kinematic profiles.
 (4) The assessment may take into account the construction features which reduce the pressure variation (tunnel entrance shape, shafts, etc.) if any, as well as the tunnel length.
 6.2.4.7.  (1) Assessment of switches and crossings at the design phase is required to verify that the design values used are consistent with the in-service limiting values set out in Section 4.2.6.2.
 (2) Assessment of fixed obtuse crossings at the design phase is also required to verify that the requirements for unguided length in Section 4.2.6.3 are met.
 6.2.4.8.  (1) Assessment of structures is to be made by only checking the traffic loads used for design against the minimum requirements of 4.2.8.1, 4.2.8.2 and 4.2.8.3. The notified body is not required to review the design nor carry out any calculations. When reviewing the value of alpha used in the design according to 4.2.8.1 and 4.2.8.2 it is only necessary to check that the value of alpha satisfies Table 6.
 6.2.4.9.  (1) Assessment of existing structures is to be made by checking that the values of EN line categories (and if relevant locomotive classes) in combination with the permitted speed published by the infrastructure manager for the lines containing the structures satisfy the requirements of Annex E of this TSI.
 6.2.4.10.  (1) Assessment of fixed installations for servicing trains is in the responsibility of the Member State concerned.
 6.2.5.  6.2.5.1.  (1) 

((a)) The requirements for track components, defined in Chapter 5 ‘Interoperability constituents’ for the rail (5.3.1), rail fastening systems (5.3.2) and sleepers (5.3.3) interoperability constituents are met;
((b)) There are at least 1 500 rail fastenings per rail, per kilometre length.
 6.2.5.2.  (1) 

((a)) The requirements defined in Chapter 5 ‘Interoperability constituents’ for the rail (5.3.1) are met for the plain rails in the switches and crossings and corresponding switch rails and crossings are used;
((b)) The requirements defined in Chapter 5 ‘Interoperability constituents’ for rail fastening systems (5.3.2) are met by all fastenings, other than fastenings used at movable parts of switches and crossings;
((c)) There are at least equivalent to 1 500 rail fastenings per rail, per kilometre length averaged over the length of the switches and crossings.
 6.3.  (1) Section 7.4 permits a line to be put into service at a lower speed than the ultimate intended speed. This section sets out requirements for EC verification in this circumstance.
 (2) 
Conformity should be assessed at the intended ultimate speed; however it is permissible to assess speed dependant characteristics at the lower speed at the time of placing in service.
 (3) The conformity of the other characteristics for the intended speed of the route remains valid.
 (4) To declare the interoperability at this intended speed, it is only necessary to assess the conformity of the characteristics temporarily not respected, when they are brought up to the required level.
 6.4.  (1) Section 4.5 requires the infrastructure manager to have for each conventional line a maintenance plan for the infrastructure subsystem.
 (2) The notified body shall confirm that the maintenance file exists and contains the items listed in Section 4.5.1. The notified body is not responsible for assessing the suitability of the detailed requirements set out in the maintenance file.
 (3) The notified body shall include copy of the maintenance file required by Section 4.5.1 of this TSI in the technical file referred to in Article 18(3) of Directive 2008/57/EC.
 6.5.  (1) Section 4.8 requires that the Register of Infrastructure shall indicate the main features of the infrastructure subsystem. The notified body is responsible for assessing that those features have been prepared for the Register of Infrastructure.
 6.6.  6.6.1.  (1) 

((a)) the conformity of the subsystem has been checked against the requirements of Chapter 4 and in relation to Chapters 6.2 to 7 (except 7.6. ‘Specific cases’) of this TSI by the notified body. Furthermore the conformity of the ICs to Chapter 5 and 6.1 does not apply, and
((b)) the interoperability constituents, which are not covered by the relevant EC declaration of conformity and/or suitability for use, have been used in a subsystem already approved and put in service in at least one of the Member State before the entry in force of this TSI.
 (2) EC declarations of conformity and/or suitability for use shall not be drawn up for the interoperability constituents assessed in this manner.
 6.6.2.  (1) The EC certificate of verification of the subsystem shall indicate clearly which interoperability constituents have been assessed by the notified body as part of the subsystem verification.
 (2) 

((a)) Which interoperability constituents have been assessed as part of the subsystem;
((b)) Confirmation that the subsystem contains the interoperability constituents identical to those verified as part of the subsystem;
((c)) For those interoperability constituents, the reason(s) why the manufacturer did not provide an EC Declaration of conformity and/or suitability for use before its incorporation into the subsystem, including the application of national rules notified under Article 17 of Directive 2008/57/EC.
 6.6.3.  (1) During the transition period as well as after the transition period has ended, until the subsystem is upgraded or renewed (taking into account the decision of Member State on application of TSIs), the interoperability constituents which do not hold an EC Declaration of conformity and/or suitability for use and of the same type are permitted to be used as maintenance related replacements (spare parts) for the subsystem, under the responsibility of the body responsible for maintenance.
 (2) In any case the body responsible for maintenance must ensure that the components for maintenance related replacements are suitable for their applications, are used within their area of use, and enable interoperability to be achieved within the rail system while at the same time meeting the essential requirements. Such components must be traceable and certified in accordance with any national or international rule, or any code of practice widely acknowledged in the railway domain.
 7.  7.1.  (1) Chapters 4 to 6 and any specific provisions in Sections 7.2 to 7.6 below apply in full to the lines coming within the geographical scope of this TSI which will be put into service as interoperable lines after this TSI enters into force.
 (2) The Member States shall develop a national migration strategy which specifies for TEN lines those elements of the infrastructure subsystem, which are required for interoperable services (e.g. tracks, sidings, stations, marshalling yards) and therefore need to comply with this TSI. This migration strategy shall include plans related to renewal and upgrading. In specifying those elements the Member States shall consider the coherence of the system as a whole.
 7.2.  (1) New core TEN lines (type IV) shall satisfy the requirements of TSI category of line IV-P, IV-F or IV-M.
 (2) New other TEN lines (type VI) shall satisfy the requirements of TSI category of line VI-P, VI-F or VI-M. It is also permissible for the line to satisfy the requirements of TSI category of line IV-P, IV-F or IV-M respectively.
 (3) For the purpose of this TSI a ‘new line’ means a line that creates a route where none currently exists.
 (4) 

((a)) the realignment of part of an existing route,
((b)) the creation of a bypass,
((c)) the addition of one or more tracks on an existing route, regardless of the distance between the original tracks and the additional tracks.
 7.3. 
Four possible cases of application of this TSI are relevant.
 7.3.1.  (1) In accordance with Directive 2008/57/EC, Article 2(m), ‘upgrading’ means any major modification work on a subsystem or part of a subsystem which improves the overall performance of the subsystem.
 (2) 

(2.1) Upgrading of existing core TEN lines shall be in accordance with the requirements of TSI category of line V-P, V-F and V-M. (An upgrade to the requirements of type of line IV is permissible.)
(2.2) Upgrading of existing other TEN lines shall be in accordance with the requirements of TSI category of line VII-P, VII-F or VII-M. (An upgrade to the requirements of type of line VI is permissible.)
(2.3) For other TSI parameters, according to Article 20(1) of the Directive 2008/57/EC, the Member State decide to what extent the TSI need to be applied to the project.
 (3) Where Article 20(2) of the Directive 2008/57/EC applies because the upgrading is subject of an authorisation of placing into service, the Member State decides which requirements of the TSI must be applied taking into account the migration strategy referred to in Section 7.1.
 (4) Where Article 20(2) of the Directive 2008/57/EC does not apply because the upgrading is not subject of an authorisation of placing into service, the conformity with this TSI is recommended. Where it is not possible to achieve conformity, the contracting entity informs the Member State of the reasons thereof.
 (5) For a project including elements not being TSI conform, the procedures for the assessment of conformity and EC verification to be applied should be agreed with the Member State.
 7.3.2.  (1) In accordance with Directive 2008/57/EC, Article 2(n), ‘renewal’ means any major substitution work on a subsystem or part subsystem which does not change the overall performance of the subsystem.
 (2) For this purpose major substitution should be interpreted as a project undertaken to systematically replace elements of a line or a section of a line in consistency with the national migration plan. Renewal differs from a substitution in the framework of maintenance, referred to in Section 7.3.3 below, in that it gives the opportunity to achieve a TSI compliant route. A renewal is effectively the same case as upgrading, but without a change in performance parameters.
 (3) Where Article 20(2) of the Directive 2008/57/EC applies because the renewal is subject of an authorisation of placing into service, the Member State decides which requirements of the TSI must be applied taking into account the migration strategy referred to in Section 7.1.
 (4) Where Article 20(2) of the Directive 2008/57/EC does not apply because the renewal is not subject of an authorisation of placing into service, the conformity with this TSI is recommended. Where it is not possible to achieve conformity, the contracting entity informs the Member State of the reasons thereof.
 (5) For a project including elements not being TSI conform, the procedures for the assessment of conformity and EC verification to be applied should be agreed with the Member State.
 7.3.3.  (1) Where the parts of a subsystem on a line are maintained, the formal verification and authorisation for placing into service is not required in accordance with this TSI. However, maintenance replacements should be, as far as is reasonably practicable, undertaken in accordance with the requirements of this TSI.
 (2) The objective should be that maintenance replacements progressively contribute the development of an interoperable line.
 (3) 

((a)) Line layout,
((b)) Track parameters,
((c)) Switches and crossings,
((d)) Track resistance to applied loads,
((e)) Structures resistance to traffic loads,
((f)) Platforms.
 (4) In such cases, account must be taken of the fact that each of these elements taken in isolation does not make it possible on its own to ensure the conformity of the whole: the conformity of a subsystem can only be stated globally, that is when all the elements have been brought into conformity with the TSI.
 7.3.4.  (1) An existing subsystem may allow the circulation of TSI-conform vehicles whist meeting the essential requirements of Directive 2008/57/EC. The infrastructure manager should be able in this case, on a voluntary basis, to complete the Register of Infrastructure set out in Article 35 of Directive 2008/57/EC in accordance with Annex D of this TSI.
 (2) The procedure to be used for the demonstration of the level of compliance with the basic parameters of the TSI shall be defined in the specification of Register of Infrastructure to be adopted by the Commission in accordance with that Article.
 7.4.  (1) It is permissible to bring a line into service as an interoperable line at a lower speed than its intended ultimate line speed. However, when it is the case the line should not be constructed in a way that inhibits future adoption of the intended ultimate line speed.
 (2) For example the distance between track centres shall be suitable for the intended ultimate line speed but the cant will need to be appropriate to the speed at the time the line is brought into service.
 (3) Requirements for assessment of conformity in this circumstance are set out in Section 6.3.
 7.5.  (1) Rolling stock conforming to the rolling stock TSIs is not automatically compatible with all lines complying with this Infrastructure TSI. For example, a GC gauge vehicle is not compatible with a GB gauge tunnel.
 (2) The design of the TSI categories of line as defined in Chapter 4 is generally compatible with the operation of vehicles categorised in accordance with EN 15528:2008 at up to the maximum speed as shown in Annex E. However there may be a risk of excessive dynamic effects including resonance in certain bridges which may further impact the compatibility of vehicles and infrastructure.
 (3) Checks, based on specific operational scenarios agreed between the infrastructure manager and the railway undertaking, may be undertaken to demonstrate the compatibility of vehicles operating above the maximum speed shown in Annex E.
 (4) As stated in Section 4.2.2 of this TSI, it is permissible to design new and upgraded lines such that they will also accommodate larger gauges, higher axle loads, greater speeds and longer trains than those specified.
 7.6. 
The following specific cases may be applied on particular networks. These specific cases are classified as:

(a) ‘P’ casespermanent cases,(b) ‘T’ casestemporary cases, where it is recommended that the target system is reached by 2020 (an objective set in Decision No 1692/96/EC, as amended by Decision No 884/2004/EC).

The specific cases set out in Sections 7.6.1 to 7.6.13 should be read in conjunction with the relevant sections of Chapter 4. Unless otherwise indicated (for example, in the case of an additional requirement), the specific cases replace the corresponding requirements given in Chapter 4. Where the requirements of the relevant section in Chapter 4 are not subject to a specific case, those requirements have not been duplicated in Sections 7.6.1 to 7.6.13, and continue to apply unmodified.
 7.6.1. 
The specific cases for 1 520/1 524 mm track gauge system are an open point.
 7.6.2.  7.6.2.1.  (1) The Structure gauge shall be set on the basis of the gauge FIN 1.
 (2) Calculations of the structure gauge shall be done using the static or kinematic method in accordance with the requirements of EN 15273-3:2009 Annex D Section D.4.4.
 7.6.2.2.  (4) Reverse curves with radii in the range from 150 m to 300 m shall be designed according to national rules notified for this purpose to prevent buffer locking.
 7.6.2.3.  (1) The nominal track gauge shall be 1 524 mm.
 7.6.2.4.  (2) 

((a)) S 1002 as defined in EN 13715:2006 Annex C with SR = 1 505 mm,
((b)) S 1002 as defined in EN 13715:2006 Annex C with SR = 1 511 mm,
((c)) GV 1/40 as defined in EN 13715:2006 Annex B with SR = 1 505 mm,
((d)) GV 1/40 as defined in EN 13715:2006 Annex B with SR = 1 511 mm,
((e)) EPS as defined in EN 13715:2006 Annex D with SR = 1 505 mm.
 7.6.2.5. 

Speed range(km/h) Mean gauge (mm) over 100 m
v ≤ 60 assessment not required
60 < v ≤ 160 1 519
160 < v ≤ 200 1 519
 7.6.2.6.  (2) 

((a)) Maximum value of free wheel passage in switches: 1 469 mm.
((b)) Minimum value of fixed nose protection for common crossings: 1 478 mm.
((c)) Maximum value of free wheel passage at crossing nose: 1 440 mm.
((d)) Maximum value of free wheel passage at check rail/wing rail entry: 1 469 mm.
((e)) Maximum excess height of the check rail is 55 mm.

Additional requirements in (a) and (b) remain unchanged.
 7.6.3.  7.6.3.1.  (2) New and upgraded 1 000 mm lines (of Peloponnese) on the trans-European conventional rail system shall be designed to a gauge according to national rules notified for this purpose and have an axle load of 14 t.
 (6) The actual performance parameters for each section of track for the 1 000 mm lines (on Peloponnese) shall be published in the Register of Infrastructure.
 (7) The published information relating to axle load shall be published in combination with the permitted speed.
 7.6.3.2.  (1) The structure gauge for the 1 000 mm lines (of Peloponnese) shall be set according to national rules notified for this purpose.
 7.6.3.3.  (1) The distance between track centres for the 1 000 mm lines (of Peloponnese) shall be set on the basis of the gauge according to national rules notified for this purpose.
 7.6.3.4.  (3) Maximum gradients as steep as 20 mm/m are permitted for main tracks at the design phase.
 7.6.3.5.  (2) For stabling tracks or sidings the minimum horizontal design curve radius for the 1 000 mm lines (of Peloponnese) shall not be less than 110 m.
 7.6.3.6.  (1) Vertical alignment of stabling and service tracks for the 1 000 mm lines (of Peloponnese) shall not include curves of radii less than 500 m on a crest or in a hollow.
 7.6.3.7.  (1) The nominal track gauge shall be either 1 435 mm or 1 000 mm.
 7.6.3.8.  (2) 

((a)) Maximum value of free wheel passage in switches: 946 mm.
((b)) Minimum value of fixed nose protection for common crossings: 961 mm.
((c)) Maximum value of free wheel passage at crossing nose: not applicable.
((d)) Maximum value of free wheel passage at check rail/wing rail entry: 943 mm.

Additional requirements in (a) and (b) remain unchanged.
 7.6.3.9.  (a) The track for the 1 000 mm lines (of Peloponnese), including switches and crossings, shall be designed to withstand at least the maximum static axle load of 14 t.
 7.6.3.10.  (3) The value of alpha (a) for 1 000 mm lines (of Peloponnese) shall be equal to or greater than 0,75.
 7.6.4.  7.6.4.1.  (2) New and upgraded lines on the trans-European conventional rail system shall be designed to length of passenger trains at least 215 m and to length of freight trains at least 350 m, according to national rules notified for this purpose.
 7.6.4.2.  (1) The structure gauge shall be set on the basis of the IRL 1 uniform gauge according to national rules notified for this purpose.
 (1) The structure gauge shall be set on the basis of the IRL 2 uniform gauge according to national rules notified for this purpose.
 7.6.4.3.  (1) The minimum distance between track centres shall be set on the basis of the gauge IRL 1 according to national rules notified for this purpose.
 (1) The minimum distance between track centres shall be set on the basis of the gauge IRL 2 according to national rules notified for this purpose.
 7.6.4.4.  (1) The nominal track gauge shall be 1 600 mm.
 7.6.4.5.  (2) 

((a)) S 1002 as defined in EN 13715:2006 Annex C with SR = 1 585 mm,
((b)) S 1002 as defined in EN 13715:2006 Annex C with SR = 1 591 mm,
((c)) GV 1/40 as defined in EN 13715:2006 Annex B with SR =1 585 mm,
((d)) GV 1/40 as defined in EN 13715:2006 Annex B with SR = 1 591 mm,
((e)) EPS as defined in EN 13715:2006 Annex D with SR = 1 585 mm.
 7.6.4.6. 

Speed range(km/h) Mean gauge (mm) over 100 m
v ≤ 60 assessment not required
60 < v ≤ 160 1 595
160 < v ≤ 200 1 595
 7.6.4.7.  (2) 

((a)) Maximum value of free wheel passage in switches: 1 546 mm.
((b)) Minimum value of fixed nose protection for common crossings: 1 556 mm.
((c)) Maximum value of free wheel passage at crossing nose: 1 521 mm.
((d)) Maximum value of free wheel passage at check rail/wing rail entry: 1 546 mm.

Additional requirements in (a) and (b) remain unchanged.
 7.6.5. 
The specific cases for 1 520/1 524 mm track gauge system are an open point.
 7.6.6. 
The specific cases for 1 520/1 524 mm track gauge system are an open point.
 7.6.7.  7.6.7.1.  (1) The structure gauge for the 1 520 mm lines shall be set according to national rules notified for this purpose.
 7.6.7.2.  (3) A nominal track gauge of 1 520 mm is permitted for lines used for servicing international traffic to/from 1 520/1 524 mm railway countries.
 7.6.7.3.  (2) 

((a)) S 1002 as defined in EN 13715:2006 Annex C with SR = 1 503 mm,
((b)) S 1002 as defined in EN 13715:2006 Annex C with SR = 1 509 mm,
((c)) GV 1/40 as defined in EN 13715:2006 Annex B with SR = 1 503 mm,
((d)) GV 1/40 as defined in EN 13715:2006 Annex B with SR = 1 509 mm,
((e)) EPS as defined in EN 13715:2006 Annex D with SR = 1 503 mm.
 7.6.7.4. 

Speed range(km/h) Mean gauge (mm) over 100 m
v ≤ 120 assessment not required
120 < v ≤ 160 1 515
160 < v ≤ 200 1 515
 7.6.7.5.  (2) 

((a)) Maximum value of free wheel passage in switches: 1 460 mm.
((b)) Minimum value of fixed nose protection for common crossings: 1 476 mm.
((c)) Maximum value of free wheel passage at crossing nose: 1 436 mm.
((d)) Maximum value of free wheel passage at check rail/wing rail entry: 1 460 mm.

Additional requirements in (a) and (b) remain unchanged.
 7.6.7.6.  (1) For the 1 520 mm track gauge system, the maximum design value of the unguided length shall be equivalent to 1 in 9 (tgα = 0,11, α = 6°20’) obtuse crossing with a minimum 44 mm raised check rail and associated with a wheel diameter greater than 330 mm on straight through routes.
 7.6.8.  7.6.8.1. 
The structure gauge shall be set on the basis of the reference contours CPb, CPb+ or CPc.

Calculations of the structure gauge shall be done using the kinematic method in accordance with the requirements of EN 15273-3:2009 Annex D Section D.4.3.

For the three rail track system, the structure gauge shall be set on the basis of the CPb+ reference contour, centred on the track gauge 1 668 mm.
 7.6.8.2.  (1) The nominal track gauge shall be 1 668 mm, 1 435 mm or both if the line is equipped with the three rail track system.
 7.6.8.3.  (2) 

((a)) S 1002 as defined in EN 13715:2006 Annex C with SR = 1 653 mm,
((b)) S 1002 as defined in EN 13715:2006 Annex C with SR = 1 659 mm,
((c)) GV 1/40 as defined in EN 13715:2006 Annex B with SR = 1 653 mm,
((d)) GV 1/40 as defined in EN 13715:2006 Annex B with SR = 1 659 mm,
((e)) EPS as defined in EN 13715:2006 Annex D with SR = 1 653 mm.
 7.6.8.4. 

Speed range(km/h) Mean gauge (mm) over 100 m
v ≤ 60 assessment not required
60 < v ≤ 160 1 663
160 < v ≤ 200 1 663
 7.6.8.5. 
The technical characteristics of switches and crossings for the nominal track gauge of 1 668 mm shall comply with the following in-service values:


((a)) Maximum value of free wheel passage in switches: 1 613 mm.
((b)) Minimum value of fixed nose protection for common crossings: 1 624 mm.
((c)) Maximum value of free wheel passage at crossing nose: 1 589 mm.
((d)) Maximum value of free wheel passage at check rail/wing rail entry: 1 613 mm.

Additional requirements in (a) and (b) remain unchanged.
 7.6.9.  7.6.9.1.  (2)(f) The technical characteristics of switches and crossings shall comply with an in-service value for minimum flangeway depth of 38 mm.
 7.6.10.  7.6.10.1.  (1) The structure gauge shall be set on the basis of the gauge GHE16 according to national rules notified for this purpose.
 (4) Structure gauge for 1 435 mm track gauge and structure gauge for 1 668 mm track gauge for each section of three rail track shall be published in the Register of Infrastructure.
 7.6.10.2.  (1) 

Table 18
Distance between track centres on the Spanish network
Speed(km/h) Distance between track centres(mm)
v ≤ 140 3 808
140 < v ≤ 160 3 920
160 < v ≤ 200 4 000
In justified cases the distance between track centres can be decreased to the next lower value of the table, and in lines with speeds less than 100 km/h it might be decreased, in extreme cases, to 3 674 mm.
 (1) 
On lines with speeds less than 100 km/h it might be decreased to 3 674 mm.

If the selected distance between track centres is less than 3 808 mm, then the safe passing clearance between trains shall be demonstrated.
 7.6.10.3.  (3) Maximum gradients as steep as 20 mm/m are permitted for main tracks at the design phase.
 7.6.10.4.  (1) The nominal track gauge shall be either 1 668 mm or 1 435 mm.
 (3) The nominal track gauge of three rail tracks shall be 1 435 mm and 1 668 mm.
 7.6.10.5.  (2) 

((a)) S 1002 as defined in EN 13715:2006 Annex C with SR = 1 653 mm,
((b)) S 1002 as defined in EN 13715:2006 Annex C with SR = 1 659 mm,
((c)) GV 1/40 as defined in EN 13715:2006 Annex B with SR = 1 653 mm,
((d)) GV 1/40 as defined in EN 13715:2006 Annex B with SR = 1 659 mm,
((e)) EPS as defined in EN 13715:2006 with Annex D SR = 1 653 mm.
 7.6.10.6. 

Speed range(km/h) Mean gauge (mm) over 100 m
v ≤ 60 assessment not required
60 < v ≤ 160 1 663
160 < v ≤ 200 1 663
 7.6.10.7. 
The technical characteristics of switches and crossings for the nominal track gauge of 1 668 mm shall comply with the following in-service values:


((a)) Maximum value of free wheel passage in switches: 1 618 mm.
((b)) Minimum value of fixed nose protection for common crossings: 1 626 mm.
((c)) Maximum value of free wheel passage at crossing nose: 1 590 mm.
((d)) Maximum value of free wheel passage at check rail/wing rail entry: 1 620 mm.

Additional requirements in (a) and (b) remain unchanged.
 7.6.11. 
On infrastructure with direct connection to the Finnish network and for infrastructure in harbours, the particular features of the Finnish network as specified in Section 7.6.2 of this TSI may be applied.
 7.6.12.  7.6.12.1.  (7) 
If the load carrying capability of a section of track exceeds the range of route availability (RA) numbers, then additional information defining the load carrying capability may be provided.
 7.6.12.2.  (1) 
The application of the gauges shall be in accordance with the national technical rule notified for this purpose.
 7.6.12.3.  (1) 
Where topographical constraints prevent a nominal distance of 3 400 mm between track centres being achieved, it is permissible to reduce the distance between track centres provided special measures are put in place to ensure a safe passing clearance between trains.

Reduction in the distance between track centres shall be in accordance with the national technical rule notified for this purpose.
 7.6.12.4.  (3) For the ‘CEN56 Vertical’ design of switches and crossings a nominal track gauge of 1 432 mm is permitted.
 7.6.12.5.  (4) For the ‘CEN56 Vertical’ design of switches and crossings, a minimum value of fixed nose protection for common crossings of 1 388 mm is permitted (measured 14 mm below the running surface, and on the theoretical reference line, at an appropriate distance back from the actual (RP) of the nose as indicated in figure 2).
 7.6.13. 
On the UK network for Northern Ireland the particular features of the Irish network as specified in Section 7.6.4 of this TSI shall be applied.

ANNEX A 
The characteristics of the interoperability constituents to be assessed by the notified body or the manufacturer in accordance with the selected module, in the different phases of design, development and production, are marked by ‘X’ in Table 20. Where no assessment is required, this is marked by ‘n.a.’ in the table.

There are no particular assessment procedures required for interoperability constituents of the infrastructure subsystem.

Characteristics to be assessed Assessment in the following phase
Design and development phase Production phase
Design review Review of manufacturing process Type test Product quality(series)
 5.3.1 The rail
    
 5.3.1.1 Railhead profile
 X X n.a. X
 5.3.1.2 Moment of inertia of the rail cross section
 X n.a. n.a. n.a.
 5.3.1.3 Rail hardness
 X X n.a. X
 5.3.2 The rail fastening systems
 n.a. n.a. X X
 5.3.3 Track sleepers
 X X X X
ANNEX B 
The characteristics of the subsystem to be assessed in the different phases of design, construction and operation are marked by ‘X’ in Table 21.

Where no assessment by a notified body is required, this is marked by ‘n.a.’ in the table. This does not prevent the need for other assessments to be performed in the framework of other phases.

Definition of assessment phases:

(1) ‘Design review’it includes checking of correctness of values/parameters against applicable TSI requirements.(2) ‘Assembly before putting into service’checking on site that the actual product complies with the relevant design parameters just before putting it into operation.

Column 3 gives references to Section 6.2.4 ‘Particular assessment procedures for subsystem’.

Characteristics to be assessed New line or upgrading/renewal project Particular assessment procedures
Design review Assembly before putting into service
1 2 3
Structure gauge (4.2.4.1) X X 6.2.4.1
Distance between track centres (4.2.4.2) X X 6.2.4.2
Maximum gradients (4.2.4.3) X n.a. 
Minimum radius of horizontal curve (4.2.4.4) X X 
Minimum radius of vertical curve (4.2.4.5) X X 
Nominal track gauge (4.2.5.1) X n.a. 
Cant (4.2.5.2) X X 
Rate of change of cant (4.2.5.3) X X 
Cant deficiency (4.2.5.4) X n.a. 6.2.4.3
Equivalent conicity (4.2.5.5.1) — design X n.a. 6.2.4.4
Equivalent conicity (4.2.5.5.2) — in-service Open point Open point 6.2.4.5
Railhead profile for plain line (4.2.5.6) X n.a. 
Rail inclination (4.2.5.7) X n.a. 
Track stiffness (4.2.5.8) Open point Open point 
Means of locking (4.2.6.1) X X 
In-service geometry of switches and crossings (4.2.6.2) n.a. n.a. 6.2.4.7
Maximum unguided length of fixed obtuse crossings (4.2.6.3) X n.a. 6.2.4.7
Track resistance to vertical loads (4.2.7.1) X n.a. 6.2.5
Longitudinal track resistance (4.2.7.2) X n.a. 6.2.5
Lateral track resistance (4.2.7.3) X n.a. 6.2.5
Resistance of new bridges to traffic loads (4.2.8.1) X n.a. 6.2.4.8
Equivalent vertical loading for new earthworks and earth pressure effects (4.2.8.2) X n.a. 6.2.4.8
Resistance of new structures over or adjacent to tracks (4.2.8.3), X n.a. 6.2.4.8
Resistance of existing bridges and earthworks to traffic loads (4.2.8.4) n.a. n.a. 6.2.4.9
Determination of immediate action, intervention and alert limits (4.2.9.1) n.a. n.a. 6.2.4.5
The immediate action limit for track twist (4.2.9.2) n.a. n.a. 
The immediate action limit for variation of track gauge (4.2.9.3) n.a. n.a. 
The immediate action limit for cant (4.2.9.4) n.a n.a. 
Usable length of platforms (4.2.10.1) X n.a. 
Width and edge of platforms (4.2.10.2) See PRM See PRM 
End of platforms (4.2.10.3) See PRM See PRM 
Height of platforms (4.2.10.4) See PRM See PRM 
Offset of platforms (4.2.10.5) See PRM See PRM 
Maximum pressure variation in tunnels (4.2.11.1) X n.a. 6.2.4.6
Noise and vibration limits and mitigation measures (4.2.11.2), Open point Open point 
Protection against electric shock (4.2.11.3) See ENE See ENE 
Safety in railway tunnels (4.2.11.4) See SRT See SRT 
Effect of crosswinds (4.2.11.5) Open point Open point 
Distance markers (4.2.12.1), n.a. X 
Toilet discharge (4.2.13.2) n.a. n.a 6.2.4.10
Train external cleaning facilities (4.2.13.3) n.a. n.a. 6.2.4.10
Water restocking (4.2.13.4) n.a. n.a. 6.2.4.10
Refuelling (4.2.13.5) n.a. n.a. 6.2.4.10
Electric shore supply (4.2.13.6) n.a. n.a 6.2.4.10
ANNEX C 
The capability requirements for structures are defined in Table 22 by a combined parameter comprising of the route availability number and a corresponding maximum speed. The route availability number and maximum associated speed shall be considered as a single combined parameter.

The route availability number is a function of maximum axle load and geometrical aspects relating to the spacing of axles. route availability numbers are defined in the national technical rules notified for this purpose.

CR TSI INF TSI category of line Passenger carriages (including coaches, vans and car carriers) and light freight wagons Freight wagons other vehicles Locomotives and power heads Electric or diesel multiple units, power units and railcars
IV-P RA2 – 125  RA7 – 125RA8 – 110RA8 – 100 RA3 – 125RA5 – 100
IV-F  RA10 – 60RA8 – 75RA2 – 90 RA8 – 90 
IV-M see IV-P see IV-F see IV-P see IV-P
V-P RA2 – 100  RA7 – 100RA8 – 100RA8 – 90 RA3 – 100
V-F  RA8 – 60 RA8 – 60 
V-M see V-P RA8 – 75 see V-P see V-P
VI-P RA2 – 90  RA8 – 90 RA3 – 90
VI-F  RA10 – 60 RA8 – 60 
VI-M see VI-P RA10 – 60RA8 – 75RA2 – 90 see VI-P see VI-P
VII-P RA1 – 75  RA7 – 75 RA3 – 75
VII-F  RA7 – 60 RA7 – 60 
VII-M RA2 – 75 RA7 – 75 RA7 – 75 see VII-P
Notes











ANNEX D 
As stated in Section 4.8 of this TSI, this Annex indicates which information concerning the infrastructure subsystem shall be included in the Register of Infrastructure.

Infrastructure subsystem item Section of this TSI
Route, boundaries and section of line concerned (description) 
Section of line 
TSI category of line 4.2.1
Gauge 4.2.2
EN line category (locomotive classes if relevant) in combination with permitted speed 4.2.2
Line speed 4.2.2
Train length 4.2.2
Conditions for running trains with specific systems to enhance performance level 4.2.3.2
Location and type of nominal track gauge transition sections 4.2.3.2
Minimum distance between track centres 4.2.4.2
Maximum gradients 4.2.4.3
Minimum radius of horizontal curve 4.2.4.4
Nominal track gauge 4.2.5.1
Cant 4.2.5.2
Rail inclination for plain line 4.2.5.7.1
Use of braking systems independent of wheel-rail adhesion conditions (longitudinal track resistance) 4.2.7.2
Usable length of platforms 4.2.10.1
Distance markers 4.2.12.1
Fixed installations for servicing trains (location and type) 4.2.13
ANNEX E 
The capability requirements for structures are defined in Table 24 by a combined quantity comprising of the EN line category (or if relevant locomotive class) and a corresponding maximum speed. The EN line category (and if relevant locomotive class) and maximum associated speed shall be considered as a single combined quantity.

Both EN line category and locomotive class are a function of axle load and geometrical aspects relating to the spacing of axles. EN line categories are set out in EN 15528:2008 Annex A and locomotive classes are set out in Annexes J and K of EN 15528:2008.

TSI category of line Passenger carriages (including coaches, vans and car carriers) and light freight wagons Freight wagons other vehicles Locomotives and power heads Electric or diesel multiple units, power units and railcars
IV-P B1 – 200  D2 – 200L619 L620 L621 L622 – 160D4xL – 140 B1 – 200C2 – 180D2 – 140
IV-F  E5 – 100D4 – 120B2 – 140 D2 – 140D4xL – 120 
IV-M see IV-P see IV-F see IV-P see IV-P
V-P B1 – 160  L421,5 – 160L422,5 – 140L619 L620 L621 L622 – 140 C2 – 160D2 – 100
V-F  D4 – 100 L422.5 – 100L619 L620 L621 L622 – 100 
V-M see V-P see V-F see V-P see V-P
VI-P B1 – 140  D2 – 140D4xL – 140 C2 – 140D2 – 100
VI-F  E4 – 100 D2 – 100D4xL – 100 
VI-M see VI-P B2 – 140D4 – 120E4 – 100 D2 – 140D4xL – 140 C2 – 140D2 – 120
VII-P A – 120  L421,5 – 120 A – 120
VII-F  C2 – 100 L421,5 – 100L619 L620 L621 – 80 
VII-M B1 – 120 see VII-F see VII-P + VII-F B1 – 120









ANNEX F 

 Distance between track centres (see 4.2.4.2)
 Requirements for controlling equivalent conicity in service (see 4.2.5.5.2)
 Track stiffness (see 4.2.5.8)
 Noise and vibration limits and mitigation measures (see 4.2.11.2)
 Effect of crosswinds (see 4.2.11.5)
 Specific cases for the Estonian network (see 7.6.1)
 Specific cases for the Latvian network (see 7.6.5)
 Specific cases for the Lithuanian network (see 7.6.6)

ANNEX G 
Defined term TSI section Definition
Actual point (RP)/Praktischer Herzpunkt/Pointe de cœur 4.2.6.2 Physical end of a crossing vee. See Figure 2, which shows the relationship between the actual point (RP) and the intersection point (IP).
Alert limit/Auslösewert/Limite d’alerte 4.2.9.1 Refers to the value which, if exceeded, requires that the track geometry condition is analysed and considered in the regularly planned maintenance operations.
Axle load/Achsfahrmasse/Charge à l’essieu 4.2.2, 4.2.7.1 Sum of the static vertical wheel forces exerted on the track through a wheelset or a pair of independent wheels divided by acceleration of gravity.
Cant/Überhöhung/Dévers de la voie 4.2.5.24.2.5.34.2.9.4 Difference in height, relative to the horizontal, of the two rails of one track at a particular location, measured at the centrelines of the heads of the rails.
Cant deficiency/Überhöhungsfehlbetrag/Insuffisance de devers 4.2.5.4 Difference between the applied cant and a higher equilibrium cant.
Common crossing/Starres Herzstück/Cœur de croisement 4.2.6.2 Arrangement ensuring intersection of two opposite running edges of turnouts or diamond crossings and having one crossing vee and two wing rails.
Core TEN line/TEN Strecke des Kernnetzes/Ligne du RTE déclarée corridor 4.2.1, 7.2, 7.3 A TEN line identified by a Member State as an important part of an international corridor in Europe.
Crosswind/Seitenwind/Vents traversiers 4.2.11.5 Strong wind blowing laterally to a line which may adversly affect the safety of trains running.
Degraded operation/Gestörter Betrieb/Exploitation degradee 4.4.2 Operation resulting from an unplanned event that prevents the normal delivery of train services.
Design value/Planungswert/Valeur de conception 4.2.4.4, 4.2.5.2, 4.2.5.4.2, 4.2.5.5.1, 4.2.5.7.2, 4.2.9.4, 4.2.6.2, 4.2.6.3 Theoretical value without manufacturing, construction or maintenance tolerances.
Distance between track centres/Gleisabstand/Entraxe de voies 4.2.4.2 The distance between points of the centre lines of the two tracks under consideration, measured parallel to the running surface of the reference track namely the less canted track.
Diverging track/Zweiggleis/Voie déviée 4.2.5.4.2 In the context of switches and crossings, a route which diverges from the through route.
Dynamic lateral force/Dynamische Querkraft/Effort dynamique transversal 4.2.7.3 The sum of dynamic forces exerted by a wheelset on the track in lateral direction.
Earthworks/Erdbauwerke/Ouvrages en terre 4.2.8.2, 4.2.8.4 Soil structures and soil-retaining structures that are subject to railway traffic loading.
EN line category/EN Streckenklasse/EN Catégorie de ligne 4.2.2, 4.2.8.4, 7.5, Annex E The result of the classification process set out in EN 15528:2008 Annex A and referred to in that standard as ‘line category’. It represents the ability of the infrastructure to withstand the vertical loads imposed by vehicles on the line or section of line for regular service.
Equivalent conicity/Äquivalente Konizität/Conicité équivalente 4.2.5.5 The tangent of the cone angle of a wheelset with coned wheels whose lateral movement has the same kinematic wavelength as the given wheelset on straight track and large-radius curves.
Excess height of check rail/Radlenkerüberhöhung/Surélévation du contre rail 4.2.6.2 (g) Height of the check rail above the adjacent running rail (see dimension 7 on Figure 5 below).
Fixed nose protection/Leitweite/Cote de protection de pointe 4.2.6.2 (b) Dimension between the crossing nose and check rail (see dimension No 2 on Figure 5 below).
Flangeway depth/Rillentiefe/Profondeur d’ornière 4.2.6.2 (f) Dimension between the running surface and the bottom of flangeway (see dimension No 6 on Figure 5 below).
Flangeway width/Rillenweite/Largeur d’ornière 4.2.6.2 (e) Dimension between a running rail and an adjacent check or wing rail (see dimension No 5 on Figure 5 below).
Free wheel passage at check rail/wing rail entry/Freier Raddurchlauf im Radlenker-Einlauf/Flügelschienen-Einlauf/Côte d’équilibrage du contre-rail 4.2.6.2 (d) Dimension between the working face of the crossing check rail or wing rail and the gauge face of the running rail opposite across the gauge measured at entry to check rail or wing rail respectively.(see dimensions No 4 on Figure 5 below). The entry to the check rail or wing rail is the point at which the wheel is permitted to contact the check rail or wing rail.
Free wheel passage at crossing nose/Freier Raddurchlauf im Bereich der Herzspitze/Cote de libre passage dans le croisement 4.2.6.2 (c) Dimension between the working face of the crossing wing rail and check rail opposite across the gauge (see dimension No 3 on Figure 5 below).
Free wheel passage in switches/Freier Raddurchlauf im Bereich der Zungenvorrichtung/Côte de libre passage de l’aiguillage 4.2.6.2 (a) Dimension from the gauge face of one switch rail to the back edge of the opposite switch rail (see dimension No 1 on Figure 5 below).
Gauge/Begrenzungslinie/Gabarit 4.2.2 Set of rules including a reference contour and its associated calculation rules allowing definition of the outer dimensions of the vehicle and the space to be cleared by the infrastructure.
HBW/HBW/HBW 5.3.1.3 The non SI unit for steel hardness defined in EN ISO 6506-1:2005 Metallic materials — Brinell hardness test. Test method.
Immediate action limit/Soforteingriffsschwelle/Limite d’intervention immédiate 4.2.9.1, 4.2.9.2, 4.2.9.3, 4.2.9.4 The value which, if exceeded, requires taking measures to reduce the risk of derailment to an acceptable level.
Infrastructure manager/Betreiber der Infrastruktur/Gestionnaire de l’Infrastructure 4.2.5.5, 4.2.6.2, 4.2.9, 4.4.3, 4.5.2, 6.2.2.1, 6.2.4, 6.4, 7.3.4, 7.5 As defined in Article 2(h) of Directive 2001/14/EC of the European Parliament and of the Council of 26 February 2001 on the allocation of railway infrastructure capacity and the levying of charges for the use of railway infrastructure and safety certification (OJ L 75, 15.3.2001, p. 29).
In-service value/Wert im Betriebszustand/Valeur en exploitation 4.2.5.5.24.2.6.24.2.9.4 Value measured at any time after the infrastructure has been placed into service.
Intersection point (IP)/Theoretischer Herzpunkt/Point d’intersection théorique 4.2.6.2 Theoretical intersection point of the running edges at the centre of the crossing (see Figure 2).
Intervention limit/Eingriffsschwelle/Valeur d’intervention 4.2.9.1 The value, which, if exceeded, requires corrective maintenance in order that the immediate action limit shall not be reached before the next inspection;
Isolated defect/Einzelfehler/Défaut isolé 4.2.9.14.2.9.2 A discrete track geometry fault.
Line speed/Streckengeschwindigkeit/Vitesse de la ligne 4.2.2 Maximum speed for which a line has been designed.
Maintenance file/Instandhaltungsdossier/Dossier de maintenance 4.5.1 Elements of the technical file relating to conditions and limits of use and instructions for maintenance.
Maintenance plan/Instandhaltungsplan/Plan de maintenance 4.5.2 A series of documents setting out the infrastructure maintenance procedures adopted by an infrastructure manager.
Main tracks/Hauptgleise/Voies principales 4.2.4.3 Tracks used for running trains in service. The term excludes sidings, depots, stabling tracks and connecting lines.
Multi-rail track/Mehrschienengleis/Voie à multi écartement 4.2.3.2, 4.2.6.3 Track with more than two rails, where at least two pairs of respective rails are designed to be operated as separate single tracks, with or without different track gauges.
Nominal track gauge/Nennspurweite/Ecartement nominal de la voie 4.2.5.1 A single value that identifies the track gauge
Normal service/Regelbetrieb/Service régulier 4.2.3.24.2.10.1 The railway operating to a planned timetable service.
Other TEN line/Weitere TEN Strecke/Autre ligne du RTE 4.2.1, 7.2, 7.3 A TEN line not being a core TEN line.
Passive provision/Vorsorge für künftige Erweiterungen/Réservation pour extension future 4.2.10.1 Provision for the future construction of a physical extension to a structure (for example: increased platform length).
Performance parameter/Leistungskennwert/Paramètre de performance 4.2.2 Parameter describing a TSI category of line used as the basis for the design of infrastructure subsystem elements and as the indication of the performance level of a line.
Plain line/Freie Strecke/Voie courante 4.2.5.54.2.5.64.2.5.7 Section of track without switches and crossings.
Point retraction/Spitzenbeihobelung/Dénivelation de la pointe de cœur 4.2.6.2 (b) The reference line in a fixed common crossing can deviate from the theoretical reference line. From a certain distance to the crossing point, the reference line of the vee can, depending on the design, be retracted from this theoretical line away from the wheel flange in order to avoid contact between both elements. This situation is described in Figure 2.
Rail inclination/Schienenneigung/Inclinaison du rail 4.2.5.54.2.5.7 An angle defining the inclination of the head of a rail when installed in the track relative to the plane of the rails (running surface), equal to the angle between the axis of symmetry of the rail (or of an equivalent symmetrical rail having the same railhead profile) and the perpendicular to the plane of the rails.
Rail pad/Schienenzwischenlage/Semelle sous rail 5.3.2 A resilient layer fitted between a rail and the supporting sleeper or baseplate.
Reverse curve/Gegenbogen/Courbes et contre-courbes 4.2.4.4 Two abutting curves of opposite flexure or hand.
Structure gauge/Lichtraum/Gabarit des obstacles 4.2.4.1 Defines the space in relation to the reference track that shall be cleared of all objects or structures and of the traffic on the adjacent tracks, in order to allow safe operation on the reference track. It is defined on the basis of the reference contour by application of the associated rules.
Switches/Zungenvorrichtung/Aiguillage 4.2.5.4.24.2.6.1 A unit of track comprising two fixed rails (stock rails) and two movable rails (switch rails) used to direct vehicles from one track to another track.
Switches and crossings/Weichen und Kreuzungen/Appareil de voie 4.2.5.4.1, 4.2.5.7.2, 4.2.6, 4.2.7.1, 4.2.7.2.1, 4.2.7.3, 5.2 Track constructed from sets of switches and individual crossings and the rails connecting them.
Through route/Stammgleis/Voie directe 4.2.5.4.14.2.6.3 In the context of switches and crossings a route which perpetuate the general alignment of the track.
Track gauge/Spurweite/Ecartement de la voie 4.2.5.1 The smallest distance between lines perpendicular to the running surface intersecting each railhead profile in a range from 0 to 14 mm below the running surface.
Track stiffness/Steifigkeit des Gleises/Rigidite de la voie 4.2.5.8 The global measure expressing the resistance of the track against the rail displacement that takes place under wheel loading.
Track twist/Gleisverwindung/Gauche 4.2.9.1, 4.2.9.2 Track twist is defined as the algebraic difference between two cross levels taken at a defined distance apart, usually expressed as a gradient between the two points at which the cross level is measured.
Train length/Zuglänge/Longueur du train 4.2.2 The length of a train, which can run on a certain line in normal operation.
TSI category of line/TSI Streckenkategorie/TSI Catégorie de ligne 4.2, 7.2, 7.3.1, 7.5, 7.6 Classification of a line according to type of traffic and type of line to select the needed level of performance parameters.
Type of line/Streckenart/Type de ligne 4.2.1, 7.3.1 Definition of the importance of a line (core or other) and the way of achieving parameters required for interoperability (new or upgraded).
Type of traffic/Verkehrsart/Type de trafic 4.2.1 Indicates for a TSI category of line the dominant traffic for the target system and the respective basic parameters.
Unguided length of an obtuse crossing/Führungslose Stelle/Lacune dans la traversée 4.2.6.3 Portion of obtuse crossing where there is no guidance of the wheel described as ‘unguided distance’ in EN 13232-3:2003.
Usable length of a platform/Bahnsteignutzlänge/Longueur utile de quai 4.2.10.1 The maximum continuous length of that part of platform in front of which a train is intended to remain stationary in normal operating conditions for passengers to board and alight from the train, making appropriate allowance for stopping tolerances.Normal operating conditions means that railway is operating in a non-degraded mode (e.g. rail adhesion is normal, signals are working, everything is working as planned).
Figure 5
ANNEX H 
Index No Reference Document name Version (year) BP(s) concerned
1 EN 13715 Railway applications — Wheelsets and boogies — Wheels — Wheels tread 2006 Design values for equivalent conicity (4.2.5.5.1)
2 EN 13803-2 Rail applications — Track — Track alignment design parameters — Track gauges 1 435 mm and wider — Part 2: Switches and crossings and comparable alignment design situations with abrupt changes of curvature(with Amendment A1:2009) 2006 Minimum radius of horizontal curve (4.2.4.4)
3 EN 13848-1 Rail applications — Track — Track geometry quality — Part 1: Characterisation of track geometry(with Amendment A1:2008) 2003 Determination of immediate action, intervention and alert limits (4.2.9.1), Assessment of minimum value of mean track gauge (6.2.4.5)
4 EN 15273-3 Railway applications — Gauges — Part 3: Structure gauges 2009 Performance parameters (4.2.2),Structure gauge (4.2.4.1),Assessment of distance between track centres (6.2.4.2),
5 EN 15302 Railway applications — Method for determining the equivalent conicity 2008 Design values for equivalent conicity (4.2.5.5.1
6 EN 15528 Railway applications — Line categories for managing the interface between load limits of vehicles and infrastructure 2008 Resistance of existing bridges and earthworks to traffic loads (4.2.8.4 and Annex E),
7 EN 1990:2002/A1 Eurocode — Basis of structural design — Amendment A1 2005 Resistance of new bridges to traffic loads (4.2.8.1)
8 EN 1991-2 Eurocode 1 — Actions on structures — Part 2: Traffic load on bridges 2003 Structures resistance to traffic loads (4.2.8), Resistance of new bridges to traffic loads (4.2.8.1),Equivalent vertical loading for new earthworks and earth pressure effects (4.2.8.2), Resistance of new structures over or adjacent to tracks (4.2.8.3)