
1 
This order may be cited as the Offshore Installations (Safety Zones) (No. 4) Order 1995 and shall come into force on 10th August 1995.
2 
A safety zone is hereby established around each installation specified in column 1 of the Schedule hereto (being an installation stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of the Schedule.
Signed by authority of the Secretary of State.
Paul Beresford
Parliamentary Under Secretary of State,
Department of the Environment
20th July 1995
SCHEDULE
Article 2


(1) Name or other designation of the offshore Installation (2) Latitude (3) Longitude
Fife Field Wellhead 1 56° 00' 10.45"N 03° 11' 05.55"E
Fife Field Wellhead 2 56° 00' 34.39"N 03° 11' 36.20"E
Birch Field Manifold 58° 34' 52.00"N 01° 15' 40.00"E
Nevis Field Wells 59° 31' 56.07"N 01° 24' 25.45"E
KT Well 59° 34' 04.43"N 01° 28' 51.80"E
South Scott Manifold 58° 14' 54.91"N 00° 10' 45.52"E
Foinaven Drilling Centre 1 60° 18' 39.8"N 04° 20' 15.9"W
Foinaven Drilling Centre 2A 60° 20' 37.5"N 04° 14' 43.2"W
Foinaven DC2 West Water Injection 60° 20' 55.2"N 04° 17' 35.1"W
Foinaven DC2 East Water Injection 60° 19' 25.8"N 04° 12' 47.008"W
Liverpool Bay Pipeline End Manifold 53° 41' 0.115"N 03° 32' 42.974"W