
1 
This Order may be cited as the Offshore Installations (Safety Zones) (No. 3) Order 1988 and shall come into force on 3rd September 1988.
2 
A safety zone is hereby established around each of the installations specified in Column 2 of the Schedule hereto (being installations stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects each installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified with respect to the installation in Columns 3 and 4 of the Schedule.
Cecil Parkinson
Secretary of State for Energy
12th August 1988
SCHEDULE
Article 2


1 2 3 4
Number Name or other designation of the offshore installation Latitude North Longitude East
1 Audrey Well 49/11A—7 53° 32' 28.31" 02° 00' 32.35"
2 Beryl Well 9/13A—35 59° 30' 43.35" 01° 31' 49.87"
3 Crawford Well 9/28A—9 59° 06' 57.86" 01° 29' 30.61"
4 Della Well 48/30—11 53° 04' 43.81" 01° 53' 19.92"
5 Ivanhoe/Robroy Riser Base Manifold 15/21 58° 11' 35.36" 00° 06' 40.73"
6 Ivanhoe Manifold 15/21 58° 11' 12.21" 00° 05' 19.70"
7 Robroy Manifold 15/21 58° 11' 50.88" 00° 08' 07.95"