1 
This order may be cited as the Offshore Installations (Safety Zones) Order 1998 and shall come into force on 26th March 1998.
2 
A safety zone is hereby established around each installation specified in column 1 of the Schedule hereto (being an installation stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of the Schedule.
3 
In Schedule 1 to the Offshore Installations (Safety Zones) Order 1997 the entries relating to Emerald Central Location, Emerald Field FSU Template, Emerald Well WSE, Emerald Wells PSF and PSD and Emerald Wells WSA and WSB are deleted.
Signed by authority of the Secretary of State.
Angela Eagle
Parliamentary Under Secretary of State,
Department of the Environment, Transport and the Regions
5th March 1998
SCHEDULE
Article 2


(1) (2) (3)
Name or other designation of the offshore installation Latitude Longitude
Schiehallion Central 60°20'08.76"N 04°02'05.08"W
Schiehallion West 60°19'58.52"N 04°05'49.56"W
Schiehallion North 60°22'10.71"N 04°01'28.73"W
Schiehallion Loyal 60°24'42.72"N 04°03'18.35"W
Schiehallion Gas Disposal 60°19'43"N 04°09'40"W
Galahad Tee 53°31'21"N 01°21'58"E
Larch-Well X (23) Z6 58°35'43.48"N 01°15'20.81"E
Larch-Well X (24) Z7 58°35'49.047"N 01°15'27.36"E