1 
This order may be cited as the Offshore Installations (Safety Zones) Order 1996 and shall come into force on 7th February 1996.
2 
A safety zone is hereby established around each installation specified in column 1 of the Schedule hereto (being an installation stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of the Schedule.
Signed by authority of the Secretary of State.
Paul Beresford
Parliamentary Under-Secretary of State,
Department of the Environment
17th January 1996
SCHEDULE
Article 2


(1) (2) (3)
Name or other designation of the offshore installation Latitude Longitude
South Magnus Water Injection Well 61° 32'23.99"N 01° 15'42.77"E
South Magnus Production Well 61° 34'4.78"N 01° 15'44.21"E