
1 
These Regulations may be cited as the Offshore Safety (Miscellaneous Amendments) Regulations (Northern Ireland) 2007 and shall come into operation on 23rd April 2007.
2 

(1) The Offshore Installations and Pipeline Works (Management and Administration) Regulations (Northern Ireland) 1995 shall be amended in accordance with paragraphs (2) to (7).
(2) Regulation 2(1) shall be amended—
(a) by inserting after the definition of “the 1972 Order” the following definition—“
 “activity” includes a diving project;”;
(b) by inserting after the definition of “designated area” the following definition—“
 “diving project” has the meaning assigned to it by regulation 2(1) of the Diving at Work Regulations (Northern Ireland) 2005 save that it includes an activity in which a person takes part as a diver wearing an atmospheric pressure suit and without breathing in air or other gas at a pressure greater than atmospheric pressure;”;
(c) in the definition of “pipeline”, for “or within territorial waters, United Kingdom territorial waters adjacent to Great Britain or a designated area” substitute “within the territorial sea adjacent to the United Kingdom, or within a designated area”;
(d) in the definition of “pipeline works”, for “diving operations” substitute “a diving project”;
(e) by inserting after the definition of “stand-by vessel” the following definition—“
 “supplementary unit” means a fixed or floating structure, other than a vessel, for providing energy, information or substances to an offshore installation;”; and
(f) by substituting for the definition of “territorial waters” the following definition—“
 “territorial sea” means the territorial sea of the United Kingdom adjacent to Northern Ireland and “within the territorial sea” includes on, over and under it;”.
(3) Regulation 3 shall be amended—
(a) in paragraph (1), for “and which is not an excepted structure” substitute “together with any supplementary unit which is ordinarily connected to it or any part of it (including those parts described in paragraph (3)) and all of the connections”;
(b) in paragraph (2), for “For the purposes of paragraph (1), the excepted structures are” substitute “Any reference in paragraph (1) to a structure or unit does not include”; and
(c) in paragraph (2)(e), for “for the time being intended to be” substitute “yet being moved with a view to its being”.
(4) For regulation 4(1) there shall be substituted—“
4. 

(1) Within the territorial sea these Regulations shall apply only to and in relation to the premises and activities to which paragraphs 2, 3 and 4 of Schedule 1 apply.”
(5) In regulations 22(1) and (2), for “Schedule 1” substitute “Schedule 1A”.
(6) Schedule 1 shall be re-numbered as Schedule 1A.
(7) The Schedule set out in Schedule 1 to these Regulations shall be inserted before Schedule 1A.
3 

(1) The Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations (Northern Ireland) 1995 shall be amended in accordance with paragraphs (2) to (6).
(2) Regulation 2(1) shall be amended—
(a) by inserting after the definition of “acoustic signal” the following definition—“
 “activity” has the same meaning as in regulation 2(1) of the 1995 Regulations;”;
(b) by inserting after the definition of “concession owner” the following definitions—“
 “designated area” and “diving project” have the same respective meanings as in regulation 2(1) of the 1995 Regulations;”;
(c) in the definitions of “pipeline”, “pipeline works”, “stand-by vessel”, “territorial waters” and “vessel”—
(i) after “stand-by vessel” insert “supplementary unit”; and
(ii) for “territorial waters” substitute “territorial sea”.
(3) For regulation 3(1) there shall be substituted—“
3. 

(1) Within the territorial sea these Regulations shall apply only to and in relation to the premises and activities to which paragraphs 2, 3 and 4 of Schedule 1 apply.”
(4) In regulation 25(2), for “the Schedule” where it first appears substitute “Schedule 2” and for “the Schedule” where it second appears substitute “that Schedule”.
(5) The Schedule shall be numbered Schedule 2.
(6) The Schedule set out in Schedule 2 to these Regulations shall be inserted before Schedule 2.
4 

(1) The Offshore Installations and Wells (Design and Construction, etc.) Regulations (Northern Ireland) 1996 shall be amended in accordance with paragraphs (2) to (5).
(2) Regulation 2(1) shall be amended—
(a) by inserting after the definition of “the 1995 Regulations” the following definition—“
 “activity” has the same meaning as in regulation 2(1) of the 1995 Regulations;”;
(b) by inserting after the definition of “concession owner” the following definition—“
 “diving project” has the same meaning as in regulation 2(1) of the 1995 Regulations;”;
(c) by substituting for the definitions of “stand-by vessel”, “territorial waters” and “vessel” the following definitions—“
 “stand-by vessel”, “supplementary unit” and “territorial sea” have the same respective meanings as in regulation 2(1) of the 1995 Regulations;”; and
(d) by inserting after the definition of “traffic route” the following definition—“
 “vessel” has the same meaning as in regulation 2(1) of the 1995 Regulations;”.
(3) For regulation 3(1) there shall be substituted—“
3. 

(1) Within the territorial sea these Regulations shall apply only to and in relation to the premises and activities to which paragraphs 2 and 3 of Schedule 1A apply.”
(4) In regulation 3(3) for “territorial waters” substitute “territorial sea”.
(5) The Schedule set out in Schedule 3 to these Regulations shall be inserted after Schedule 1.
Sealed with the Official Seal of the Department of Enterprise, Trade and Investment on 13th March 2007.
M. Bohill
A senior officer of the Department of Enterprise, Trade and Investment

SCHEDULE 1
Regulation 2(7)
“
SCHEDULE 1
Regulation 4(1)
1. 

(1) For the purposes of this Schedule, any structures and devices on top of a well shall be treated as forming part of the well.
(2) Any reference in this Schedule to premises and activities includes a reference to any person, article or substance on those premises or engaged in, or, as the case may be, used or for use in connection with any such activity, but does not include a reference to an aircraft which is airborne.
2. 
This paragraph shall apply to and in relation to—
(a) any offshore installation and any activity on it;
(b) any activity in connection with an offshore installation, or any activity which is immediately preparatory thereto, whether carried on from the installation itself, on or from a vessel or in any other manner, other than—
(i) transporting, towing or navigating the installation; and
(ii) any activity in or from a vessel being used as a stand-by vessel;
(c) a diving project involving—
(i) the survey and preparation of the sea bed for an offshore installation;
(ii) the survey and restoration of the sea bed consequent on the removal of an offshore installation.
3. 

(1) Subject to sub-paragraph (2), this paragraph applies to and in relation to—
(a) a well and any activity in connection with it; and
(b) an activity which is immediately preparatory to any activity in head (a).
(2) Sub-paragraph (1) includes keeping a vessel on station for the purpose of working on a well but otherwise does not include navigation or an activity connected with navigation.
4. 
This paragraph applies to and in relation to—
(a) any pipeline;
(b) any pipeline works;
(c) the following activities in connection with pipeline works—
(i) the loading, unloading, fuelling or provisioning of a vessel;
(ii) the loading, unloading, fuelling, repair and maintenance of an aircraft on a vessel,
being in either case a vessel which is engaged in pipeline works.”
SCHEDULE 2
Regulation 3(6)
“
SCHEDULE 1
Regulation 3(1)
1. 

(1) For the purposes of this Schedule, any structures and devices on top of a well shall be treated as forming part of the well.
(2) Any reference in this Schedule to premises and activities includes a reference to any person, article or substance on those premises or engaged in, or, as the case may be, used or for use in connection with any such activity, but does not include a reference to an aircraft which is airborne.
2. 
This paragraph shall apply to and in relation to—
(a) any installation and any activity on it;
(b) any activity in connection with an installation, or any activity which is immediately preparatory thereto, whether carried on from the installation itself, on or from a vessel or in any other manner, other than—
(i) transporting, towing or navigating the installation; and
(ii) any activity in or from a vessel being used as a stand-by vessel;
(c) a diving project involving—
(i) the survey and preparation of the sea bed for an installation;
(ii) the survey and restoration of the sea bed consequent on the removal of an installation.
3. 

(1) Subject to sub-paragraph (2), this paragraph applies to and in relation to—
(a) a well and any activity in connection with it; and
(b) an activity which is immediately preparatory to any activity in head (a).
(2) Sub-paragraph (1) includes keeping a vessel on station for the purpose of working on a well but otherwise does not include navigation or an activity connected with navigation.
4. 
This paragraph applies to and in relation to—
(a) any pipeline;
(b) any pipeline works;
(c) the following activities in connection with pipeline works—
(i) the loading, unloading, fuelling or provisioning of a vessel;
(ii) the loading, unloading, fuelling, repair and maintenance of an aircraft on a vessel,
being in either case a vessel which is engaged in pipeline works.”
SCHEDULE 3
Regulation 4(5)
“
SCHEDULE 1A
Regulation 3(1)
1. 

(1) For the purposes of this Schedule, any structures and devices on top of a well shall be treated as forming part of the well.
(2) Any reference in this Schedule to premises and activities includes a reference to any person, article or substance on those premises or engaged in, or, as the case may be, used or for use in connection with any such activity, but does not include a reference to an aircraft which is airborne.
2. 
This paragraph shall apply to and in relation to—
(a) any installation and any activity on it;
(b) any activity in connection with an installation, or any activity which is immediately preparatory thereto, whether carried on from the installation itself, on or from a vessel or in any other manner, other than—
(i) transporting, towing or navigating the installation; and
(ii) any activity in or from a vessel being used as a stand-by vessel;
(c) a diving project involving—
(i) the survey and preparation of the sea bed for an installation;
(ii) the survey and restoration of the sea bed consequent on the removal of an installation.
3. 

(1) Subject to sub-paragraph (2), this paragraph applies to and in relation to—
(a) a well and any activity in connection with it; and
(b) an activity which is immediately preparatory to any activity in head (a).
(2) Sub-paragraph (1) includes keeping a vessel on station for the purpose of working on a well but otherwise does not include navigation or an activity connected with navigation.”